Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-Finance | ₹15.2 L | L1 | Accepted-Finance low |
| 2 | L2₹15.2 LRejected-Finance | ₹15.2 L | L2 | Rejected-Finance high |
| Sl No | Description | Qty | Unit | V.ANBURAJA | K.V.MANOHARAN |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., I st DEPTH | 30.96 | 1 m3 (one cubic meter) | 8,080.56 ₹8,080.56 | 8,157.96 ₹8,157.96 |
| 2.00 | Supplying filling with filling stone dust in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete | 1.44 | 1 m3 (one cubic meter) | 525.6 ₹525.60 | 527.9 ₹527.90 |
| 3.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 9.67 | 1 m3 (one cubic meter) | 54,355.07 ₹54,355.07 | 54,366.67 ₹54,366.67 |
| 4.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 28.03 | 1 m3 (one cubic meter) | 2,05,291.72 ₹2.1 L | 2,05,297.33 ₹2.1 L |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 19.79 | 1 m3 (one cubic meter) | 1,63,069.6 ₹1.6 L | 1,63,073.56 ₹1.6 L |
| 6.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,900 | 1kg(one kilogram) | 1,75,560 ₹1.8 L | 1,76,510 ₹1.8 L |
| 7.00Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | |||||
| 7.01 | Garde beam | 1 | 1 m2 (one square meter) | 575 ₹575 | 575 ₹575 |
| 7.02 | Plain surface | 248.2 | 1 m2 (one square meter) | 2,52,419.4 ₹2.5 L | 2,52,419.4 ₹2.5 L |
| 8.00 | Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc | 3.43 | 1 m3 (one cubic meter) | 14,697.55 ₹14,697.55 | 14,697.55 ₹14,697.55 |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
27 Nov 2025, 3:00 pmClosed
Executive Officer
Uthiramerur Town Panchayat
Construction of Anganwadi building at A.P Chatiram Colony in Uthiramerur Town Panchayat
2025_DTP_626661_1
867-1
Open Tender
Civil Works - Buildings
Uthiramerur Town Panchayat
Please reffer Tender documents
2 documents required · 2 mandatory
₹0
₹17,000
23 Jan 2026
26 Nov 2025
27 Nov 2025
26 Nov 2025
27 Nov 2025
26 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.88 MB
BOQ
BOQ • 0.34 MB
Download all tender documents and submit your bid