| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.0 LRejected-AOC | ₹3.0 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹3.2 LRejected-AOC | ₹3.2 L | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | G R RAJASEKAR L1 | NARPAVI TRADERS L3 | AHIRA DALMAIDA TERRIL DALMAIDA L2 |
|---|---|---|---|---|---|---|
| 1.00Name of Work:Renovation of CDPO Building at Tiruchendur Union Office Premises in Tiruchendur Union | ||||||
| 2.00 | Clean removal of cement plaster from walls & Ceiling (SOR Pg 34 W-0104) | 159 | Sqm | 9 ₹1,431 | 65 ₹10,335 | 8.9 ₹1,415.10 |
| 3.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 422.65 | Sqm | 120 ₹50,718 | 60 ₹25,359 | 147.3 ₹62,256.35 |
| 4.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 79.64 | Sqm | 280 ₹22,299.20 | 285 ₹22,697.40 | 279.9 ₹22,291.24 |
| 5.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 213.09 | Sqm | 230 ₹49,010.70 | 215 ₹45,814.35 | 261.9 ₹55,808.27 |
| 6.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 159 | Sqm | 270 ₹42,930 | 250 ₹39,750 | 302.4 ₹48,081.60 |
| 7.00 | Medium Density Fibre (MDF) Board 12mm thick Exterior
Grade with Melamine finish (SOR 2025-26 Pg 83 M-0384) | 4.3 | Sqm | 1,000 ₹4,300 | 265 ₹1,139.50 | 1,224.8 ₹5,266.64 |
| 8.00 | Solid PVC Door Shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel
tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using 5mm thick solid PVC Sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter (SOR 2025-26 Pg 84 M-0390) (Toilet Door) | 6.3 | Sqm | 3,000 ₹18,900 | 156 ₹982.80 | 3,255.2 ₹20,507.76 |
| 9.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 77.94 | Sqm | 120 ₹9,352.80 | 1,200 ₹93,528 | 155.9 ₹12,150.85 |
| 10.00 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works). | 23.9 | Sqm | 1,100 ₹26,290 | 1,350 ₹32,265 | 1,173.2 ₹28,039.48 |
Updated dates
Tender Value
₹3.8 L
EMD Value
₹3,750
Closing Date
28 Jan 2026, 3:00 pmClosed
Block Developmenet officer (BP)
Block Developmenet officer (BP) Panchayat Union office, Tiruchendur
Renovation of CDPO Building at Tiruchendur Union Office Premises in Tiruchendur Union
2026_RDTN_642654_1
A2/0010/2026
Open Tender
Civil Works - Buildings
60 days
Tiruchendur Union
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹3,750
Panchayat Union office, Tiruchendur
11 Apr 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
27 Jan 2026
Clean removal of cement plaster from walls & Ceiling (SOR Pg 34 W-0104)
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Medium Density Fibre (MDF) Board 12mm thick Exterior Grade with Melamine finish (SOR 2025-26 Pg 83 M-0384)
Solid PVC Door Shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using 5mm thick solid PVC Sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter (SOR 2025-26 Pg 84 M-0390) (Toilet Door)
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works).
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_769937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
TechnicalBidsinglecoverRenovationofCDPOBuildingatTiruchendurUnionOfficePremises.pdf
Tender Documents • 0.57 MB
BOQ_769937.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid