Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹15,133.56 (12.2%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.4 L+₹16,725.60 (13.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.4 L+₹17,695.47 (14.3%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹1.5 L+₹23,057.17 (18.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹3,660
Closing Date
7 Oct 2026, 5:00 pmClosed
Executive Engineer RNB Division Chadoora
CHADOORA
Upgradation of HDO Office B.K Pora Budgam (Balance work).
2026_PWDJK_326592_1
NIT NO 77
Open Tender
Civil Works
Percentage
12 days
CHADOORA
AS PER NIT
4 documents required · 4 mandatory
₹200
Yes
Executive Engineer RNB Division Chadoora
₹3,660
Yes
14 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : 1 meter from cutting edge | 0.86 | Cum | 479.3 | ₹412.2 |
| 2 | Providing and laying of stone soling in trenches hand packed including all leads, lifts, loading, unloading, dressing, head load, ramming with iron rammer all carriage of materials involved from approved nearest sources to site of work(all complete). | 0.14 | Cum | 1,000 | ₹140 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size | 0.14 | cum | 5,202.9 | ₹728.41 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl. Shuttering all complete job | 1.15 | cum | 8,000 | ₹9,200 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. | 57.6 | Kg | 123.2 | ₹7,096.32 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.welded | 693.5 | Kg | 138.2 | ₹95,841.7 |
| 7 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 129.2 | Sqm | 98.75 | ₹12,758.5 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work | 54.54 | Sqm | 131.85 | ₹7,191.1 |
| 9 | Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes testing of joints complete as per direction of Engineer-in charge. Internal work-exposed on wall with clamps at 1.00 meter spacingPN-16 pipe , 25mm OD(SDR-7.4) | 30 | RM | 298.1 | ₹8,943 |
| 10 | Providing and fixing PPR Unions PPR Union 25mm | 2 | No | 353.25 | ₹706.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1104764.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .