Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54,400Accepted-AOC BHAGWATI NAGAR JAMMU | L1 | Accepted-AOC Lowest | |
| 2 | L2₹55,800+₹1,400 (2.57%)Rejected-AOC | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹57,200+₹2,800 (5.15%)Rejected-AOC | L3 | Rejected-AOC Not Lowest |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
2 Feb 2021, 11:00 amClosed
Executive Engineer MICD Jammu
Executive Engineer MICD Krishna Nagar Jammu
Repairs / servicing of gates and hoist system including lowering of gates at Check Dam Pranjali in Kathua
2021_IFC_114377_1
MICD/J/37 of 2020-21 dated 22/01/2021
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
5 days
Pranjali Hiranagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
Executive Engineer MICD Jammu
₹1,200
Yes
13 Feb 2021
23 Jan 2021
2 Feb 2021
23 Jan 2021
2 Feb 2021
23 Jan 2021
Amount
Dismantling of double rope drum manually operated hoist system of 09 Nos. gates at Check dam Pranjali in Kathua then unwinding of steel wire rope from the gates and drums. Cutting the extra length of wire rope due to elongation of wire rope so that original length is maintained. Again winding of rope in the drums after passing it through the pulleys of gates. Clamping ends and lubrication of the ropes. Care should be taken to prevent the jumping of rope out of the groove of pulley. Checking of oil level in gear box, topping up the gear oil as required, greasing of the movable parts, assembling the hoist system after checking and ensuring that up and down travelling of the gates is smooth and trouble free. The job further includes adjustment of seals to minimise leakage. Complete job at site includes cost of material, hire charges of tools & tackles and labour charges on a/c of skilled labour required for execution of work.
Dismantling of double rope drum manually operated hoist system of 01 No. gate at Check dam Pranjali in Kathua then unwinding of steel wire rope from the gates and drums. Fabrication and fitting of bush and key to the shafts. Cutting the extra length of wire rope due to elongation of wire rope so that original length is maintained. Again winding of rope in the drums after passing it through the pulleys of gates. Clamping ends and lubrication of the ropes. Care should be taken to prevent the jumping of rope out of the groove of pulley. Checking of oil level in gear box, topping up the gear oil as required, greasing of the movable parts, assembling the hoist system after checking and ensuring that up and down travelling of the gates is smooth and trouble free. The job further includes adjustment of seals to minimise leakage. Complete job at site including cost of material, hire charges of tools & tackles and labour charges on a/c of skilled labour required for execution of work..
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .