| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 CrRejected-AOC C BLOCK 4G YUGA KALPATARU NO 18 PILLAYAR KOIL STREET PADIKUPPAM ROAD KOYAMBEDU CHENNAI 600 107 | CHENNAI | TAMIL NADU | 600107 | ₹1.5 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI BLUE METALS | SRI SELLIAMMAN AND CO |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 Km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc., complete as per the direction of the departmental officers | 13,387.55 | m2 | 12,89,221.07 ₹15.2 L | 13,38,755 ₹15.8 L |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 99.04 | M3 | 2,46,510.56 ₹2.9 L | 2,47,600 ₹2.9 L |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., com | 990.4 | M2 | 89,631.2 ₹1.1 L | 99,040 ₹1.2 L |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 990.4 | M2 | 19,808 ₹23,373.44 | 29,712 ₹35,060.16 |
| 5.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 13,387.55 | m2 | 4,01,626.5 ₹4.7 L | 4,68,564.25 ₹5.5 L |
| 6.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 543.87 | M3 | 57,53,927.05 ₹67.9 L | 59,82,570 ₹70.6 L |
| 7.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 50.30 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 431.34 | M3 | 48,10,433.08 ₹56.8 L | 51,76,080 ₹61.1 L |
| 8.00 | Dismantling the Existing Damaged Cement Concrete Road including Cost and Conveyance all aother Materials to labour charges etc., complete as per standard specification | 42.5 | M3 | 22,100 ₹26,078 | 25,500 ₹30,090 |
| 9.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 21.25 | M3 | 1,16,513.75 ₹1.4 L | 1,19,000 ₹1.4 L |
| 10.00 | Vibrated Cement Concrete M20 Grade (Design Mix) using 20mm , & 12mm HBG Metal including cost and conveyance of all materials to site and including for the mixing, laying, watering,curing and compacting concrete, cost of form work, centering labour therefore including all leads of water vibration charges working in heights wherever necessary, cost premoulded expansion joints (Bitumen Pad),etc., and labour charges etc., complete as per standard specification | 182 | M3 | 13,17,170.4 ₹15.5 L | 14,56,000 ₹17.2 L |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
25 Feb 2026, 3:00 pmClosed
The Commissioner
New Colony 3rd Main Road,Chrompet
General Fund 2025 - 26 Road Work Zone II
2026_DMA_661112_1
59/2026/E1
Open Tender
Civil Works - Roads
90 days
Tambaram City Municipal Corporation Zone II
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.7 L
25 Apr 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 Km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc., complete as per the direction of the departmental officers
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., com
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 50.30 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Dismantling the Existing Damaged Cement Concrete Road including Cost and Conveyance all aother Materials to labour charges etc., complete as per standard specification
CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Vibrated Cement Concrete M20 Grade (Design Mix) using 20mm , & 12mm HBG Metal including cost and conveyance of all materials to site and including for the mixing, laying, watering,curing and compacting concrete, cost of form work, centering labour therefore including all leads of water vibration charges working in heights wherever necessary, cost premoulded expansion joints (Bitumen Pad),etc., and labour charges etc., complete as per standard specification
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TD.pdf
Tender Documents • 0.85 MB
BOQ_793438.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid