Tender Value
₹1.5 Cr
EMD Value
₹9.5 L
Closing Date
30 Sept 2026, 12:00 pm
Superintending Engineer
ETAWAH CIRCLE PWD ETAWAH
Construction of Type A 02 Nos And Type B 04 Nos Residential Quarter for Vishesh Abhisuchana Vibhag at District
2026_CEKNP_1187817_1
3632/55C-EC/2026 DATE 30-07-2026
Open Tender
Civil Works - Buildings
Lump-sum
365 days
AURAIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹9.5 L
Yes
SE ETAWAH CIRCLE PWD ETAWAH
19 Sept 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil, backfilling and disposal of surplus excavated soil as directed, within a lead of 50 m | 419 | Cum | 177 | ₹74,163 |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 82 | Cum | 476 | ₹39,032 |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not excluding 8km from the site of work and including watering dressing etc. rate to include cost of all materials, labour and T&P etc.required for proper completion of the work. | 31 | Cum | 1,445 | ₹44,795 |
| 4 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 stone ballast 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. | 63 | Cum | 4,637 | ₹2,92,131 |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4)Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 5 liters/sqm | 215 | Sqm | 211 | ₹45,365 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [Upto Ground Level ](Footing and plinthBeam) | 79 | Cum | 6,158 | ₹4,86,482 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, Columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) [Column] | 40 | Cum | 7,388 | ₹2,95,520 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR LINTEL] | 14 | Cum | 7,832 | ₹1,09,648 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR BEAM ] | 58 | Cum | 7,832 | ₹4,54,256 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR SLAB] | 102 | Cum | 7,832 | ₹7,98,864 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_2237014.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .