Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | KULBHUSHAN AGGARWALInferred winner L1₹4.6 LQualified GARI AHATA DALHOUSIE ROAD PATHANKOT 09988050367 PATHANKOT PUNJAB 145001 UDYAM PB 16 0001858 | PATHANKOT | PUNJAB | 145001 | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹4.6 L+₹468 (0.10%)Qualified B XXIII 56 A PREM NAGAR SAINGARGH PATHANKOT 145001 PUNJAB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹4.7 L+₹12,468 (2.70%)Qualified 0 GARI AHATA PATHANKOT PATHANKOT GURDASPUR PUNJAB 145001 UDYAM PB 16 0001729 03AHJPA0077B1Z7 B B R | PATHANKOT | PUNJAB | 145001 | L3 | Qualified MSE, MII, Category: General | |
| 4 | L4₹4.8 L+₹20,628 (4.47%)Qualified | L4 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
15 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MAINT and OPERATION
4734191
GEM/2023/B/3416593
Two Packet Bid
JOB WORK ORDER,JOB WORK ORDER,JOB WORK ORDER,JOB WORK ORDER
50 days
Punjab; Gurdaspur
Total value wise evaluation
BOQ
7 documents required · 7 mandatory
3 yrs
10%
Exempted
15 May 2023
12 May 2023
15 May 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | JOB WORK ORDER | 1. Maint and operation of Water Supply Installations i.e. Tube Well No-5(D-1A Zone) & Tube Well No 12(D-II Zone) viz. verticle turbine / submersible pumping sets of any capacity / discharge, installed at tubewells/pump house alongwith chloronome plant, calcium hypo dosers & stand by generating sets etc of any capacity/type/pattern including LT control panel with complete switch gears and starter & allied/connected fittings/fixtures with including minor repairing and replacement of gland packing, rubber coupling, nuts and bolts etc within the installaions, operation of sluice valve of pumping mains and distributions main for smooth supply of water to user including daily, weekly and periodical maintenance of DG Set, pump and chlorine plant like oiling, greasing, tightning of loose connection parts, cleaning and descaling of bleaching dozers/alotoch tank etc by deployment of one experienced operator /tradesman (Mate FGM) per shift per installation (total two installations consists of three shifts in a day i.e. tube well No 5 (D1A Zone) & tube well No 12 (D-II Zone) (08 hours each in three shifts, 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs) round the clock i.e. 24 hours in three shifts including sunday and holidays for smooth functioning of installations complete all as specified and as directed by the Engineer-in-Charge. | 1 | Job | Madanlal@1234 | 50 |
| 2 | JOB WORK ORDER | 2. Maint and operation of Water Supply Installations i.e. Tube Well No-37(D-II Zone) & Tube Well CBS Gharota viz. verticle turbine / submersible pumping sets of any capacity / discharge, installed at tubewells/pump house alongwith chloronome plant, calcium hypo dosers & stand by generating sets etc of any capacity/type/pattern including LT control panel with complete switch gears and starter & allied/connected fittings/fixtures with including minor repairing and replacement of gland packing, rubber coupling, nuts and bolts etc within the installaions, operation of sluice valve of pumping mains and distributions main for smooth supply of water to user including daily, weekly and periodical maintenance of DG Set, pump and chlorine plant like oiling, greasing, tightning of loose connection parts, cleaning and descaling of bleaching dozers/alotoch tank etc by deployment of one experienced operator /tradesman (Mate FGM) per shift per installation (total two installations consists of three shifts in a day i.e. tube well No 37 (D-II Zone) & tube well CBS Gharota (08 hours each in three shifts, 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs) round the clock i.e. 24 hours in three shifts including sunday and holidays for smooth functioning of installations complete all as specified and as directed by the Engineer-in-Charge. | 1 | Job | Madanlal@1234 | 50 |
| 3 | JOB WORK ORDER | 3. Maint and operation of Water Supply Installations i.e. Tube Well No AD Sump(D-IA Zone) & Tube Well No. 13 viz. verticle turbine / submersible pumping sets of any capacity / discharge, installed at tubewells/pump house alongwith chloronome plant, calcium hypo dosers & stand by generating sets etc of any capacity/type/pattern including LT control panel with complete switch gears and starter & allied/connected fittings/fixtures with including minor repairing and replacement of gland packing, rubber coupling, nuts and bolts etc within the installaions, operation of sluice valve of pumping mains and distributions main for smooth supply of water to user including daily, weekly and periodical maintenance of DG Set, pump and chlorine plant like oiling, greasing, tightning of loose connection parts, cleaning and descaling of bleaching dozers/alotoch tank etc by deployment of one experienced operator /tradesman (Mate FGM) per shift per installation (total two installations consists of three shifts in a day i.e. tube well No AD Sump (D-IA Zone) & tube well No 13 (08 hours each in three shifts, 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs) round the clock i.e. 24 hours in three shifts including sunday and holidays for smooth functioning of installations complete all as specified and as directed by the Engineer-in-Charge. | 1 | Job | Madanlal@1234 | 50 |
| 4 | JOB WORK ORDER | 4. Maint and operation of Water Supply Installations i.e. Tube Well No 52 (672 EME Wksp) & STP Bhaskar viz. verticle turbine / submersible pumping sets of any capacity / discharge, installed at tubewells/pump house alongwith chloronome plant, calcium hypo dosers & stand by generating sets etc of any capacity/type/pattern including LT control panel with complete switch gears and starter & allied/connected fittings/fixtures with including minor repairing and replacement of gland packing, rubber coupling, nuts and bolts etc within the installaions, operation of sluice valve of pumping mains and distributions main for smooth supply of water to user including daily, weekly and periodical maintenance of DG Set, pump and chlorine plant like oiling, greasing, tightning of loose connection parts, cleaning and descaling of bleaching dozers/alotoch tank etc by deployment of one experienced operator /tradesman (Mate FGM) per shift per installation (total two installations consists of three shifts in a day i.e. tube well No 52 (672 EME Wksp) & STP Bhaskar (08 hours each in three shifts, 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs) round the clock i.e. 24 hours in three shifts including sunday and holidays for smooth functioning of installations complete all as specified and as directed by the Engineer-in-Charge. | 1 | Job | Madanlal@1234 | 50 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4734191.pdf
GEM_BID
boqpump-final_2023-05-04-17-37-13_d9c244bb2293dc6097c8e3884c2aac9f.pdf
BOQ
pumphousenew_2023-05-04-17-37-13_22970f876fd6348a6f60a4c8eedecd4d.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .