Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -47.77% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹5,350.29 (2.76%)Admitted-Finance | -46.33% | ₹2.0 L+₹5,350.29 (2.76%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 L+₹51,942.43 (26.8%)Admitted-Finance | -33.79% | ₹2.5 L+₹51,942.43 (26.8%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical eNIT No date and work name not mentioned on try challan |
Tender Value
₹3.7 L
EMD Value
₹7,440
Closing Date
14 Aug 2026, 4:00 pmClosed
Er Vinod Raina
Executive Engineer Jal Shakti IFC Div Bhaderwah
Restoration of damaged spots of L. B. canal (Excluding Rd. 1/150 M and 1/200 M).
2026_IFC_319706_1
eNIT11 of 2026-27 dated 06.08.2026
Open Tender
Civil Works
Percentage
30 days
Bhaderwah
as per eNIT
8 documents required · 8 mandatory
₹600
Executive Engineer Jal Shakti IFC Div Bhaderwah
₹7,440
20 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms l | 4.73 | M³ | 479.3 | ₹2,267.09 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.5 | M³ | 5,202.9 | ₹23,413.05 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: | 28.8 | M³ | 5,402.9 | ₹1,55,603.52 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks | 5.88 | M3 | 7,564.8 | ₹44,481.02 |
| 5 | Dry boulder filling including supply of stones | 1.47 | M3 | 937.9 | ₹1,378.71 |
| 6 | 12mm Cement plaster of mix: 1:4 ( 1 cement : 4 fine sand) | 76.5 | M² | 283.8 | ₹21,710.7 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement
slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nomi | 45 | M2 | 562.15 | ₹25,296.75 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 10.5 | M² | 628.95 | ₹6,603.98 |
| 9 | Carriage of stones for ann average distance of 20 km by MT and 750 m by H/L | 28.8 | M3 | 1,437.99 | ₹41,414.11 |
| 10 | Carriage of sand & 20 mm aggregate from nearest crusher to site of work average distance 35 km by MT and 1.00 km by head load | 26.4 | M3 | 1,606.32 | ₹42,406.85 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1059885.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .