| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC 94 9 DAYANAGAR ROAD COSSIMBAZAR MURSHIDABAD W B 742102 | MURSHIDABAD | MURSHIDABAD | WEST BENGAL | 742102 | ₹10.0 L | 1 | Accepted-AOC 1ST LOWEST BIDDER |
| 2 | 2₹10.1 LRejected-Finance | ₹10.1 L | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹10.9 LRejected-Finance 119 A 1 BAGHAJATIN REGENT ESTATE SOUTH 24 PARGANAS KOLKATA WEST BENGAL 700092 | KOLKATA | WEST BENGAL | 700092 | ₹10.9 L | 3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
29 Jan 2026, 3:00 pmClosed
E.E.-VI
1, HOGG STREET, KOLKATA-87
IMPROVEMENT OF SEWER LINE AND ROAD SURFACE FROM 3 TO 35C GIRISH CH BOSE ROAD IN WD-054.
2026_KMC_993673_1
-KMC/DG(C)/APAS/01/163/5/0001 (2ND CALL)
Open Tender
CIVIL WORKS
45 days
WARD 54
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
20 Feb 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
29 Jan 2026
24 Jan 2026
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 6. Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m.
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(i) 300 mm
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
Construction of special inspection chamber pit of size 900mm. X 600mm. (inside measurement) without shaft with 250mm. thick cement brick work (1:4) over150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing 450mm. dia. (15 M.T.) heavy duty R.C.P.C. cover and frame (15 M.T. load-bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 kg. each) including cutting hard crust, excavation, dewatering, back filling and removal of spoils but excluding shoring as per standard drawing .(depth of invert between 1.15m. to 1.80m. below G.L.) i) Average depth of invert 1.15 m. below G.L.
Construction of special inspection chamber pit of size 900mm. X 600mm. (inside measurement) without shaft with 250mm. thick cement brick work (1:4) over150mm. thick jhama cement conc. (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick on edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing 450mm. dia. (15 M.T.) heavy duty R.C.P.C. cover and frame (15 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 kg. each) including cutting hard crust, excavation, dewatering, back filling an removal of spoils but excluding shoring as per standard drawing .(depth of invert between 1.15m. to 1.80m. below G.L.) ii) Addition and deduction of rate of special inspection chamber pit as per above item for each addition or reduction in depth of 150 mm. or part thereof.
22.Construction of gullypit 1100mmX625mm. inside measurement and depth of invert 1500mm. below G.L. with 250mm. thick cement brick work (1:4) over 100mm. thick jhama cement concrete (1:4:8) bed over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary cement concrete (mix 1:1.5:3) with reinforcement as per standard drawing, brickon-edge flooring in the invert, 20 mm. thick cement plaster (1:4) finished fine with 1.5 mm. thick neat cement in the inside of walls and invert including supplying, fitting and fixing R.C.P.C. gully grid (15-M.T.load bearing capacity) and 225 mm. dia. C.I. Syphone including cutting hard crust, excavation, dewatering, back filling and removal of spoils as per standard drawing
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (a) For Fine Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3)
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.09 Page No.247 & page-222 sl. No- 2 & 5 (g))
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting. guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work) , page-249(item-4.12) & 212(table3.3-1) and 4th Addenda & Corrigenda)
Bituminous Macadam using Hot Mix Plant(HMP) (Using bitumen VG-40) Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired -compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). A. For Grading 2(19.0 mm nominal size, 50-75mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table-3.3-1) & 251&252(item 5.03). 7th Addenda & Corrigenda SOR 2018)
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Estimated amount
Add: 9%SGST
Add: 9%CGST
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_2430798.xls
BOQ • 0.31 MB
F1635.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid