Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.4 LAccepted-AOC VILLAGE SHEKHAI P O DHADI GUNSA TEHSIL ROHRU DISTT SHIMLA HIMACHAL PRADESH | ROHRU | SHIMLA | HIMACHAL PRADESH | L-1 | Accepted-AOC 1 | |
| 2 | L-2₹8.8 L+₹4,695.76 (0.54%)Rejected-Finance 126 RAJ KUMAR SANGAT SINGH NAGAR ADARSH NAGAR JALANDHAR JALANDHAR PUNJAB 144008 | JALANDHAR | PUNJAB | 144008 | L-2 | Rejected-Finance 2m lowest |
| Sl No | Description | Qty | Unit | KAPIL DEV L1 | Raj Kumar L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals. | 22.5 | Per Cubic meter | 270 ₹6,075 Lowest | 272 ₹6,120 |
| 2.00 | Earth work in excavation for all type of road structure such as retaining walls,breast walls,culverts,drains and parapets etcetera in all type of classification of soil comprising of ordinary soil,ordinary rock,hard rocks,chiseling/wedging out of rock (where blasting is prohibited) as per drawing and MORD technical specification Clause 305.1 and as per direction of the Engineer-in-Charge i | 24.3 | Per Cubic meter | 440 ₹10,692 Lowest | 442 ₹10,740.6 |
| 3.00 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications within all leads and lifts as directed by the Engineer-In-Charge | 93.75 | Per Cubic meter | 3,000 ₹2,81,250 Lowest | 3,005 ₹2,81,718.75 |
| 4.00 | Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge. | 600.67 | Per Cubic meter | 190 ₹1,14,127.3 Lowest | 192 ₹1,15,328.64 |
| 5.00 | Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge. | 439.05 | Per Cubic meter | 290 ₹1,27,324.5 Lowest | 293 ₹1,28,641.65 |
| 6.00 | Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge. | 807.46 | Per Cubic | 410 ₹3,31,058.6 Lowest | 412 ₹3,32,673.52 |
Tender Value
₹8.4 L
EMD Value
₹16,800
Closing Date
24 Mar 2022, 6:00 pmClosed
E E B and R Divn HPPWD ROHRU
E E B and R Divn HPPWD ROHRU
(SH-B/wall in wire crate at RD 2/420 to 2/450 and widening of road km 3/030 to 3/060 3/825 to 3/915, 4/330 to 4/420)
2022_PWD_58260_13
PW-RD-GA-T-16125-224dt18-2-22
Open Tender
Civil Works - Roads
Item Rate
60 days
Rohru
Please refer Tender documents.
14 documents required · 14 mandatory
₹500
₹16,800
30 Jul 2026
19 Mar 2022
25 Mar 2022
19 Mar 2022
24 Mar 2022
19 Mar 2022
Amount
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals.
Earth work in excavation for all type of road structure such as retaining walls,breast walls,culverts,drains and parapets etcetera in all type of classification of soil comprising of ordinary soil,ordinary rock,hard rocks,chiseling/wedging out of rock (where blasting is prohibited) as per drawing and MORD technical specification Clause 305.1 and as per direction of the Engineer-in-Charge i
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications within all leads and lifts as directed by the Engineer-In-Charge
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge.
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge.
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with in all leads and lifts as per drawing and Techical Specification Clause 1603.1 and as per the direction of the Engineer-in-Charge.
Raj Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .