Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC 60 19 CHANOT 125033 | CHANOT | HISAR | HARYANA | 125033 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹9.4 L+₹1.3 L (15.7%)Rejected-Finance | L2 | Rejected-Finance Higher rate to the contractor | |
| 3 | Rejected-Technical | - | Rejected-Technical Not responsive |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
19 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (PH)
Estate Office, CCS HAU, Hisar
Construction of underground water storage tank of average size 60 feet x 60 feet x 5 feet alongwith feeding water channel for Centre for Micro Propagation and Doubled haploid production, Department of MBB and B at CCS HAU, Hisar
2023_HRY_279591_1
3339-C
Open Tender
Civil Works
Works
60 days
Executive Engineer (PH)
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹10,000
Yes
1 Mar 2024
5 May 2023
20 May 2023
6 May 2023
19 May 2023
6 May 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (HSR 4.14.1)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size) (HSR 6.1.2)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 1 :2:4 (1 Cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 20 mm nominal size) (HSR 6.2.2)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: (HSR 6.14.1) 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size). (HSR 6.16)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diaMeters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Thermo-Mechanically Treated bars of grade Fe-500D kg or more. (HSR 6.33.6)
Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand) (HSR 7.20.1)
Providing and laying of conglomerate floor 50mm thick cement concrete topping 1 :2:4 (HSR 10.7)
Providing and laying of flat brick or tile flooring with bricks of class designation 7 .5 laid dry over a bed of 6 mm thick cement sand mortar 1 :6 grouted with cement sand mortar 1 :4 and top surface to be left clean after wire brushing. (HSR 10.35.2)
Cement Concrete 1 :8:16 Flooring Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. (HSR 10.100.2)
12 mm cement plaster of mix : 1 :3 (1 cement: 3 fine sand) (HSR 11.5.2)
12 mm cement plaster of mix : 1 :4 (1 cement: 4 fine sand) (HSR 11.5.3)
Cement rendering on plaster 1 mm thick (HSR 11.52)
Dressing bed and preparation of sub grade for lining by mechanical/ mannual means (HSR 14.1)
Double layer tile lining for water storage tanks, as per specifications of item No. 14.7 but including cost of dressing sub-grade providing scaffolding and curing etc. complete in all respects. In bed (HSR 14.25.1)
Double layer tile lining for water storage tanks, as per specifications of item No. 14.7 but including cost of dressing sub-grade providing scaffolding and curing etc. complete in all respects. On Side slopes (HSR 14.25.2)
Providing and fixing RCC Nakkas of size 24" x 24" with panel & lid (Heavy duty), complete in all respect as per direction of the Engineer-in Charge. (NS)
JAGAT SINGH CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .