Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | ₹3.3 L | L1 | Accepted-Finance Bid Accepted as the quoted rates are on lower sides compare to other bidders. |
| 2 | L2₹3.4 LRejected-Finance BILASPUR | ₹3.4 L | L2 | Rejected-Finance Bid Rejected due to higher side rates. |
| 3 | L3₹3.5 LRejected-Finance N A | NA | NA | 121004 | ₹3.5 L | L3 | Rejected-Finance Bid Rejected due to higher side rates. |
Updated dates
Tender Value
₹3.1 L
EMD Value
₹3,144
Closing Date
25 Apr 2026, 1:50 pmClosed
Sr.Xen
Er.Rahul Puri) Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
HED/03/2026-27
2026_HPSEB_134447_1
NO/HED-03/2026-27
Open Tender
Electrical Works
90 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹3,144
18 May 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Erection Part of 3Ph LT Line 78/2024-25 | - | - | - | - | - |
| 1.02 | Erection of LT line.Digging of pit of stay, Erection of PCC Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. | 7 | No. | - | - | 1111 |
| 1.03 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. | 6 | Set. | - | - | 1112 |
| 1.04 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect. | 7 | Set. | - | - | 1113 |
| 1.05 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect. | 1.43 | P/Kms /P.w | - | - | 1114 |
| 1.06 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. | 0.36 | P/Kms | - | - | 1115 |
| 1.07 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work. | - | Job. | - | - | 1116 |
| 1.08 | Erection Part of 1Ph LT Line 48/2025-26 | - | - | - | - | 1117 |
| 1.09 | Erection of LT line.Digging of pit of stay, Erection of PCC Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. | 9 | No. | - | - | 1118 |
| 1.1 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. | - | Set. | - | - | 1119 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
additionaltermandcondition.pdf
Additional Documents • 0.39 MB
BOQ_198881.xls
BOQ • 1.31 MB
termandcondition.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid