Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -24.67% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.7 LAdmitted-Finance | -11.00% | ₹6.7 L | L2 | Admitted-Finance |
Tender Value
₹7.6 L
EMD Value
₹75,629
Closing Date
28 Mar 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Lohamandi Zone, Room No. 40, Azampada Construction of a CC (Concrete) floor for the lane and construction of drainage channels, extending from the residence of Shri Rambabu Harit up to the railway line.
2026_DOLBU_1128723_1
20-03-2026/NAGAR NIGAM AGRA/27-03-2026/11
Open Tender
Construction Works
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹75,629
28 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of stone flagged or interlocking tiled floor including stacking of material as directed by E/IC within distance of 60 meters. (SI No. 697) | |||||
| 2Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance | |||||
| 3Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) | |||||
| 4Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1) | |||||
| 512mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) | |||||
| 6Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3) | |||||
| 7R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3) | |||||
| 8Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | |||||
| 9Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) | |||||
| 10Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_2105670.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid