Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹29.9 LAccepted-AOC 0 ISLAMPUR BELDHA DEVIPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | Ist | Accepted-AOC L1 | |
| 2 | L5₹46.6 LRejected-AOC | L5 | Rejected-AOC L5 | |
| 3 | IInd₹35.6 LRejected-AOC | IInd | Rejected-AOC L2 | |
| 4 | IIIrd₹38.0 LRejected-AOC | IIIrd | Rejected-AOC L3 | |
| 5 | IVth₹45.5 LRejected-AOC 0 PURE LADAI SADR PURE LADAI SULTANPUR SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | IVth | Rejected-AOC L4 |
Tender Value
₹52.6 L
EMD Value
₹53,000
Closing Date
7 Feb 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
149/ETC-II(P)/ 2021-2022
2022_UPTCL_675230_1
149/ETC-II(P)/ 2021-2022
Open Tender
Electrical Works
Item Rate
365 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,490
EE,ETD-NAINI,PRAYAGRAJ
₹53,000
23 May 2022
29 Jan 2022
8 Feb 2022
29 Jan 2022
7 Feb 2022
29 Jan 2022
120 days
Amount
Tower to Tower Patrolling (every 3 months i.e. 4 times a year) of following 132 kV Transmission lines, from one end to other end and submission of Patrolling Report within Seven days after completion of each patrolling in Triplicate in prescribed proforma mentioning stolen/ missing Tower parts & Tower Accessories such as missing Danger/ Phase/ Number Plates, Trees/ Tree branches & Bamboo Kothi falling in Line Corridor, damage to Earth wire, Conductor, Jumpers, Insulators & other Line Accessories damage to Foundation, Coping, Chimney, Earthing etc., with the help of Patrolling Teams:-
132 kV Masauli-Salayakhurd DC line -- 27.4 K.M.
132 kV Masauli- Naini DC line -- 53.74 K.M.
132 kV Masauli-Meja D/C line -- 20 K.M.
132 kV Masauli-Karchana D/C line -- 26.45 K.M.
132 kV Masauli-Rewa road line -- 49.54 K.M.
132 kV Masauli-Jari DC line -- 57.1 K.M.
132 kV Rewa road -koraon DC line -- 64.70 K.M.
Lilo portion of 132 kV Rewa road -Salayakhurd & korav -Salayakhurd line -- 3 K.M.
132 kV Meja -Jigna S/C Line -- 29.6 K.M.
132 kV Rewa road -Naini S/C & D/C line -- 8.8 K.M.
132 kV Naini -Jhunsi line ckt-I -- 14.4 K.M.
132 kV Naini -Jhunsi line ckt-II -- 19.8 K.M.
132 kV Rewa road-karchana line -- 29.5 K.M.
132 kV Rewa road-Shankargarh S/C line -- 31.90 K.M.
132 kV Jari- Shankargarh S/C line -- 30.50 K.M.
132 kV Shankargarh YPC S/C line -- 11.27 K.M.
132 kV Meja -Kosadakala S/C Line -- 29.60 K.M.
Emergency Patrolling in case of any tripping/ breakdown of line. The emergency Patrolling includes checking of Towers, conductors, earth wire, insulators, clamps, fittings etc. to locate the defect/fault/deficiencies. The emergency patrolling has to be started within 6 hours after receiving the call of SDO/JE.
Up to 15 Kms
Above 15 Kms upto 30 Kms
Above 30 Kms
Lopping/ Chopping of various species of tree branches falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power/telephone lines passing near cicinity of the trees all the above lines along with throwing of cut branches at least 50 meter away from the line corridor as per details below (Three times in a year/ as per requirement)
132 kV Masauli-Salayakhurd DC line
132 kV Masauli- Naini DC line
132 kV Masauli-Meja D/C line
132 kV Masauli-Karchana D/C line
132 kV Masauli-Rewa road line
132 kV Masauli-Jari DC line
132 kV Rewa road -koraon DC line
Lilo portion of 132 kV Rewa road -Salayakhurd & korav -Salayakhurd line
132 kV Meja -Jigna S/C Line
132 kV Rewa road -Naini S/C & D/C line
132 kV Naini -Jhunsi line ckt-I
132 kV Naini -Jhunsi line ckt-II
132 kV Rewa road-karchana line
132 kV Rewa road-Shankargarh S/C line
132 kV Jari- Shankargarh S/C line
132 kV Shankargarh YPC S/C line
132 kV Meja -Kosadakala S/C Line
Cutting of bamboo bushes falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power/telephone lines passing near vicinity of the trees all the above lines along with disposal of cut branches away from the line corridor (Three times in a year/ as per requirement)
Periodic Cutting of different types of Trees having Girth 0.5 Meter to 1.0 Meter and Falling in the safety Corridor of above Transmission Lines to Provide Minimum Clearance of aboutt 8 Meter between the Tres & Conductors on both side of the Towers / Line with all due Care of Safety & Precautions to avoid any damage to nearby Buildings, Power & Telephone Lines. The Work also includes Removing, Eliminating , Cleaning the Line Sites after Cutting of the Trees
Removal of Bolts-Nuts of damaged/ Cut Tower Pieces of above 132 kV Transmission Lines by due Cutting of Tack Welding with the help of Grinding/ CuttingTools. (No.per Bolt)
Replenishment of Tower Parts in Place of Missing Ones after due Fabrication from 'Off' size G.I .Angles (to be Provided by the Department) as per Requirement at different Tower Locations of above 132 kV Transmission Lines; Proper Tightening & Chamfering etc. including Transportation of G.I.Angles from UPPTCL store to site.
Tack Welding of the Bolts-Nuts of the newly Replenished Towcrs Parts with 3 Tacks of 10 mm thickness & Finally, Applying of Zinc Rich Aluminium Paint on the Affected Surfaces (No.per Bolt)
Providing & Fixing of Number Plate as per Sample in Place of Missing Ones at different Tower Locations of above 132 kV Transmission Lines with Proper Tightening including Cost of Number Plate.
Providing & Fixing of phase Plate set (set of R, Y, B) as per Sample in Place of Missing Ones at different Tower Locations of above 132 kV Transmission Lines with Proper Tightening including Cost of Phase Plates set.
Providing & Fixing of Danger Plate as per Sample in Place of Missing Ones at different Tower Locations of above 132 kV Transmission Lines with Proper Tightening including Cost of Danger Plate.
Earthing Work on Towers of above 132 kV Transmission Lines (at Locations where Earthing is Damaged) by Providing of Pipe type Earthing Equipment Set (consisting of 32 mm dia 3050 mm long Heavy Duty perforated 'C' class G.I Pipe, 50 mm x 6 mm size & 4750 mm long Galvanised steel flat, 2 No. 12 mm x 40 mm size G.I Bolts with Nuts & Spring washers etc. as per Sample) including Earthing Work and Cost of Coke, Salt etc. (1 Job per Earthing). All material to be provided by contractor at his own cost
Repairing of Damaged Coping of Tower foundations of above 132 kV Trangmission Lines with Cost of Cement, Mortar, Sand etc. (1 Job for each Leg of Tower)
Repairing of Damaged Chimney of Tower foundations of above 132 kV Trangmission Lines with Cost of Cement, Mortar, Sand etc. including breaking of damaged portion, if any (one Job for cach chimney)
Back filling of tower legs of above 132 kV Transmission lines with earth upto ground level including cost of earth, levelling, ramming etc.
Diversion/ Mobilization of Gang for Attending Break Down due to Damage of Jumper/ Suspension Disc Insulator / Suspension Disc Insulator string/ Suspension polymer Insulator string, tightening of jumper, dislocated vibration damper of conductor/ Earth wire, copper bond etc. of above 132 kV Tranamission Lines to Complete the Work in minimum time and Return Back of the Gang after Completion of the Work. (1 Job per Break Down/ shut Down).
Tightening of Jumper alongwith Replacement of Fasteners, if Required (to be Provided by the Deparrtment) as per Requirement on Section Towers of above 132 kV Transmission lines.
Replacement of Damaged Jumper alongwith Replacement of Fasteners with New One by Making Jumper with Compression Joint Method/ Replenishment of Jumper with the help of P.G.Clamps on above 132 kV Transmission Lines
Replacement of Damaged/ De-Capped Suspension Disc Insulators/ Suspension Disc Insulator String/ Damaged Suspension Polymer Insulator String on Suspension Towers on above 132 kV transmission line.
Re-Fixing & Tightening of Dislocated/ Shifted Conductor Vibration Damper to its Place Including Replacement of Fastencrs, if Required (to be Provided by the Depertment) as per Requirement on above 132 kV transmission lines.
Tightening of earthwire suspension clamp on A type tower of above 132 kV transmission line
Replacement of Damaged earthwire copper bond by new one (to be provided by department) on section tower of above 132 kV transmission lines .
Re-fixing & tightening of dislocated/ shifted earthwire vibration damper to its place including replacement of fasterners, if required (to be provided by department) as per requirements on above 132 kV transmission lines.
Diversion / Mobilization of Gang for Replacement of Damaged Tension Disc Insulator / Tension Disc Insulator String / Polymer Insulator String, Replacement / Repairing of Damaged Portion of Conductor, Removal of P.G. Clamps from the Conductor Earlier Used for Connecting the Jumper by Fixing of Jumper with Compressed Cone on Conductor and Replacement / Repairing of Damaged Portion of Earth Wire / Replenishment of Missing Earth Wire of above 132 kV Transmission Lines Required to Complete the Work in Bare Minimum Time end Retum Back of the Gang after Completion of the Work. (1 Job per Planned Shut Down )
Replacement of Damaged / De-Capped Tension Disc Insulator / Tension Disc Insulator String / Defective Tension Polymer Insulator String on Section Towers of above 132 kV Transmission Lines (1 Job per String )
Replacement / Repairing of Damaged Portion of Conductor / Replacement of P.G. Clamps from the Conductor of above 132 kV Transmission Line by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of the Damaged Portion / Part Portion of the Conductor, Jointing new Conductor with the help of Mid Span Compression Joint and/ or Dead End Fitting by Making Compression Joint. Finally, Re-Stringing & re-Sagging of the Conductor as per Sag Chart with Clamping the Conductor at Suspension Towers as Required, as per Details below:-
1 Conductor of 1 Span Section.
1 Conductor of more than one Span Section and Length upto 1 Km
1 Conductor of more than 1 Span Section and Length between 1 to 2 Km.
1 Conductor of more than 1 Span Section and Length more than 2 Km.
Replacement / Repairing of Damaged Portion of Earth Wire / Replenishment of Missing Earth Wire of above 132 KV Transmission Lines by Way of Releasing the damaged earth Wire from Suspension Fitting of Towers between the Section, Cutting the damaged portion of Earth Wire, Jointing of new Earth Wire with the help of Mid Span Compression joints and Finally, Re-Stringing earthwire as per Sag Chart with Clamping at Suspension Towers as Required of above 132 kV transmission lines as per Details below:
Earth wire of 1 Span Section.
Earth wire of more than Span Section and Length upto 1 Km
Earth wire of more than 1 Span Section and Length between 1 to 2 Km.
Earth wire of more than 1 Span Section and Length more than 2 Km.
Immediate Diversion / Mobilization of Gang for Attending Break Down due to Damage of Tension Disc Insulator String/Tension Polymer Insulator String / Conductor / Earth wire of above 132kv transmission line ,required to completion of work in bare minimum time & return back of gangs after completion of work (1 job per breakdown )
Replacement of Damaged / De-Capped Tension Disc Insulator / Tension Disc Insulator String/Damaged Tension Polymer Insulator String on Section Towers of above 132kv transmission lines .
Attending Breakdown of conductor by Replacement / Repairing of Damaged Portion of Conductor of above 132kv Transmission Lines by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of Damaged Portion of the Conductor, Jointing new Conductor with the help of Mid Span Joint / Dead End Fitting / Repair Sleeve by Making Compression Joint. Finally, Re-Stringing and Sagging of the Conductor as per Sag Chart with Clamping the Conductor at Suspension Towers as Re:uired as per Details below ;-
(i) 1 Conductor of 1 Span Section.
(ii) 1 Conductor of more than Span Section and Length upto 1 Km
(iii) 1 Conductor of more than 1 Span Section and Length between 1 to 2 Km.
(iv) 1 Conductor of more than 1 Span Section and Length more than 2 Km.
Hot spot scanning of jumpers on all section towers, mid span joints, repair sleeves of following 132 KV lines.Real time pictures of thermoscan spacers jumpers, midspan joint & repair sleeve comprising all details of tower line, tower, temperature must be provided in A-4 photo sheet. One A-4 sheet should not contain more then 6 photograph. (Once in a year)
132 kV Masauli-Salayakhurd DC line -- 27.4 K.M.
132 kV Masauli- Naini DC line -- 53.74 K.M.
132 kV Masauli-Meja D/C line -- 20 K.M.
132 kV Masauli-Karchana D/C line -- 26.45 K.M.
132 kV Masauli-Rewa road line -- 49.54 K.M.
132 kV Masauli-Jari DC line -- 57.1 K.M.
132 kV Rewa road -koraon DC line -- 64.70 K.M.
Lilo portion of 132 kV Rewa road -Salayakhurd & korav -Salayakhurd line -- 3 K.M.
132 kV Meja -Jigna S/C Line -- 29.6 K.M.
132 kV Rewa road -Naini S/C & D/C line -- 8.8 K.M.
132 kV Naini -Jhunsi line ckt-I -- 14.4 K.M.
132 kV Naini -Jhunsi line ckt-II -- 19.8 K.M.
132 kV Rewa road-karchana line -- 29.5 K.M.
132 kV Rewa road-Shankargarh S/C line -- 31.90 K.M.
132 kV Jari- Shankargarh S/C line -- 30.50 K.M.
132 kV Shankargarh YPC S/C line -- 11.27 K.M.
132 kV Meja -Kosadakala S/C Line -- 29.60 K.M.
Cleaning of Disk Insulator String of suspension Tower by removing all types of foreign particles sticking on the surface of disc insulator in suspension string of following Transmission lines:(of polluted area) (One no means one circuit of 3 string of Insulators):-
132 kV Masauli-Salayakhurd DC line
132 kV Masauli- Naini DC line
132 kV Masauli-Meja D/C line
132 kV Masauli-Karchana D/C line
132 kV Masauli-Rewa road line
132 kV Masauli-Jari DC line
132 kV Rewa road -korav DC line
Lilo portion of 132 kV Rewa road -Salayakhurd & korav -Salayakhurd line
132 kV Meja -Jigna S/C Line
132 kV Rewa road -Naini S/C & D/C line
132 kV Naini -Jhunsi line ckt-I
132 kV Naini -Jhunsi line ckt-II
132 kV Rewa road-karchana line
132 kV Rewa road-Shankargarh S/C line
132 kV Jari- Shankargarh S/C line
132 kV Shankargarh YPC S/C line
132 kV Meja -Kosadakala S/C Line
Repairing of rusted legs breaking of chimney of size 300mm x 300 mm at least 700 mm depth.proper cleaning of stub with hardware brush etc to remove rust and dust from the surface of stub and then making holes in the stub and fixing of additional galvanized angle piece of at least 1000 mm long length with nuts and bolts and then electrical welding with stub in a length of 200 mm interval and then painting of welded portion with zinc rich primer paint and then increasing the height chimney around ½ feet from its initial height to avoid rust formation due to storage of water with 1:2:4 ratio of cement concrete and sand .(work include supply of all material i.e. cement ,concreate,sand ,paint ,galvanized angle and nut bolt)
Shaurya Shakti Enterprises
V S Enterprises
E-VISION INFRATECH
Umawala Engineers Pvt. Ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .