Loading…
Loading…
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
2 Sept 2026, 3:00 pm6d left
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of Well with Pump Room and Pipe line, 15 HP motor at Bengorm in Hulical Town Panchayat (SDRF 26-27)
2026_DTP_698038_1
196/2026-RE-2
Open Tender
Civil Works
Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,000
HULICAL TOWN PANCHAYAT
25 Aug 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
25 Aug 2026 - 2 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for open cutting and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 20 | m3 | - | - |
| 2 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 4 | m3 | - | - |
| 3 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 3.5 | m3 | - | - |
| 4 | Random Rubble masonary in cm 1;5 mix using new rough and bond stones metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 4 | m2 | - | - |
| 5Centering charges for RCC work and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | |||||
| 5.01 | a) Below 1 M | 4 | m2 | - | - |
| 5.02 | b) Well sides | 189 | m2 | - | - |
| 6 | Brick work for superstructure in cm 1:5 mix using country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification. | 2.5 | m3 | - | - |
| 7 | Supplying and fixing of steel doors and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 261 | KG | - | - |
| 8 | Supplying and fabrication of steel placing in position and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 1,430 | KG | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
2sdrfbengormwell16lakbid.pdf
Tender Documents • 0.41 MB
BOQ_839110.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].