Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹3.9 L | L1 | Accepted-AOC TCR |
| 2 | L2₹4.0 LRejected-Finance SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹4.0 L | L2 | Rejected-Finance TCR |
| 3 | L3₹4.1 LRejected-Finance P O PANDESWAR DANNYA BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹4.1 L | L3 | Rejected-Finance TCR |
| Sl No | Description | Qty | Unit | PRASHANTA KABIRAJ L1 | HAREKRISHNA ENTERPRISE L2 | AZAM ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Discription of items | ||||||
| 2.00 | Lowering of Pump, Motor, Bed plate through cage & Transport from OL/OD Haulage & 4L/20D junction branch line | 1 | ls | 16,312 ₹16,312 | 16,638.24 ₹16,638.24 | 17,137.39 ₹17,137.39 |
| 3.00 | Transportation of Pump, Motor, Bed plate from 20D/4L to 4D/16L (840mtrs) In 3 Shift & Including cleaning work of transport route wherever is required. | 1 | ls | 43,066 ₹43,066 | 43,927.32 ₹43,927.32 | 45,245.14 ₹45,245.14 |
| 4.00 | Transportation of switches, starter and cable of 70 sqmm, 200 mtr from surface to pump location and setting of starter & cable (Through different Haulage & manually) in 3 shift. | 1 | ls | 44,550 ₹44,550 | 45,441 ₹45,441 | 46,804.23 ₹46,804.23 |
| 5.00 | Transportation of 45 no. Pipe from surface to 20D/4L of 6" dia for the purpose of Installation & laying & matching with existing another pipe line of OD/6L pump (The job of lowering, carring, & Transportation from surface to 20D/4L in 8 shift of 8 nos pipe is required 30 manpower, therefore 40 nos of pipe total manpower is 150 nos) | 1 | ls | 1,59,000 ₹1,59,000 | 1,62,180 ₹1,62,180 | 1,67,045.4 ₹1,67,045.4 |
| 6.00 | Placing of pump, motor, bedplate & starter | 1 | ls | 16,500 ₹16,500 | 16,830 ₹16,830 | 17,334.9 ₹17,334.9 |
| 7.00 | Making joint packing & other necessary works | 1 | ls | 13,433.91 ₹13,433.91 | 13,702.59 ₹13,702.59 | 14,113.67 ₹14,113.67 |
| 8.00 | Laying & matching of 45 nos, of pipe in 3 shift | 1 | ls | 28,450 ₹28,450 | 29,019 ₹29,019 | 29,889.57 ₹29,889.57 |
| 9.00 | Priming, setting of pump for the commissining | 1 | ls | 10,138.64 ₹10,138.64 | 10,341.41 ₹10,341.41 | 10,651.65 ₹10,651.65 |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 59,661.1 ₹59,661.1 | 60,854.32 ₹60,854.32 | 62,679.95 ₹62,679.95 |
Updated dates
Tender Value
₹3.9 L
EMD Value
₹4,900
Closing Date
26 Dec 2025, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and Commissioning of 150 HP pump at 4D/16L in RVIIIB for domestic water supply at NKJ unit, Khandra Colliery
2025_ECL_349113_1
ECL/GM/BA/E TENDER/25-26/ENM/224 Dt 10.12.2025
Open Tender
Electrical and Maintenance Works
30 days
Khandra Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,900
23 Feb 2026
10 Dec 2025
27 Dec 2025
10 Dec 2025
26 Dec 2025
10 Dec 2025
10 Dec 2025 - 15 Dec 2025
Amount
Discription of items
Lowering of Pump, Motor, Bed plate through cage & Transport from OL/OD Haulage & 4L/20D junction branch line
Transportation of Pump, Motor, Bed plate from 20D/4L to 4D/16L (840mtrs) In 3 Shift & Including cleaning work of transport route wherever is required.
Transportation of switches, starter and cable of 70 sqmm, 200 mtr from surface to pump location and setting of starter & cable (Through different Haulage & manually) in 3 shift.
Transportation of 45 no. Pipe from surface to 20D/4L of 6" dia for the purpose of Installation & laying & matching with existing another pipe line of OD/6L pump (The job of lowering, carring, & Transportation from surface to 20D/4L in 8 shift of 8 nos pipe is required 30 manpower, therefore 40 nos of pipe total manpower is 150 nos)
Placing of pump, motor, bedplate & starter
Making joint packing & other necessary works
Laying & matching of 45 nos, of pipe in 3 shift
Priming, setting of pump for the commissining
Total impact of GST for the purpose of CTC
HAREKRISHNA ENTERPRISE (BID ID -1205827)
AZAM ENTERPRISE (BID ID -1205829)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.26 MB
BOQ_361839.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid