| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.7 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected in Technical Evaluation |
| Sl No | Description | Qty | Unit | Annadurai.M L1 |
|---|---|---|---|---|
| 1.00Earth work excavation in all classes of soil except sand and rock such as hard stiff clay black cotton shales murrums hard red earth gravelly soil etc with initial lead and lift and depositing on banks as per ss 20 B etc complete | ||||
| 1.01 | Footing | 175 | cum | 226 ₹39,550 Lowest |
| 1.02 | Grade Beam | 31 | cum | 90.5 ₹2,805.5 Lowest |
| 2.00 | Supply and filling of crusher stone dust including cost and conveyance of all materials and including all labour charges etc complete | 78 | cum | 273.5 ₹21,333 Lowest |
| 3.00 | Plain cement concrete 1:4:8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour charges etc complete | 36 | cum | 5,382 ₹1,93,752 Lowest |
| 4.00Reinforced cement concrete 1:1.5:3 mix using 20 mm HBG ISS metal including cost and conveyance of all materials and including all labour charges etc complete | ||||
| 4.01 | Basement up to 1.50 M below GL | 38 | cum | 8,550.5 ₹3,24,919 Lowest |
| 4.02 | Super structure Ground floor | 63 | cum | 8,695.5 ₹5,47,816.5 Lowest |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 11,120 | Kg | 93.2 ₹10,36,384 Lowest |
| 6.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | ||||
Tender Value
₹60 L
EMD Value
₹60,000
Closing Date
13 Feb 2025, 3:00 pmClosed
Commissioner,Tambaram City Municipal Corporation
1, Muthuranga Mudali St, West Tambaram, Tambaram, Chennai, Tamil Nadu 600045
Construction of New Additional school building at Thiruneermalai Lakhshmipuram Padasalai street Primary school at Main Road in Ward no.29 Zone 1 in Tambaram City Municipal Corporation
2025_DMA_522205_1
1876/2024/E1(Z1)
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thiruneermalai Area Zone -1
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹60,000
30 Jan 2026
1 Feb 2025
13 Feb 2025
1 Feb 2025
13 Feb 2025
1 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .