Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 CrAccepted-AOC | ₹1.9 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.9 Cr+₹31,041.92 (0.16%)Rejected-AOC NOWBUGH CHADOORA | JAMMU | JAMMU AND KASHMIR | 180001 | ₹1.9 Cr+₹31,041.92 (0.16%) | 2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
14 Jun 2021, 4:30 pmClosed
Superintending Engineer PMGSY Circle Srinagar
Engineering Complex, Block - C, Rajbagh , Srinagar
Renewal coat / Macadamisation and maintenance of road Arizal to Waterihal, Length 11.80Kms, JK02-WB02, PMGSY Division Budgam
2021_KSRRD_110336_1
NIT No. 04/SE/PMGSY/S/2021-22 Dt 29/05/2021
Open Tender
CIVIL
Item Rate
270 days
Budgam
Please refer Tender documents.
18 documents required · 18 mandatory
₹10,000
Accounts Officer PMGSY Kashmir
₹3.9 L
Yes
Srinagar
13 Jul 2021
29 May 2021
15 Jun 2021
30 May 2021
14 Jun 2021
3 Jun 2021
2 Jun 2021
Amount
PART A: PAVEMENT
Scarifying the existing Bituminous Surface to a depth of 50mm and disposal of scarified material within all leads and lifts upto 1km
Providing, laying, spreading & compacting stone aggregates of specific sizes to Water Bound Macadam (G-II) specification incld. spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100kN static roller in stages to proper grade and camber, applying & brooming with crushable, stone screening, binding materials to fill up the interstices of coarse agg., watering and compacting to the required density grade 2 as per technical specification clause 405.manual means.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Providing and Laying Tack Coat with Bitumen (RS-1) using emulsion distributor @ 0.20 to 0.25 Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom as per technical specification clause 503.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Providing, laying 25 mm thick semidense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronice sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge, 25mm compacted thickness with bitumen of grade VG-10 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of aggregate) prepared in Drum Type Hot Mix plant of 60-90 TPH capacity) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A/B as per Technical Specification Clause 510.specification 1995) by Mech. means using bitumen (S-90) .including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Construction of Earthen Shoulder using ordinary earth with all leads and lifts and transport to site and compact with a lead upto 1000m as per Technical Specification Clause 303.1 (Complete job as directed by the engineer)
PART B: PCC Drain/ Earthen Drain
Earthwork in excavation for structures as per drawings and MORD technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto required lead , dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary/hard soil upto required depth.
Type B (First Class) bedding, Laying (first class) bedding of well compacted sand, moorum or approved granular material as per MORD technical specification clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Providing concrete for plain cement concrete in open foundations complete as per drawings and Technical Specifications clause 802, 803, 1202, & 1203 in PCC M-10 Nominal Mix (1:3:6) including cost of form-work & incl. cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Providing conc. for plain cement concrete in open foundation complete as per drawings and MORD technical specification clauses 802, 803, 1202, and 1203 PCC Grade M-15 (1:2.5:5) Nominal mix.including cost of form-work & incl. cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
PART C: BREAST WALL
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain cement concrete in open foundations complete as per drawings and Technical Specifications clause 802, 803, 1202, & 1203 in PCC M-10 Nominal Mix (1:3:6) including cost of form-work & incl. cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Random Rubble Stone masonry, uncoursed brought to course in cement sand mortar 1:5, with quarry stones in foundation and plinth incl cost of bond stones and levelling up at specified levels with M-5 grade ( stone aggregate 20mm size)incl. cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading, unloading and octori.
Random Rubble Stone Masonary, uncoursed brought to Courses with quarry stones laid dry in foundation and plinth as per drawings and technical specifications clauses 702.1, 702.4, 703 & 704 incl. Cost of bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.
Providing PCC M20 Plain Coping on the top of Retaining wall/Breast wall. complete as per drawing and technical specification Clause 615,710 &1204.3.11. complete job as directed by the engineer
Maintenance Cost of 1st year
Maintenance Cost of 2nd year
Maintenance Cost of 3rd year
Maintenance Cost of 4th year
Maintenance Cost of 5th year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
UMAR SOIL CONSTRUCTIONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .