Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹16.8 L+₹1.9 L (12.8%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹17.3 L+₹2.4 L (15.8%)Rejected-Finance | L3 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹14.5 L
EMD Value
₹29,000
Closing Date
5 Oct 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SHRI JANAK RAJ EE GARRISON ENGINEER NW
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802.
8277/E8
2020_MES_329514_4
8277/E8
Open Tender
Civil Works
Item Rate
364 days
VASCO
Class E Category d v
8 documents required · 8 mandatory
₹500
Yes
GE NW VASCO
₹29,000
Yes
27 Oct 2020
7 Sept 2020
7 Oct 2020
7 Sept 2020
5 Oct 2020
21 Sept 2020
8 Sept 2020 - 21 Sept 2020
60 days
Amount
Labour for finding faults and making serviceable SFC/ TRUs/ UPS of different capacity as available on site, by replacement/ rectifying control wiring, required PCB cards and other connected accessories and making fully functional on full load, complete all as specified and directed by Engineer-in-Charge. Note: - (a) After lodging complaint, it should be attended within 24 hours (b) Spares required will be measured and paid separately under relevant items.
Material and labour to carry out full load test by providing necessary water loads and connected items for each SFC upto 80 KVA capacity for checking the performance complete all as specified and directed by the Engineer-in-Charge /and upto the users satisfaction.
Material and labour to carry out full load test by providing necessary water loads and connected items for each TRU upto 20 KW capacity for checking the performance complete all as specified and directed by the Engineer-in-Charge /and upto the users satisfaction. Note:- (i) Necessary Load test certificate will be provided by the contractor for item ser No 2 & 3. (ii) Electricity will be provided free of cost by the department for necessary load testing. (iii) All items like cables, water tank and loads will be arranged at contractor's end.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer-in-Charge suitable for 80KVA installed at H2 Hangar (NAY-G ) North side. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 115V installed at H2 hangar (NAY-G) dispersal side. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 115 V installed at H2 hangar (NAY-G ) North side. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 36 V AC installed at H2 hangar (NAY-G) dispersal side. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 36 V AC installed at H2 hangar (NAY-G ) North side. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KVA (No 1) installed at H3 hangar. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KVA (No 2) installed at H3 hangar. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KVA (No 3) installed at H3 hangar. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 10 KVA 36 V installed at H3 hangar. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance SFC including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KVA installed at H1 hangar. Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance TRU including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KW installed at H2 hangar (dispersal side). Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance TRU including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KW installed at H2 hangar (North side). Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance TRU including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 10 KW installed at H3 hangar (dispersal side). Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance TRU including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 10 KW installed at H3 hangar (North side). Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance TRU including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 10 KW installed at H1 hangar . Note: - (a) Spares required will be measured and paid separately under relevant items.
Preventive maintenance UPS including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KVA installecd at H3 hangar (Dispersal Side) Note: - (a) Spares required will be measured and paid seperately under relevant items.
Preventive maintenance UPS including checking quarterly for its smooth functioning and working performance, checking all electrical connections replacing the worn out electrical parts complete all as directed by Engineer in charge suitable for 20 KVA installed at H3 hangar (North Side). Note: - (a) Spares required will be measured and paid separately under relevant items.
Supply & fix only charger control card for SFC of capacity 36/115/208 Volts
Supply & fix only Charger firing cards for SFC of capacity 36/115/208 Volts
Supply & fix 3 phase control transformer for SFC of capacity 36/115/208 Volts
Supply & fix DC-DC card for SFC of capacity 36/115/208 Volts
Supply & fix inverter control card for SFC of capacity 36/115/208 Volts
Supply & fix inverter driver card for SFC of capacity 36/115/208 Volts
Supply & fix Synchronization card for SFC of capacity 36/115/208 Volts
Supply & fix 3 phase output feedback transformer for SFC of capacity 36/115/208 Volts
Supply & fix MON card for SFC of capacity 36/115/208 Volts
Supply & fix AC capacitor 120 mfd 250 VAC for SFC of capacity 36/115/208 Volts
Supply & fix AC capacitor 60 mfd 440 VAC for SFC of capacity 36/115/208 Volts
Supply & fix IGBT 100 Amp/600V for SFC of capacity 36/115/208 Volts
Supply & fix IGBT 75 Amp/600V for SFC of capacity 36/115/208 Volts
Supply & fix charger control card for UPS
Supply & fix charger driver card for UPS
Supply & fix DC-DC card for UPS
Supply & fix inverter control card for UPS
Supply & fix inverter driver card for UPS
Supply & fix synchronization card for UPS
Supply & fix 3 ph output feedback transformer for UPS
Supply & fix static switch control card for UPS
Supply & fix static switch driver card for UPS
Supply & fix static transformer PCB
Supply & fix 3ph control transformer for TRU
Supply & fix charger control card for TRU
Supply & fix Battery 12 Volts, 26AH Make : Exide / Amco
star freeze service
OM SAI ELECTRICALS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .