Loading…
Loading…
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
24 Jul 2026, 4:00 pm
Er. Shamis Din
Executive Engineer PWD RNB Division Kishtwar
Please refer BOQ
2026_PWDJK_314287_10
e-NIT No. 27 of 2026-27 Dated 02-07-2026
Open Tender
Civil Works
30 days
KISHTWAR
Please refer NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RNB Division Kishtwar
₹4,200
3 Jul 2026
3 Jul 2026
25 Jul 2026
3 Jul 2026
24 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil. | 12.69 | Cum | 479.3 | ₹6,082.32 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:5:10) grade, with 40mm nominal size of crushed aggregates. | 1.78 | Cum | 4,826.5 | ₹8,591.17 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in M-10(1:3:6) grade, with 20mm nominal size of stone aggregates, | 3.72 | Cum | 5,733.6 | ₹21,328.99 |
| 4 | Brick work with F.P.S bricks of class designation 75 in 1:6 (cement: sand) mortar. | 4.38 | Cum | 7,571.55 | ₹33,163.39 |
| 5 | Extra for brick work in superstructure above plinth level (by manual mean). | 4.38 | Cum | 1,455.65 | ₹6,375.75 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 9,821.85 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 92 | kg | 123.2 | ₹11,334.4 |
| 8 | Centering and Shuttering including strutting, popping and removal of form work for Foundations: footings, bases of columns | 12.08 | Sqm | 286.35 | ₹3,459.11 |
| 9 | Centering and Shuttering including strutting, popping and removal of form work for Suspended floors, roofs, landings, balconies and access platforms | 5.34 | Sqm | 718.2 | ₹3,835.19 |
| 10 | Centering and Shuttering including strutting, popping and removal of form work for Edges of slabs and breaks in floors and walls Under 20 cm wide | 17.38 | mtr | 262.2 | ₹4,557.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_1017911.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid