Loading…
Loading…
Tender ID
Tender Value
₹4.8 L
EMD Value
₹9,635
Closing Date
28 Jan 2026, 11:50 amClosed
AGM(E)-III, WB HIDCO Ltd.
Dhana Dhanya Auditorium, Alipore, Kolkata
Renovation of interior of stable inside Shilpanno in alipore, Kolkata.
2026_HIDCO_991870_1
573/HIDCO/AGM-III/NIT-23/25-26
Open Tender
CIVIL WORKS
Percentage
15 days
Alipore
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,635
10 Feb 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In Ground Floor
Labour for cleaning Rubbish at dumped at alloted area by the authority
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (e) Sal : Malayasian
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (b) 40mm X 6mm, 200mm Length
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. (vi) 100mm. X 50mm. X 1.25mm.
Supplying solid flush type doors of commercial quality, the timber frame consisting of top and bottom rails and side styles of well seasoned timber 65mm wide each and the entire frame fitted with 37.5mm wide battens places both ways in order to make the door of solid core and internal lipping with Garjan or similar wood veneers using phenol formaldehyde as glue etc. complete, including fitting, fixing shutters in position but excluding the cost of hinges and other fittings in ground floor. (b) 32 mm thick shutters (single leaf)
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On timber or plastered surface Two coats (with any shade except white)
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m Weight = 25x40x3 Rectangular Hollow Section (2.70 Kg/m)
Painting with ready mixed red lead paint of approved make and brand : Two Coat
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface : Two coats (with any shade except white)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing (a) For works in foundation and upto roof of ground floor/upto 4 m and direction. (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. 1st Floor
Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] 1st Floor
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete (ii) With 1:4 cement mortar (b) 15 mm thick plaster
Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/Acrylic emulsion paint including scraping and preparing the surface throughly,complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (a) One Coat i) Water based interior grade Acrylic Primer
Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick)
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) a) Normal Acrylic Emulsion
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (b) Two Coat
Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987. xiii) 12mmthickcleared toughenedglass coforming to IS: 2553-1992 (Part-II)
Supplying & fixing S/S patch fittings 90º SS connector Glass To wall.
Supplying and affixing optically clear polyester sun control window film having acrylic pressure sensitive adhesive on one side & anacrylic abrasion resistant coating on the other,with composition of infrared absorbing carbon & free from any optical defect. The film characteristics should conform to ASTME 308, ASTME 903, ASTM E84 and ASHIRAE.The film should be pasted after preparatory works without any cracking, delamination, bubbling, discolouring and variationin total transmission of light across the width a tany portion along the length doesn't exceed 2% over the average including scaffolding & relevant others to complete in all respect as per manufacturer's specification & direction of Engineer-in-Charge. (Note:This work should not be executed without specific permission of Superintending Engineer) (a) NormalQuality :FilmThickness-1.0Mil,GlareReduction> 45%, U factor < 1.15
Add CGST @9% of total amount to Rs.4,04,835.86
Add SGST @9% of total amount to Rs..Rs.4,04,835.86
Add Construction Cess @1% of total amount to Rs..4,04,835.86
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.49 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2425119.xls
BOQ • 0.35 MB
2911.pdf
Tender Documents • 0.16 MB
TENDER_DOC.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .