| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.0 CrAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹3.3 Cr+₹27.2 L (9.08%)Rejected-Finance AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | L-2 | Rejected-Finance L-2 |
| Sl No | Description | Qty | Unit | M/s Bansal Construction L1 | M/S RIDAM ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in removal of overburden in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | 6,074.17 | M3 | 85 ₹5,16,304.2 Lowest | 100 ₹6,07,416.7 |
| 2.00 | Earth work in excavation of foundation in all types of soil including hard soil mixed with boulder, soft and disintegrated rock including all leads, lifts, labour charges its proper disposal, T&P etc. required for proper completion of work. | 4,194.68 | M3 | 136 ₹5,70,475.8 Lowest | 200 ₹8,38,935 |
| 3.00 | C.C. 1:3:6 (M-10) in foundation with cement, coarse sand, FM not less than 2.0, hard stone ballast 20 to 40 mm. size including all cost of material, labour, T&P etc. complete required for proper completion of work. | 800.25 | M3 | 4,030 ₹32,24,991.38 Lowest | 4,200 ₹33,61,033.2 |
| 4.00 | Providing and laying C.C. (M-15) in drain with cement, coarse sand, FM not less than 2.0 and crushed hard stone grit 4.75 to 20 mm. size including cost of all material, lead, lift, T&P etc. but excluding centering & shuttering required for proper completion of work. | 300.01 | M3 | 4,550 ₹13,65,036.4 Lowest | 5,030 ₹15,09,040.24 |
| 5.00 | Laying C.R. stone masonry in 1:3 C.M upto 3 m. height and lead upto 60 m. with cement, coarse sand, FM not less than 2.0 and stone boulder including cost of all material, labour and T&P etc. required for proper completion of work. | 4,496.04 | M3 | 5,180 ₹2,32,89,487.2 Lowest | 5,600 ₹2,51,77,824 |
| 6.00 | Providing and fixing 75 mm Ø polyethyless (HDPE) Pipe in weep hole 1.5 m c/c along the canal . Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. | 2,117.7 | R.M. | 180 ₹3,81,186 Lowest | 200 ₹4,23,540 |
| 7.00 | Centering and shuttering for C.C. work including cost of all material, labour, T&P etc. required for proper completion of work. | 2,003.79 | M2 | 190 ₹3,80,720.86 Lowest | 230 ₹4,60,872.62 |
| 8.00 | Stuck deep cement pointing in 1:2 C.M.mortar over R.R stone masonary with all labour material T&P etc. required for proper completion of work . per m2 | 2,405.49 | M2 | 100 ₹2,40,549 Lowest | 130 ₹3,12,713.7 |
Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
23 Jul 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Constructoin of Breast wall with drain at Left bank of canal from Km. 11.400 to Km. 11.950of B.S.F.C.
2026_UPIDC_1168208_3
03/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Sidhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹6.5 L
28 Sept 2026
10 Jul 2026
23 Jul 2026
10 Jul 2026
23 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in removal of overburden in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | 0.8 | M3 | - | - |
| 2 | Earth work in excavation of foundation in all types of soil including hard soil mixed with boulder, soft and disintegrated rock including all leads, lifts, labour charges its proper disposal, T&P etc. required for proper completion of work. | - | M3 | - | - |
| 3 | C.C. 1:3:6 (M-10) in foundation with cement, coarse sand, FM not less than 2.0, hard stone ballast 20 to 40 mm. size including all cost of material, labour, T&P etc. complete required for proper completion of work. | 0.4 | M3 | - | - |
| 4 | Providing and laying C.C. (M-15) in drain with cement, coarse sand, FM not less than 2.0 and crushed hard stone grit 4.75 to 20 mm. size including cost of all material, lead, lift, T&P etc. but excluding centering & shuttering required for proper completion of work. | 0.2 | M3 | - | - |
| 5 | Laying C.R. stone masonry in 1:3 C.M upto 3 m. height and lead upto 60 m. with cement, coarse sand, FM not less than 2.0 and stone boulder including cost of all material, labour and T&P etc. required for proper completion of work. | 1 | M3 | - | - |
| 6 | Providing and fixing 75 mm Ø polyethyless (HDPE) Pipe in weep hole 1.5 m c/c along the canal . Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. | 1 | R.M. | - | - |
| 7 | Centering and shuttering for C.C. work including cost of all material, labour, T&P etc. required for proper completion of work. | 0.6 | M2 | - | - |
| 8 | Stuck deep cement pointing in 1:2 C.M.mortar over R.R stone masonary with all labour material T&P etc. required for proper completion of work . per m2 | 1 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Lot_3.pdf
Tender Documents • 3.49 MB
BOQ_2191201.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .