Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.1 LAccepted-AOC RAR 107A GROUND FLOOR RAJENDRA ARIHANT TOWER B1 COMMUNITY CENTRE JANAKPURI NEW DELHI 110058 | WEST | DELHI | 110058 | ₹53.1 L | L1 | Accepted-AOC Work awarded to L1 bidder vide WO No. AAI/BG/Engg(E)/KIA/Capital/Gas Suppression/2025-26/231 dated 24.10.2025 |
| 2 | L2₹59.9 LRejected-Finance Y 51 GROUND FLOOR OKHLA INDUSTRIAL AREA PHASE II DELHI 110020 | SOUTH EAST | DELHI | 110020 | ₹59.9 L | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹64.0 LRejected-Finance | ₹64.0 L | L3 | Rejected-Finance Not L1 bidder |
| 4 | L4₹69.5 LRejected-Finance 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 UDYAM GJ 01 0027029 24AGPPP8172K1ZP R M MII STATUS AS VERIFIED | AHMADABAD | GUJARAT | 380015 | ₹69.5 L | L4 | Rejected-Finance Not L1 bidder |
| 5 | L5₹79.8 LRejected-Finance 302 BUSINESS SUITES 9 S V ROAD SANTACRUZ WEST MUMBAI MAHARASHTRA 400054 UDYAM MH 18 0033404 27AAOCS0204M1Z7 B M R MII STATUS AS VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400054 | ₹79.8 L | L5 | Rejected-Finance Not L1 bidder |
| Sl No | Description | Qty | Unit | Nexus Fire And Security Systems L1 | advent electric technologies pvt. ltd. L2 | CENTRE TAP ENGINEERING L4 | Kalpataru Industries L3 | Swastik Synergy Engineering Pvt. Ltd L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Design, Supply, Installation, Testing and Commissioning of Gas based Fire Suppression System for the following locations consisting of PESO Approved Cylinder and valve assembly, extinguishing agent, arrangement for supervisory switch connection for monitoring cylinder pressure, pressure guage with a safety burst disc, electronic control head / Solenoid with provision for manual operation, flexible hose, cylinder strap, NRV (if applicable), Pressure Switch and safety cap, required nos. of Discharge Nozzles, Piping, Manifold, Fire Alarm cum Gas Release Panel with required nos of smoke detectors, Strobe cum hooters, RI etc, Autodialler (Landline compatable), Manual gas release and abort station (Pull type) with weather proof enclosure, FRLS armoured copper cabling and all required modules/accessories etc. complete as required as per technical specifications. Note : (1) The system shall have PESO / BIS / UL / VDS certified technology that allows for a higher capacity to overcome frictional losses and allow for higher distances of the agent flow; and also allow for better agent penetration in enclosed electronic equipment such as Server Racks etc. (2) Extinguishing Agent : CLEAN AGENT (FK-5-1-12) shall be Colourless and odour less gas gaving Zero Ozone Depletion Potential (ODP). The Quantity of Clean agent shall be determined based on the given room volume and as per relevant certification. Fill Density certificate shall be submitted from PESO approved filling station. (3) Complete system design i/c preparation of shop drawings, submission of technical details of all components, selection of Cylinder capacity, Gas Volume, discharge valves, Nos. of Nozzles, piping design and pressure calculations using certified design software. The final design shall be duly vetted by the manufacturer (OEM) and submitted to the Engineer-in-Charge for approval before the commencement of work. | ||||||||
| 1.01 | Localizer Hut-27L (South Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LxWxH) : 5.50m X 3.50m X 3.30m (Avg. H) = 63.53 m3 &
Room No. 2 :- Battery Room (LxWxH) : 4.00m X 2.00m X 3.30m (Avg. H) = 26.40 m3
(2) Independent fire suppression system shall be provided for each rooms.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 4,25,834 ₹4.3 L | 4,46,480 ₹4.5 L | 6,00,000 ₹6 L | 4,87,790 ₹4.9 L | 6,32,056 ₹6.3 L |
| 1.02 | Localizer Hut-09R (South Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LxWxH) : 5.50m X 3.50m X 3.30m (Avg. H) = 63.53 m3 &
Room No. 2 :- Battery Room (LxWxH) : 4.00m X 2.00m X 3.30m (Avg. H) = 26.40 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 4,25,834 ₹4.3 L | 4,46,480 ₹4.5 L | 6,00,000 ₹6 L | 4,87,790 ₹4.9 L | 6,32,056 ₹6.3 L |
| 1.03 | Glide Path Hut-27L (South Runway)
Note:-
(1) Room No. 1 :- Equipment Room (LXWXH) : 4.00m X 3.50m X 3.30m (Avg. H) = 46.20 m3 &
Room No. 2 :- Battery Room (LXWXH) : 2.72m X 3.50m X 3.30m (Avg. H) = 31.42 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 3,85,300 ₹3.9 L | 4,07,890 ₹4.1 L | 6,00,000 ₹6 L | 4,63,275 ₹4.6 L | 6,05,570 ₹6.1 L |
| 1.04 | Glide Path Hut-09R (South Runway)
Note:-
(1) Room No. 1 :- Equipment Room (LXWXH) : 4.00m X 3.50m X 3.30m (Avg. H) = 46.20 m3 &
Room No. 2 :- Battery Room (LXWXH) : 2.72m X 3.50m X 3.30m (Avg. H) = 31.42 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 3,85,300 ₹3.9 L | 4,07,890 ₹4.1 L | 5,00,000 ₹5 L | 4,63,275 ₹4.6 L | 6,03,520 ₹6.0 L |
| 1.05 | Localizer Hut-27R (North Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 &
Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 4,93,068 ₹4.9 L | 5,60,270 ₹5.6 L | 5,00,000 ₹5 L | 5,39,555 ₹5.4 L | 6,89,866 ₹6.9 L |
| 1.06 | Localizer Hut-09L (North Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 &
Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 4,93,068 ₹4.9 L | 5,60,270 ₹5.6 L | 5,00,000 ₹5 L | 5,39,555 ₹5.4 L | 6,89,866 ₹6.9 L |
| 1.07 | Glidepath Hut-27R (North Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 &
Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 4,93,068 ₹4.9 L | 5,55,470 ₹5.6 L | 5,00,000 ₹5 L | 5,39,555 ₹5.4 L | 6,89,866 ₹6.9 L |
| 1.08 | Glidepath Hut-09L (North Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 &
Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10% | 1 | SET | 4,93,068 ₹4.9 L | 5,55,470 ₹5.6 L | 5,00,000 ₹5 L | 5,39,555 ₹5.4 L | 6,89,866 ₹6.9 L |
| 1.09 | DVOR Building (North Runway)
Note :-
(1) Room No. 1 :- Equipment Room (LXWXH*) : 5.00m X 4.00m X 3.40m = 68.00 m3 &
Room No. 2 :- Battery Room (LXWXH*) : 2.25m X 3.00m X 3.40m = 22.95 m3
(2) Independent fire suppression system shall be provided for each room.
(3) Room volume subject to tolerance of ±10%
(4) *The given room height includes a 0.30 m high false ceiling void, which shall also be covered under fire protection. | 1 | SET | 4,24,134 ₹4.2 L | 4,96,600 ₹5.0 L | 5,00,000 ₹5 L | 5,08,905 ₹5.1 L | 6,42,388 ₹6.4 L |
Tender Value
₹86.0 L
EMD Value
₹2.6 L
Closing Date
20 Aug 2025, 11:00 amClosed
AGM (E-E)
O/o AGM (E-E), AAI, ATS Complex, Alpha-1, KIA, Bangalore - 560 300
Design, Supply, Installation, Testing and Commissioning of Gas based Fire Suppression System for NAV- AIDS and other Installations at KIA, Bengaluru.
2025_AAI_242346_1
AAI/BG/ENGG(E)/KIA/CAPITAL/FSS
Open Tender
Electrical Works
180 days
ATS Complex, KIA, Bangalore
As per NIT
11 documents required · 11 mandatory
₹1,120
₹2.6 L
Bangalore
26 Dec 2025
28 Jul 2025
21 Aug 2025
28 Jul 2025
20 Aug 2025
28 Jul 2025
28 Jul 2025 - 6 Aug 2025
4 Aug 2025
Amount
Localizer Hut-27L (South Runway) Note :- (1) Room No. 1 :- Equipment Room (LxWxH) : 5.50m X 3.50m X 3.30m (Avg. H) = 63.53 m3 & Room No. 2 :- Battery Room (LxWxH) : 4.00m X 2.00m X 3.30m (Avg. H) = 26.40 m3 (2) Independent fire suppression system shall be provided for each rooms. (3) Room volume subject to tolerance of ±10%
Localizer Hut-09R (South Runway) Note :- (1) Room No. 1 :- Equipment Room (LxWxH) : 5.50m X 3.50m X 3.30m (Avg. H) = 63.53 m3 & Room No. 2 :- Battery Room (LxWxH) : 4.00m X 2.00m X 3.30m (Avg. H) = 26.40 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
Glide Path Hut-27L (South Runway) Note:- (1) Room No. 1 :- Equipment Room (LXWXH) : 4.00m X 3.50m X 3.30m (Avg. H) = 46.20 m3 & Room No. 2 :- Battery Room (LXWXH) : 2.72m X 3.50m X 3.30m (Avg. H) = 31.42 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
Glide Path Hut-09R (South Runway) Note:- (1) Room No. 1 :- Equipment Room (LXWXH) : 4.00m X 3.50m X 3.30m (Avg. H) = 46.20 m3 & Room No. 2 :- Battery Room (LXWXH) : 2.72m X 3.50m X 3.30m (Avg. H) = 31.42 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
Localizer Hut-27R (North Runway) Note :- (1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 & Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
Localizer Hut-09L (North Runway) Note :- (1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 & Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
Glidepath Hut-27R (North Runway) Note :- (1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 & Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
Glidepath Hut-09L (North Runway) Note :- (1) Room No. 1 :- Equipment Room (LXWXH) : 5.00m X 4.04m X 3.25m (Avg. H) = 65.65 m3 & Room No. 2 :- Battery Room (LXWXH) : 5m X 3.76m X 3.25m (Avg. H) = 61.1 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10%
DVOR Building (North Runway) Note :- (1) Room No. 1 :- Equipment Room (LXWXH*) : 5.00m X 4.00m X 3.40m = 68.00 m3 & Room No. 2 :- Battery Room (LXWXH*) : 2.25m X 3.00m X 3.40m = 22.95 m3 (2) Independent fire suppression system shall be provided for each room. (3) Room volume subject to tolerance of ±10% (4) *The given room height includes a 0.30 m high false ceiling void, which shall also be covered under fire protection.
Fall back Server Room (Alpha-1 Building) Note :- (1) Room Dimensions (LXWXH)* :- 8.10m X 7.70m X 4.20m = 244.48 m3** (** After excluding Entrance lobby area of 2.60m (L) x 1.60m (W) x 4.20m (H) = 17.47 m3 from protection zone). (2) Room volume subject to tolerance of ±10% (3) * The given room height includes a 1.35 m high false ceiling void and 0.35m false floor void, which shall also be covered under fire protection.
Fall Back UPS and Battery Room (Alpha-1 Building) Note :- (1) Room Dimensions (LXWXH)* :- 7.70 m X 7.60 m X 4.20 m* = 221.97** (* After excluding Entrance lobby area of 1.80m (L) x 3.15 m (W) x 4.20 m (H) = 23.81 m3 from protection zone). (2) Room volume subject to tolerance of ±10% (3) * The given room height includes a 1.40 m high false ceiling void, which shall also be covered under fire protection.
Main LT panel at Alpha-2 switch room Note :- (a) Panel Dimension : LxWxH = 6.4m x 0.6m x 2.4m (b) Total no. of Enclosures = 08 Nos (c) Volume of largest cubicle= 0.80mx0.60mx2.40m= 1.15 m3 (d) Cubicle volume subject to tolerance of ±10%
UPS Panel Incomer Sub LT Panel at Alpha-2 switch room Note :- [a) Panel Dimension : LxWxH = 1.05 m x 0.3m x 1m (b) Total no. of Enclosures = 04 Nos (c) Volume of largest cubicle= 0.45mx0.30mx0.7m= 0.0945 m3 (d) Cubicle volume subject to tolerance of ±10%
LT Panel and DB at NAV-AIDS sites at Localizer (South Runway) Note :- (a) Panel Dimension (LxWxH) = 1.7 m x 0.4 m x 1.6 m (b) Total no of Enclosures = 03 Nos (including adjacent DB) (c) Volume of largest cubicle= 0.8 mx0.40mx 1.60 m= 0.51 m3 (d) Cubicle volume subject to tolerance of ±10%
Supply and fixing of following capacity of Modular type Automatic Fire extinguisher, filled with clean agent (FK5.1.12) with all accessories, valve assembly with sprinkler bulb etc i/c fixing on ceiling complete as per technical specification and as per the direction of Engineer-in-charge.
5 kg Capacity
advent electric technologies pvt. ltd. (BID ID -879241)
Kalpataru Industries (BID ID -878856)
CENTRE TAP ENGINEERING (BID ID -888959)
Swastik Synergy Engineering Pvt. Ltd (BID ID -888383)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid