| 1 | L1₹3.8 LAccepted-AOC 01 VILL NAWANAGAR PO NIGAHI DIST SINGRAULI M P 486887 | SINGRAULI | MADHYA PRADESH | 486887 | ₹3.8 L Quoted ₹3.3 L | L1 | Accepted-AOC As per TC recommendation and approval of competent authority. |
| 2 | L2₹3.5 L+₹29,000 (8.92%)Rejected-Finance MILAN COMPLEX SHANKER MARKET JAYANT PO SINGRAULI DISTT SINGRAULI MP 486 890 | SINGRAULI | MADHYA PRADESH | 486890 | ₹3.5 L+₹29,000 (8.92%) | L2 | Rejected-Finance As per TC recommendation and system generated BOQ. |
| 3 | L3₹4.2 L+₹91,000 (28.0%)Rejected-Finance | ₹4.2 L+₹91,000 (28.0%) | L3 | Rejected-Finance As per TC recommendation and system generated BOQ. |
| Sl No | Description | Qty | Unit | J.V.Engineering L2 | M/S ANIL ENTERPRISES L1 | M/S GENERAL ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Removal of the worn-out SS/MS plate liners of the Pre-Weigh Hopper of RLS Line no. 2 & 3 will be carried out by cutting and/or gouging, followed by surface preparation of the pre weigh hopper and swing chute to facilitate the fixing of a new liner. The process will include thorough cleaning and smoothing of the surface/ mother plate to ensure proper adherence and alignment of the replacement liner. (Cutting rods and industrial Oxygen/DA required for the work will be provided by NCL). | 1 | Job | 1,05,000 ₹1,05,000 | 1,00,000 ₹1,00,000 Lowest | 1,23,000 ₹1,23,000 |
| 2.00 | Fabrication of the MS/SS liners for the flow control gate chute, pre-weigh hopper and swing chute assembly of RLS line no. 2 & 3 will be done as per the specified dimensions, ensuring accurate fitting and alignment. The liner will be made from 10/12 mm thick MS/SS plates, and all necessary cutting and shaping will be carried out to meet the operational requirements. (Cutting rods and industrial Oxygen/DA required for the fabrication work will be provided by NCL). | 1 | Job | 1,19,000 ₹1,19,000 | 1,00,000 ₹1,00,000 Lowest | 1,25,000 ₹1,25,000 |
| 3.00 | Fixing and jointing of the fabricated MS/SS liners over the mother plate (base plate) in the Pre-Weigh Hopper, flow control gate chute and swing chute assembly of RLS line no. 2 & 3 will be carried out by plug welding, ensuring proper alignment and secure bonding. Welding will be done using electrodes suitable for joining dissimilar metal properties to ensure structural integrity and durability. (Welding rods required for the work will be provided by NCL). | 1 | Job | 1,30,000 ₹1,30,000 | 1,25,000 ₹1,25,000 Lowest | 1,68,000 ₹1,68,000 |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - | - | - |
Tender Value
₹5.0 L
EMD Value
₹6,300
Closing Date
11 Nov 2025, 11:30 amClosed
Staff Officer(EnM), Amlohri Area
Office of Area General Manager, Amlohri Area, NCL, Singrauli - 486887
Replacement of SS/MS liners of Pre-weigh Hopper, Flow Control Gate Chute and Swing Chutes of RLS Line No. 2 and 3 of CHP Phase-II at Amlohri Project
2025_NCL_346443_1
AML/SO/ENM/ETN/25/647
Open Tender
Miscellaneous Works
Item Rate
90 days
Amlohri Project, NCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,300
26 Jun 2026
30 Oct 2025
12 Nov 2025
30 Oct 2025
11 Nov 2025
31 Oct 2025
30 Oct 2025 - 6 Nov 2025
Amount
Removal of the worn-out SS/MS plate liners of the Pre-Weigh Hopper of RLS Line no. 2 & 3 will be carried out by cutting and/or gouging, followed by surface preparation of the pre weigh hopper and swing chute to facilitate the fixing of a new liner. The process will include thorough cleaning and smoothing of the surface/ mother plate to ensure proper adherence and alignment of the replacement liner. (Cutting rods and industrial Oxygen/DA required for the work will be provided by NCL).
Fabrication of the MS/SS liners for the flow control gate chute, pre-weigh hopper and swing chute assembly of RLS line no. 2 & 3 will be done as per the specified dimensions, ensuring accurate fitting and alignment. The liner will be made from 10/12 mm thick MS/SS plates, and all necessary cutting and shaping will be carried out to meet the operational requirements. (Cutting rods and industrial Oxygen/DA required for the fabrication work will be provided by NCL).
Fixing and jointing of the fabricated MS/SS liners over the mother plate (base plate) in the Pre-Weigh Hopper, flow control gate chute and swing chute assembly of RLS line no. 2 & 3 will be carried out by plug welding, ensuring proper alignment and secure bonding. Welding will be done using electrodes suitable for joining dissimilar metal properties to ensure structural integrity and durability. (Welding rods required for the work will be provided by NCL).
Total impact of GST for the purpose of CTC
J.V.Engineering (BID ID -1196233)
M/S GENERAL ENGINEERING WORKS (BID ID -1195503)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_359128.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .