Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC STATION ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹4.4 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹4.6 LRejected-Finance BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹4.6 L | L2 | Rejected-Finance TC recommendation |
| 3 | Rejected-Technical DAG NO 381 368A KHATIYAN NO 2874 UKHRA PANDAVESWAR 713363 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | M S ELECTRICALS L2 | DUTTA ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00item discription | |||||
| 2.00 | (1) 40HP motor Super enameled Copper wire | 24 | Kgs | 952.3 ₹22,855.20 | 952.3 ₹22,855.20 |
| 3.00 | F' class insulating materials, dr. Beck, varnish etc. (15% of S.E. Copper wire) | 1 | Ls | 3,750 ₹3,750 | 3,520 ₹3,520 |
| 4.00 | Flexible glass leads for terminal connection | 1 | Ls | 3,500 ₹3,500 | 3,300 ₹3,300 |
| 5.00 | Soldering like soldering stick | 1 | Ls | 1,700 ₹1,700 | 1,650 ₹1,650 |
| 6.00 | Decarbonising, cleaning, varnish, nut, bolt | 1 | Ls | 2,500 ₹2,500 | 2,200 ₹2,200 |
| 7.00 | Mechanical job: both side shaft as per bearing size housing sleeve changing. | 1 | Ls | 5,250 ₹5,250 | 4,950 ₹4,950 |
| 8.00 | Both side housing bearing welding, machining as pe bearing size. | 1 | Ls | 4,500 ₹4,500 | 4,400 ₹4,400 |
| 9.00 | Rotor shaft rebuilding as per proper size | 1 | Ls | 4,500 ₹4,500 | 4,400 ₹4,400 |
| 10.00 | Bar bleazing by Rupto bar | 46 | Nos | 250 ₹11,500 | 250 ₹11,500 |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
10 Mar 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
(A) Complete repairing and rewinding of (a) 40 hp krloskar make (B) Complete repairing and rewinding of (A) 2.5KVA/110V ABC (C) Complete rewinding and repairing of NGF Make 720 RPM 550 V Slipring
2026_ECL_355078_1
ECL/GM/BA/E TENDER/25-26/ENM/309 Dt 28.02.2026
Open Tender
Electrical and Maintenance Works
15 days
Shankarpur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,600
8 May 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
28 Feb 2026 - 4 Mar 2026
item discription
(1) 40HP motor Super enameled Copper wire
F' class insulating materials, dr. Beck, varnish etc. (15% of S.E. Copper wire)
Flexible glass leads for terminal connection
Soldering like soldering stick
Decarbonising, cleaning, varnish, nut, bolt
Mechanical job: both side shaft as per bearing size housing sleeve changing.
Both side housing bearing welding, machining as pe bearing size.
Rotor shaft rebuilding as per proper size
Bar bleazing by Rupto bar
Dismantling, refitting charges of motor
Motor rewinding charges (15% of S.E. Copper wire)
(2)40HP motor Super enameled Copper wire
F' class insulating materials, dr. Beck, varnish etc. (15% of S.E. Copper wire)
Flexible glass leads for terminal connection
Soldering like soldering stick
Decarbonising, cleaning, varnish, nut, bolt
Motor shaft broken opening by hydraulic jack
Supply of new Metal shaft (EN-24)
Mechanical job: both side shaft as per bearing size housing sleeve changing.
Both side housing bearing welding, machining as per bearing size.
Rotor shaft rebuilding as per proper size
Bar bleazing by Rupto bar
Dismantling, refitting charges of motor
Motor rewinding charges (15% of S.E.
(A) ABC make Drill Panel Complete rewinding of transformer coil with super enameled copper wire & good insulation materials after deduction of scrap value.
Supply & fixing of terminal with insulator
Supply & fixing of contactor Unit
Supply & fixing of Thermal overload.
Supply & fixing of Earth leakage relay
Supply & fixing of fuse with carrier
Supply & fixing of 12 Point connector,
Supply & fixing of wiring wire
Supply & fixing of Isolator
reparing cost
(B) Technogeneous make Drill panel Complete rewinding of transformer coil with super enameled copper wire & good insulation materials after deduction of scrap value.
Supply & fixing of terminal with insulator
Supply & fixing of contactor Unit
Supply & fixing of Thermal overload
Supply & fixing of Earth leakage relay
Supply & fixing of lamp holder
Supply & fixing of wiring wire
Supply & fixing of Isolator
Repairing Cost
Complete rewinding and repairing of NGF Make 720 RPM 550 V Slipring type S.E. Copper wire
F' class insulating materials (15% of S.E.Copper wire)
Cost of flexible glass lead for terminal
Soldering materials for connection.
Labour for rewinding of starter (15% of S.E.Copper wire)
Dismantling and refitting motor
Mechanical repairing of both side shaft as per bearing size
Taking out bearing, repairing of bearing portion
Dismantling and removing of old copper
Supply of copper strip
F class insulating materials (15% of S.E.Copper wire)
Insertion of copper wire into rotor
Soldering materials
Labour cost for assembling & fitting
Repairing of slip ring by copper brass
Supply and fixing of joint make with MS
Transporting, Loading, Unloading Charges
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 1.20 MB
Tendernotice_3.pdf
PDF • 0.20 MB
BOQ_367920.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid