Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-AOC 118 SHIRGAL DHARGAL PERNEM GOA | NORTH GOA | GOA | 403001 | ₹16.1 L | L1 | Accepted-AOC Lowest Quote |
| 2 | L2₹16.1 L+₹153.51 (<0.01%)Rejected-Finance H NO 264 1 WARD NO 03 DEULWADA PALIEM PERNEM GOA | ₹16.1 L+₹153.51 (<0.01%) | L2 | Rejected-Finance Highest Quote |
Tender Value
₹15.4 L
EMD Value
₹30,702
Closing Date
2 Jun 2026, 3:00 pmClosed
Executive Engineer
SPACES building 7th Floor Patto Plaza
Construction of shed near Kuldevasthan in ward No.4 at Harijanwada V.P. Ozarim Pernem-Goa.SC ST Funds
2026_DRD_29357_1
DRDA-N/GGSY/TN/08/26-27/77/L2
Open Tender
Civil Works - Buildings
Percentage
Ozarim Pernem
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹30,702
14 Jul 2026
21 May 2026
3 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation pipeline trenches, drain in saturated soil upto a depth of 0.60 m lift upto 1.50 m including shoring, strutting and pumping/bailing out water stacking the excavated soil not more than 5 m. clear from the edge the excavation and returning the stacked soil in 0.15 m layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming, watering and disposing of all surplus excavated soil within a lead upto 20m. | 135.52 | cu.m | 822 | ₹1,11,397.44 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 45.24 | cu.m | 2,211 | ₹1,00,025.64 |
| 3Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | All works upto plinth level | 11.46 | cu.m | 6,192 | ₹70,960.32 |
| 4Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters)and planted in position ready for driving: | |||||
| 4.01 | Upto 2.5 meters long pile | 62.5 | Metre | 192 | ₹12,000 |
| 5Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) | |||||
| 5.01 | Upto 2.5 meters long pile | 62.5 | Metre | 305 | ₹19,062.5 |
| 6Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 mm nominal size)excluding cost of centering, shuttering and finishing : | |||||
| 6.01 | All works upto plinth level | 48.8 | cu.m | 6,635 | ₹3,23,788 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_29780.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .