Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9.7 Laccepted-aoc | accepted-aoc |
Tender Value
₹9.7 L
EMD Value
₹25,000
Closing Date
22 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
Executive Engineer PWD Division Kalaburgi
CONSTRUCTION OF RCC DRAIN FROM CHANDRAKANTH S/O SHIVASHARNAPPA HOUSE OF KAGE LAYOUT TO RAMESH S/O SHANKAR SHIKARI OF JANATA COLONY IN JEWARGI TALUKA UNDER KKRDB (MACRO) FOR THE YEAR 2023-24 KLB2310141367 NON SOCIAL SCP
PWD/2026-27/RD/WORK_INDENT41447
PWD/2026-27/RD/WORK_INDENT41447
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Kalaburagi
₹500
₹25,000
22 Sept 2026
4 Sept 2026
21 Sept 2026
90 days
CONSTRUCTION OF RCC DRAIN FROM CHANDRAKANTH S/O SHIVASHARNAPPA HOUSE OF KAGE LAYOUT TO RAMESH S/O SHANKAR SHIKARI OF JANATA COLONY IN JEWARGI TALUKA UNDER KKRDB (MACRO) FOR THE YEAR 2023-24 KLB2310141367 NON SOCIAL SCP
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Flooring with 25mm thick polished shahabad slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with p...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Centering & Shuttering Charges 35 Percent
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW 1- 41447.docx
Tender Document • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .