Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance N A | FARIDABAD | HARYANA | 121004 | +3.10% | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹5,972.95 (1.94%)Admitted-Finance 132 02 ASAMANIA DEY STREET P O SANTIPUR DIST NADIA PIN 741404 | SANTIPUR | NADIA | WEST BENGAL | 741404 | +5.10% | ₹3.1 L+₹5,972.95 (1.94%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 L+₹10,154.02 (3.30%)Admitted-Finance 50 12 JYOTISH ROY ROAD KOLKATA 700053 | KOLKATA | WEST BENGAL | 700053 | +6.50% | ₹3.2 L+₹10,154.02 (3.30%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
27 Aug 2026, 10:30 amClosed
EEC, BR-VII, KMC
9/1A, AJC BOSE ROAD, KOL-17
REPAIRING OF PASSAGE AT 4N LOKNATH BOSE GARDEN LANE AND 27, GOBRA GOROSTHAN ROAD IN WARD NO.59
2026_KMC_1038442_2
KMC/EEC/VII/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
BOROUGH VII, KMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
17 Sept 2026
17 Aug 2026
29 Aug 2026
17 Aug 2026
27 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 41.22 | M3 | 79.9 | ₹3,293.72 |
| 2 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 206.12 | SQM | 361 | ₹74,407.52 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 294.45 | SQM | 34 | ₹10,011.3 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 41.22 | M3 | 166 | ₹6,843.02 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 294.45 | SQM | 50 | ₹14,722.5 |
| 6 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(15)Labour for taking out old soling edging including removing debris. (a) Single flat soling | 88.34 | %SQ | 9.81 | ₹866.57 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 2. Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 88.34 | SQM | 40 | ₹3,533.4 |
| 8 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 19.14 | M3 | 5,498 | ₹1,05,228.2 |
| 9 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 15 | EA | 269.5 | ₹4,042.5 |
| 10 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | 8 | EA | 1,758.9 | ₹14,071.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
TF5911.pdf
Tender Documents • 0.58 MB
BOQ_2551064.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .