Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Fee/PreQual/Technical/Finance WATHORA CHADOORA BUDGAM KASHMIR J K 191113 | CHADOORA | BUDGAM | JAMMU AND KASHMIR | 191113 | -38.85% | ₹1.4 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 Cr+₹2.0 L (1.39%)Admitted-Fee/PreQual/Technical/Finance | -38.00% | ₹1.4 Cr+₹2.0 L (1.39%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 Cr+₹9.5 L (6.79%)Admitted-Fee/PreQual/Technical/Finance 2ND FLOOR MIR MALL SMC ROAD OPPOSITE DISTRICT POLICE LINES KARAN NAGAR SRINAGAR JAMMU AND KASHMIR SRINAGAR JAMMU KASHMIR 190010 | SRINAGAR | JAMMU AND KASHMIR | 190010 | -34.70% | ₹1.5 Cr+₹9.5 L (6.79%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 Cr+₹10.6 L (7.52%)Admitted-Fee/PreQual/Technical/Finance | -34.25% | ₹1.5 Cr+₹10.6 L (7.52%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.5 Cr+₹13.5 L (9.57%)Admitted-Fee/PreQual/Technical/Finance | -33.00% | ₹1.5 Cr+₹13.5 L (9.57%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
30 Apr 2026, 4:00 pmClosed
Executive Engineer RnB Division Beerwah
Office of the Executive Engineer RnB Division Beerwah
Reconstruction of Gutted Building RNB Division Beerwah.
2026_PWDJK_307981_1
NIT No.05 of 2026-27
Open Tender
Civil Works
Percentage
365 days
Beerwah
As per NIT
2 documents required · 2 mandatory
₹5,500
Executive Engineer RNB Division Beerwah
₹4.6 L
12 May 2026
16 Apr 2026
1 May 2026
16 Apr 2026
30 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. : All kinds of soil : | |||||
| 2Providing and laying of stone soling hand packed all inclusive leads, lifts, loading, unloading, head load, ramming/ dressing and carriage of materials from approved sources to site of work complete. | |||||
| 3Supplying and Filling in plinth with boulders/GSB/ under floors including ramming,watering,consolidating complete as per directions of engineer in charge, incl. all carriages. | |||||
| 4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | |||||
| 5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | |||||
| 6Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
| 8Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 9Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 10Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_998592.xls
BOQ • 0.40 MB
guttedcorrg.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .