Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹1.5 L−₹2,500 (1.68%)Rejected-Finance | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹1.5 L+₹2,400 (1.62%)Rejected-Finance NOT AVAILABLE | L3 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
Closing Date
27 Jun 2022, 2:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer MID Jammu
Up gradation, strengthening and extension of suction pipeline of pumping unit no II to water level along with allied mechanical works at lift irrigation station Nikowal new.
2022_IFC_174672_1
MID/J/e-NIT/2022-23/10
Open Tender
Repair and Maintenance Works
Item Wise
10 days
Nikowal
As per tender notice
7 documents required · 7 mandatory
₹200
EXECUTIVE ENGINEER MID JAMMU
Exempted
19 Sept 2022
18 Jun 2022
28 Jun 2022
18 Jun 2022
27 Jun 2022
21 Jun 2022
18 Jun 2022 - 27 Jun 2022
Up gradation, strengthening and extension of suction pipeline of pumping unit no II to water level along with allied mechanical works at lift irrigation station Nikowal new.
Up gradation, strengthening and extension of damaged suction pipeline to water level inside the sump of pumping unit no II installed at Lift irrigation station Nikowal new. Providing, fitting of 300 mm MS pipe of 27 ft length for pump for replacement and extension upto the water level inside suction sump. Carriage of MS pipes to lift irrigation station using carriage vehicle and then unloading and shifting of pipes to lift station on head load. The pipe is to be fitted and divided as per alignment of suction pipeline as per site conditions. Providing, fitting and welding of 300 mm diameter MS flanges. Total number of 300 mm diameter plate flanges required is 10 no’s. The welding on all flanges should be double layered and leak proof. Providing and fitting of hexagonal nuts, bolts and rubber gaskets required for the job. The job includes laying and realigning of MS Pipeline from suction side of pumping units to sump tank of the lift irrigation station. Painting the suction pipeline by rubbing the surface with sand paper to make the painting area smooth and then painting with one coat of red oxide primer and two coats of high quality (Asian/ Nerolac/ Berger paint). Providing and fitting of cast iron, flanged foot valve with pressure rating of PN 0.2 of reputed make for pumping unit, the door face should consists of rubber with reinforcement of cotton canvas, after replacing existing damaged foot valve of pumping unit no II by cutting rusted nuts, bolts with gas cutting at intake source. Complete job includes cost of material, welding charges, skilled/ semi-skilled labour, transportation charges, carriage charges of material on head load from road side to lift station on head load. Note:- The Tenderers are requested to visit the site and quote the rate as per site conditions. Any modifications/ alterations of the job, felt necessary if required at the time of actual execution may be /done as per actual site conditions. The firm should offer rebate on old material.
Rebate on Old Parts
M/S NARESH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
N B Engineering and Electric Works
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .