Tender Value
₹2.9 Cr
EMD Value
₹2.9 L
Closing Date
23 Apr 2025, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
GEN WORKS
25 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
NOTE: If the tender is not accompanied by the certificate(s) in support of financial eligibility as above, the tender shall be rejected. No post-tender correspondence will be entertained.
The tenderer or his site supervisor should have minimum valid 'A' Grade Electrical Contractor's License issued by State Electrical Licensing Board. The License should have been issued on a date prior to the date of Tender opening. Clear scanned copy is to be submitted along with the tender.
17 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the official nominated (i.e Os/Tenders/Engg/____Division) as indicated in the tender document before closing date for submission of bids. (i.e., excluding the last date of submission of Bids)
All the instructions furnished in the Technical Compliance / Commercial Compliance / Custom / Undertakings / General lnstructions / Undertakings are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
Tender value is including escalation of (-) 20% (minus twenty percent) on CPWD DSR rates. Tenderer should note this before quoting the rates.
Electrical Construction/GTL: Guntakal Division: Electrical arrangements for Court building, Goomties, TTE rest house, Track machine staff rest house, C&W Office, FOB, Platform lighting etc. and new substation with 2x250 KVA transformer, dismantling of existing sub-station and shifting/modification of LT/HT parallel overhead lines at Renigunta station in connection with Renigunta Yard modification works.
01-2024-2025-E-GS-CN-GTL
01-2024-2025-E-GS-CN-GTL
Open
Works - General
6 Months
Unknown (Unspecified Location)
₹0
₹2.9 L
23 Apr 2025
1 Apr 2025
259 items across 106 schedules · ₹1,85,96,097 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Metre | 2300.00 | 38 | 87,400 | |
| 2 | Metre | 2300.00 | 12 | 27,600 | |
| Item- 2 | (ISI MARK) junction etc. | concealed in boxes etc. | roof slab and including | wall grooving (if | |
| Schedule total | ₹1,15,000 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .