Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.4 L+₹4,532.99 (3.30%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹4,260
Closing Date
1 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O WASHROOM NEAR MASJID SHREEF RANI ASRAR COLONY BLOCK ACHABAL
2026_RDPR_317810_10
ENIT77of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,260
4 Aug 2026
25 Jul 2026
3 Aug 2026
25 Jul 2026
1 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundation (Not exceeding 1.5m in width), depth upto 1.5m incl. disposal of excavated earth upto 1m from cutting edge. (All Kinds of Soil) | 1 | Cum | - | - |
| - | Providing & laying of dry solling hand packing, in foundation & Trecnhes incl all carraiges | - | Cum | - | - |
| - | P/L in position cement conc. of grade 1:3:6 (1 cement : 3 fine sand : 6 stone agg 40 mm N/s) excl. cost of centering & shuttering in all work upto plinth level. | - | Cum | - | - |
| - | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | - | Cum | - | - |
| - | Centering and Shuttering I/c Strutting, Propping etc for suspended floors and removal of form work | - | Sqm | - | - |
| - | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for walls of any thickness plinth | - | Sqm | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 1 | - |
| - | Reinforcment for R.C.C. work incl. straightening, cutting, bending, placing in position & binding all complete. | - | Qtl | - | - |
| - | P/F of mild steel door/window frames and shutters complete job | 1 | kg | 1 | ₹1 |
| - | 12 mm Cement plaster on the rough side of single or half brick wall of mix: 1:4 mix | - | Sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1043665.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .