| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAccepted-AOC | L1 | Accepted-AOC As per Tender committee recommendation and approval of competent authority | |
| 2 | L2₹27.2 L+₹965.25 (0.04%)Rejected-Finance | L2 | Rejected-Finance As per Tender committee recommendation and approval of competent authority | |
| 3 | L3₹27.6 L+₹38,577.66 (1.42%)Rejected-Finance AT PO HECHABALIYA SARADHU TANDWA DIST CHATRA JHARKHAND 825321 | CHATRA | JHARKHAND | 825321 | L3 | Rejected-Finance As per Tender committee recommendation and approval of competent authority | |
| 4 | L4₹28.9 L+₹1.7 L (6.25%)Rejected-Finance | L4 | Rejected-Finance As per Tender committee recommendation and approval of competent authority | |
| 5 | L5₹30.1 L+₹2.9 L (10.7%)Rejected-Finance | L5 | Rejected-Finance As per Tender committee recommendation and approval of competent authority |
Tender Value
₹39.0 L
EMD Value
₹48,700
Closing Date
25 Sept 2023, 5:00 pmClosed
Staff Officer(C), A-C Area
Office of The General Manager, Amrapali-Chandragupta Area, Honhey, Tandwa, 825321
Repairing of Light vehicle road and RCC Drain from Sub-Station to Coal Sampling Room under Amrapali Project of A-C Area, CCL.
2023_CCL_288630_1
GMAC/SOC/Tender/23-24/62/517
Open Tender
Civil Works - Others
Item Rate
60 days
Amrapali OCP, A-C Area
Please refer tender Notice
3 documents required · 3 mandatory
₹48,700
15 Nov 2023
14 Sept 2023
26 Sept 2023
15 Sept 2023
25 Sept 2023
15 Sept 2023
15 Sept 2023 - 18 Sept 2023
Amount
PART-A : Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ). 1200 mm dia
Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coatof neat cement complete as per standard design :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
PART-B: Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) . for grading- I Material
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Total impact of GST for the purpose of CTC
M/S-YADUVANSHI ENTERPRISES
Divyam Steel
M/S M A CONSTRUCTION
BABLU KUMAR
AKHILESH PRASAD
MITHLESH KUMAR SINGH
BINAY KUMAR
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_299047.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .