Loading…
Loading…
Tender Value
₹96.7 L
EMD Value
₹1.9 L
Closing Date
29 Jun 2026, 2:00 pmClosed
Yes (up to 3 members)
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WORKS
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of 'V/N' or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'Total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB of IRGCC 2022, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. NOTE: FOR DETAILS PLEASE REFER TENDER DOCUMENT.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for (b) (i): Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria. (b) (ii) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 (a) (ii) of Part-II of GCC or through subcontractor fulfilling the requirements as per clause 7 of Part-II of GCC or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of Part-II of GCC, with prior approval of Chief Engineer in writing. NOTE: FOR DETAILS PLEASE REFER TENDER DOCUMENT.
Defination of Similar Work :- Fabrication, Supply and erection of tower of 20m or above height in Main line Railways, Metro Railways, DFCCIL, High Speed Railways, LRT, Metro Rail, Suburban Transit system, Power Transmission/ Distribution or Cellular Networks or construction and launching of steel girders bridge work.
7 conditions · 1 needing a document upload
Certification for Kavach associated work shall be carried out only by the Original Equipment Manufacturer as mentioned in Annexure-Q. Note: For details please refer tender document.
Please refer tender document for details
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Design, Dismantling, Transportation, Erection and Commissioning of Communication Tower including Associated Kavach, OFC, Telecom and Testing Works in Chandanpur to Khana Section of Howrah Division in connection with infringement removal for multitracking work.
SGW-272-252-T1-65
SGW-272-252-T1-65
Open
Works - General
12 Months
Kolkata, West Bengal
₹0
₹1.9 L
29 Jun 2026
2 Jun 2026
15 Jun 2026
19 items across 3 schedules · ₹96,68,250 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply of optic fiber splice closure (48 fiber) as per technical Specification No. G/OJC-02/01, March'99 with latest amendment or latest including all miscellaneous items and consumables for fiber splicing. Inspection: Consignee. | Numbers | 2.00 | 4,522 | 9,044 |
| 2 | Jointing, terminating & splicing of 48 optical fiber cable and fixing of termination box/FDF/placing of joint closures in the pit required at various locations including transportation of all the jointing & terminating materials from railway store to the work site and returning leftover materials to the railway store. | Numbers | 2.00 | 13,505 | 27,010 |
| 3 | Excavation of the jointing pit and provision of RCC/FRP joint /Loop chambers of 90 cm. Inner dia. 60 cm. depth and 3mm thickness with two pieces of top cover with hooks each and bottom cover with hole for drainage and cable entry as per Drg. No. RAILTEL/SR/OFC/ 2009/12 and as directed by Engineer to be provided at every joint location and at every Kilometer loop etc., The chamber shall be filled with sand mixed with ariti-stermic power, back filling and ramming of trench after HDPE duct laying, splicing and commissioning. | Numbers | 2.00 | 25,480 | 50,960 |
| 4 | Supply of 40 mm. dia. permanently lubricated HDPE telecom: ducts (with chord) as per RDSO Spec. No. RDSO/SPN/TC/45/2013 Rev.2.0 with latest amendments or Latest in length of 1000 mtrs./roll For each km. of HDPE duct following items are to be supplied (a) end plugs-2 nos. (b) cable sealing plugs - 2 nos. (c) plastic couplers slip fit/push fit type-2 nos. (d) end plugs to be provided along with drum 2 nos. Color to be specified by Railways. Inspection: Consignee. | Kilometre | 1.00 | 79,596 | 79,596 |
| 5 | Laying of HDPE/DWC/GI Pipes. | Kilometre | 1.00 | 7,590 | 7,590 |
| 6 | Blowing of armoured optic fiber cable (OFC Cable supplied by Railways) into the HDPE duct by using a blowing machine and associated works. 10% of OFC length to be blown extra on both ends of Duct i.e. total 20% of Duct length. Before blowing the duct integrity shall be tested. The payment shall be made after ensuring duct integrity and corrective action wherever required at his own cost. Payment will be made as per the length of Duct from which OFC is Blown. | Kilometre | 1.00 | 13,950 | 13,950 |
| 7 | Laying of S&T Cables of various cores/pairs/quads in trenches/GI pipes/RCC pipes/DWC pipes/Trunking.Power Cable as required will be supplied by Railways. | Metre | 1000.00 | 7 | 7,000 |
| 8 | Excavation of trench at a of Depth of 1200 mm. and width of 300 mm., including marking of cable alignment, clearing of jungle, roots of trees, bushes, refilling with excavated soil, ramming and consolidation after laying of cables complete to the finished item of work in all type of Soil. NOTE: In case 1.2 m. depth of the trench is not achievable due to site conditions approval of officer in charge is to be obtained and payment shall be made on a prorate basis. | Kilometre | 1.00 | 97,822 | 97,822 |
| 9 | Arranging unskilled labour at S&T Stores for loading/ unloading/stacking of departmental materials. | Man- Days | 6.00 | 587 | 3,522 |
| 10 | Segregation, stacking, loading, unloading and transportation in a 6 MT capacity vehicle from Store to Scrap Depot or Store to Store within a city as per instruction of Engineer In charge. ('Per unit' is to be treated as 'Per Load') | Per Unit | 6.00 | 10,169 | 61,014 |
| 11 | Installation of Relay Rack Assembly including IDF pillars if any complete with wall supports, scaffolding, ladders, runway for cables, fixing of Relay / Relay group base plates, fixing of Tag blocks etc. The work shall be done as per approved plan, extant practice on ER & the instructions of Rly engineer at site. | Numbers | 2.00 | 10,376 | 20,752 |
| 12 | Circuit wiring/jumpering as per circuit diagrams in the relay racks/IDF rack tag blocks. This includes preparation of Jumper sheets by wire-man duly checked by firm's site supervisor & wire to wire testing as per circuit diagram. Any wrong jumper done by a wireman will not be paid & correction shall be done free of cost. Jumper wires will be supplied & issued by Railways. Good quality solder resin core to be supplied by contractor for soldering of Jumper wires. Soldering of jumper wires to be done after completion of testing by Railways. This item is to be used for only Alterations in any EI/PI/RRI. Inspection: Consignee. ('Per unit' is to be treated as 'Per Jumper') | Per Unit | 400.00 | 15 | 6,000 |
| Schedule total | ₹3,84,260 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022.pdf
ATTACHMENT
ACS 2
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
ACS 6
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
ACS 8
ATTACHMENT
ACS 9
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
2025_06_24SeekingclarificationonapplicabilityofGCCCorrectionSlipNo_10.pdf
ATTACHMENT
ACS11_1.pdf
ATTACHMENT
GTEN_TOWERREINSTALLATION_TDFinalon02.06.2026.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
ATTACHMENT
2024_09_25RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .