Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance AT NILAKANTHAPUR PO DIST BHADRAK | BHADRAK | BHADRAK | ODISHA | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.5 L
EMD Value
₹8,480
Closing Date
13 Jul 2026, 2:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, DHENKANAL
NH-42 to Meramundali_Road_Paver Block_1.100 to 1.400
2026_CERWI_133996_1
Online TCN-03/26-27
Open Tender
Civil Works - Roads
Percentage
60 days
Dhenkanal
2 documents required · 2 mandatory
₹4,000
₹8,480
Yes
21 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
1 Jul 2026 - 9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 but excluding the charges of GST etc. complete & as per direction of the Engineer-in-Charge. | 306 | sqm | 8.63 | ₹2,640.78 |
| 2 | Earthwork in excavation for foundation of in hard soil including dressing and leveling the bed fit for laying concrete and deposited the excavated materials away from work site etc complete. | 48.96 | cum | 282.88 | ₹13,849.8 |
| 3 | Filling Foundation & Plinth with sand watered and rammed including cost of sand, conveyance of material, labour, T & P etc. complete. | 94.86 | cum | 607.19 | ₹57,598.04 |
| 4 | PCC Grade M15 using 40mm and down graded hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 55.08 | cum | 5,446.6 | ₹2,99,998.73 |
| 5 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required attern etc. complete in all respect conforming to IRC
SP - 63:2018. | 765 | sqm | 608.4 | ₹4,65,426 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all liifts and leads, transporting to the site by mechanical means within a lead of 05kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H specifications for Road & Bridge works (04th Revision) | 28.56 | cum | 271.82 | ₹7,763.18 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.60 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_599129.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .