| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹54.4 LAdmitted-Finance | -0.10% | ₹54.4 L | L1 | Admitted-Finance |
| 2 | L2₹54.4 LAdmitted-Finance | -0.01% | ₹54.4 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹64.3 L
EMD Value
₹1.3 L
Closing Date
25 May 2026, 12:00 pmClosed
SE RED Ayodhya Circle
SE RED AYODHYA CIRCLE, BADA RAMANA, REEDGANJ, AYODHYA
Under District Ambedkarnagar, Construction Of Community Centre (Building) At Darbpur, Lot No 3
2026_REDUP_1147045_3
15/SE RED Ayodhya/Ambedkarnagar/26-27 Dt 02/04/2026
Open Tender
Civil Works
Ambedkarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.3 L
SE RED Ayodhya Circle
16 Jun 2026
9 May 2026
25 May 2026
9 May 2026
25 May 2026
9 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.2.1.1 | 7.78 | Cum | 89.8 | ₹698.64 | |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. for All kinds of soil.As per DSR:Vol.1:2023 item 2.8.1 | 223.28 | Cum | 180.02 | ₹40,194.87 | |
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete,As per DS | 61.67 | Cum | 484.47 | ₹29,877.26 | |
CC in 1:2:4 cement ,c/sand and 20mm stone aggregte DSR 4.1.3 | 1.09 | Cum | 5,448.77 | ₹5,939.16 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR:Vol.1:2023 item 4.1.8 | 69.9 | Cum | 4,711.18 | ₹3,29,311.48 | |
Providing and laying in position, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.As per DSR:Vol.1:2023 item 5.1.2 | 48.77 | Cum | 6,256.04 | ₹3,05,107.07 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : in 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu- ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) as per DSR:(Vol.-1):2023 Item 5.2.2 | 14.08 | Cum | 7,505.9 | ₹1,05,683.07 | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).as per DSR:(Vol.-1):2023 Item 5.3 | 51.64 | Cum | 7,957.2 | ₹4,10,909.81 | |
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete as per DSR:(Vol.-1):2023 Item 5.9.1 | 76.48 | Sqm | 271.21 | ₹20,742.14 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
Tendernotice_2.pdf
PDF • 2.45 MB
BOQ_2145283.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid