Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.8 LAdmitted-Finance | -35.11% | ₹27.8 L | L1 | Admitted-Finance |
| 2 | L2₹28.4 L+₹64,693.06 (2.33%)Admitted-Finance | -33.60% | ₹28.4 L+₹64,693.06 (2.33%) | L2 | Admitted-Finance |
| 3 | L3₹28.7 L+₹85,686.17 (3.08%)Admitted-Finance | -33.11% | ₹28.7 L+₹85,686.17 (3.08%) | L3 | Admitted-Finance |
| 4 | L4₹28.8 L+₹1.0 L (3.61%)Admitted-Finance | -32.77% | ₹28.8 L+₹1.0 L (3.61%) | L4 | Admitted-Finance |
| 5 | L5₹29.0 L+₹1.2 L (4.18%)Admitted-Finance | -32.40% | ₹29.0 L+₹1.2 L (4.18%) | L5 | Admitted-Finance |
Tender Value
₹42.8 L
EMD Value
₹85,680
Closing Date
24 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Higher Secondary School Shadipora (Construction of Library Room and Computer Room at Higher Secondary School Shadipora.
2026_PWDJK_312639_1
NIT NO 19 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
90 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division
₹85,680
30 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation over areas (Exceeding 30cm in depth 1.5m in width) including disposal of excavated earth to be leveled and neatly dressed up to a lead of 50m in all kinds of soil Including dewatering complete job. | 37.49 | Cum | 256.85 | ₹9,629.31 |
| 2 | Providing and laying of soling stone size over 150mm on level (hand packed) watering ramming complete under raft and flooring.. | 16.66 | Cum | 1,000 | ₹16,660 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level. M-7.5 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size crushed in foundation and under flooring. | 10.78 | Cum | 5,202.9 | ₹56,087.26 |
| 4 | Providing and laying in position specified grade of Reinforced cement concrete M20 (1 : 1.5 : 3) excluding the cost of centering, shuttering, finishing and reinforcement.All works upto plinth level including carriage complete. | 13.06 | Cum | 7,275.25 | ₹95,014.77 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all works upto plinth level: M-15 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size crushed ) | 33.38 | Cum | 6,591.25 | ₹2,20,015.93 |
| 6 | Providing and laying in position specified grade of Reinforced cement concrete M20 (1:1.5:3) excluding the cost of centering, shuttering, finishing and reinforcement.All works above plinth including carriage complete. | 51.01 | Cum | 9,106.5 | ₹4,64,522.57 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work (Kitply shuttering) for:-
Foundation ,footings,bases of columns | 137.17 | SM | 286.35 | ₹39,278.63 |
| 8 | suspended floors [slab] | 206.82 | SM | 705 | ₹1,45,808.1 |
| 9 | Beams,lintels | 111.69 | SM | 577.55 | ₹64,506.56 |
| 10 | Reinforcement for R.C.C work including straighening, cutting, bending, placing in position and bending all complete. (TMT bars). | 6,275.97 | KG | 123.2 | ₹7,73,199.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1011926.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .