| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Verified |
| 2 | L2₹4.1 L+₹6,346.25 (1.56%)Rejected-Finance | ₹4.1 L+₹6,346.25 (1.56%) | L2 | Rejected-Finance verified |
| Sl No | Description | Qty | Unit | M/S. KALIYAMOORTHY L1 | VENKATESAN S L2 |
|---|---|---|---|---|---|
| 1.00 | Drilling of Pile foundation of size 8" to 12" dia. using hand boresets including insertion of pipes etc., including labour charges etc complete as per standard specification. | 2 | M3 | 438 ₹876 Lowest | 450 ₹900 |
| 2.00 | Earthwork excavation in all soils and subsoils to full depth as may be directed except hardrock requiring blastering inclusive of all shoring, strutting and bailing out water wherever necessary and depositing the surplus earth with initial lead and lift etc complete as per standard specifications. | 6 | M3 | 220 ₹1,320 Lowest | 250 ₹1,500 |
| 3.00 | Supplying and filling clear river Sand, Watering Ramming including Cost and Conveyance of all materials and Labour etc complete as per standard specifications. | 7 | M3 | 2,418 ₹16,926 Lowest | 2,500 ₹17,500 |
| 4.00 | Cement Concrete 1:4:8 mix (One cement Four sand and Eight metal) using 40mm ISS HBG metal including cost and conveyance of all materials and labour etc complete as per standard specifications. | 7 | M3 | 6,288 ₹44,016 Lowest | 6,300 ₹44,100 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5.5 | M3 | 7,730 ₹42,515 Lowest | 7,750 ₹42,625 |
| 6.00 | Providing and errecting centering for sides and soffits of reinforced cement concrete slabs or plane surfaces including strutting upto 1m height using MS Sheets of size 0.9Mx0.6M of 10 kg. stiffened with MS angle of size25mmx25mmx3mm laid over silver oak joists of size 100mmx65mm at 90cm c/c and supported by props 90mm to 130mm dia spaced at 75cm c/c including cost and conveyance of all materials and labour etc., complete as per standard specifications For Lintel, Sunshade&Roof slab. | 104.5 | M2 | 330 ₹34,485 Lowest | 350 ₹36,575 |
| 7.00 | Reinforced Cement Concrete 1:1½:3 mix (One cement one and of sand and three metal) using 20mm ISS HBG metal including cost and conveyance of all materials and labour etc complete as per standard specifications. | 16.5 | M3 | 8,043 ₹1,32,709.5 Lowest | 8,050 ₹1,32,825 |
| 8.00 | Supplying fabricating and placing in position of MS/RTS rods including cutting, bending into shape, tying and placing the grill in position including cost of binding wire including cost and conveyance of all materials and labour etc., complete as per standard specifications | 1,155 | Kg | 92.75 ₹1,07,126.25 Lowest | 95 ₹1,09,725 |
| 9.00 | Plastering in Cement Mortor 1:5 (One cement Five sand) 12mm thick including cost and conveyance of all materials and labour etc., complete as per standard specifications. | 95 | M2 | 294 ₹27,930 Lowest | 300 ₹28,500 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
17 Feb 2026, 3:00 pmClosed
Koothanallur Municipality
The Commissioner Koothanallur Municipality
Construction of Bhathing Ghat at Mariyam Nagar
2026_MAWS_654278_1
029/2026/E1
Open Tender
Civil Works
Works
90 days
Koothanallur Municipality
Construction of Bhathing Ghat at Mariyam Nagar
2 documents required · 2 mandatory
₹0
₹5,000
Yes
Koothanallur Municipality
9 Apr 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
10 Feb 2026 - 17 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drilling of Pile foundation of size 8" to 12" dia. using hand boresets including insertion of pipes etc., including labour charges etc complete as per standard specification. | 2 | M3 | - | - |
| 2 | Earthwork excavation in all soils and subsoils to full depth as may be directed except hardrock requiring blastering inclusive of all shoring, strutting and bailing out water wherever necessary and depositing the surplus earth with initial lead and lift etc complete as per standard specifications. | 6 | M3 | - | - |
| 3 | Supplying and filling clear river Sand, Watering Ramming including Cost and Conveyance of all materials and Labour etc complete as per standard specifications. | 7 | M3 | - | - |
| 4 | Cement Concrete 1:4:8 mix (One cement Four sand and Eight metal) using 40mm ISS HBG metal including cost and conveyance of all materials and labour etc complete as per standard specifications. | 7 | M3 | - | - |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5.5 | M3 | - | - |
| 6 | Providing and errecting centering for sides and soffits of reinforced cement concrete slabs or plane surfaces including strutting upto 1m height using MS Sheets of size 0.9Mx0.6M of 10 kg. stiffened with MS angle of size25mmx25mmx3mm laid over silver oak joists of size 100mmx65mm at 90cm c/c and supported by props 90mm to 130mm dia spaced at 75cm c/c including cost and conveyance of all materials and labour etc., complete as per standard specifications For Lintel, Sunshade&Roof slab. | 104.5 | M2 | - | - |
| 7 | Reinforced Cement Concrete 1:1½:3 mix (One cement one and of sand and three metal) using 20mm ISS HBG metal including cost and conveyance of all materials and labour etc complete as per standard specifications. | 16.5 | M3 | - | - |
| 8 | Supplying fabricating and placing in position of MS/RTS rods including cutting, bending into shape, tying and placing the grill in position including cost of binding wire including cost and conveyance of all materials and labour etc., complete as per standard specifications | 1,155 | Kg | - | - |
| 9 | Plastering in Cement Mortor 1:5 (One cement Five sand) 12mm thick including cost and conveyance of all materials and labour etc., complete as per standard specifications. | 95 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_784546.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_784546.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .