Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -0.50% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹2,132.25 (1.51%)Admitted-Finance | +1.00% | ₹1.4 L+₹2,132.25 (1.51%) | L2 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹2,840
Closing Date
7 Sept 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
KTL-1 Amtc of EPHS in various sector UE Kaithal.
2026_HBC_544409_1
20261718F34B F6FC 498C B014 AD48BAAFFF95240HSV
Open Tender
Civil Works
Works
60 days
Kaithal
2 documents required · 2 mandatory
₹250
₹2,840
Yes
15 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.LB008] LB008. Beldar | 40 | Per day | 325 | ₹13,000 |
| 2 | [1.PM026] PM026. Tractor with trolley | 4 | Per day | 6,237 | ₹24,948 |
| 3 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | 4 | Per day | 6,493 | ₹25,972 |
| 4 | [5.1.1]Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : 1. In lime mortar | 10.35 | cum | 534 | ₹5,526.9 |
| 5 | [5.14]Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 30 | Sqm | 35 | ₹1,050 |
| 6 | [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) | 0.5 | cum | 480 | ₹240 |
| 7 | [5.26]Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. | 5.66 | cum | 1,971 | ₹11,155.86 |
| 8 | [5.7.1]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 1. In mud mortar | 3.47 | cum | 225 | ₹780.75 |
| 9 | [5.7.3]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 3. In lime mortar | 25.84 | cum | 347 | ₹8,966.48 |
| 10 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar | 13.15 | cum | 585 | ₹7,692.75 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_623937.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .