| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 CrAccepted-AOC PLOT NO 13 THIRD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹14.3 Cr | L1 | Accepted-AOC Lowest bid found in order |
| 2 | L2₹17.6 CrRejected-Finance 20 SC BOSE COLONY GAL NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹17.6 Cr | L2 | Rejected-Finance Other then lowest bid |
| 3 | Rejected-Technical | - | - | Rejected-Technical Considered NOT eligible for opening of Q-bid due to Not meeting eligibility criteria as per NIT |
| 4 | Rejected-Technical 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | - | - | Rejected-Technical Considered NOT eligible for opening of Q-bid due to Not meeting eligibility criteria as per NIT |
Tender Value
Refer Docs
EMD Value
₹11.2 L
Closing Date
22 Oct 2024, 6:00 pmClosed
HQ CE AF Prayagraj
HQ CE AF Prayagraj
PROVN OF SMART METERING SYSTEM UNDER THE AOR OF CE (AF) PRAYAGRAJ
2024_MES_667740_2
958001/E8
Open Tender
Electrical and Maintenance Works
4080 days
Prayagraj
As per NIT and Tender Documents
8 documents required · 8 mandatory
₹3,000
GE (AF) Bamrauli
₹11.2 L
Yes
HQ CE AF Prayagraj
18 Dec 2024
2 Sept 2024
29 Oct 2024
2 Sept 2024
22 Oct 2024
8 Oct 2024
2 Sept 2024 - 9 Sept 2024
10 Sept 2024
Amount
Phase-I
Taking down carefully electric meters of any size, after noting down meter reading, by disconnecting and unscrewing from boards/outlets boxes, electric meters of any size, rating and phase, of any locations and handover and depositing to E & M stores as per building inventory and making good the disturbed surfaces after installation of new meters complete all as specified and as directed.
Supply, installation, testing and commissioning of Smart meter (RF/Cellular /Hybrid (RF+Cellular)) Single Phase AC Meter Tamper Proof, Static Meter of Class 1.0, 240 V, 50 Hz, 10 A-60 A having valid BIS licence of IS-16444-2015 (Reaffirmed 2020) and relevant IEC standards with default and on demand display, billing data generation facility, with prepaid and postpaid facility, anti-tamper features, Microprocessor and LED based circuitry, including integration and maintaining the Advance Metering infrastructure (AMI) of smart meters of different makes having valid BIS certification mark with specific CM/L number (not more than 33% of particular one make) to ensure interchangeability at later date using communication technology including GPRS/RF/Hybrid (RF + cellular) or any other advanced technology as per CEA/TRAI regulation in order to achieve overall economy in operation and maintenance.
Supply, installation, testing and commissioning of Smart meter ( RF / Cellular / Hybrid (RF+Cellular)) Three Phase AC Meter Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A having valid BIS licence of IS-16444-2015 (Reaffirmed 2020) and relevant IEC standards with default and on demand display, billing data generation facility, with prepaid and postpaid facility, anti-tamper features, Microprocessor and LED/LCD based circuitry, including integration and maintaining the Advance Metering infrastructure (AMI) of smart meters of different makes having valid BIS certification mark with specific CM/L number (not more than 33% of particular one make) to ensure interchangeability at later date using communication technology including GPRS/RF/Hybrid (RF + cellular) or any other advanced technology as per CEA/TRAI regulation in order to achieve overall economy in operation and maintenance.
Note for Ser No 2 and 3 Meter Should support sending the following data :- (i) 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software. (ii) Meter should have connect / disconnect functionality operatable from MDM/billing software and prepaid features would be configured in MDM / Billing end as per prevalent IS and applicable tariff plan. (iii) Meter should support communication protocol through RF/(4G/5G/NB IOT) with the software all as required at site and directed (cost of 4G/5G/NB IOT sim, mapping vending portal charges etc deemed to included the unit rate quoted for meter against item No 2 and 3 of BOQ) (iv) Two way communication with DCU/HES (v) Clock Synchronisation facility with HES (Head End System) (vi) In case of RF Communication including different makes of meter shall be such that it should communicate with same DCU directly via Mesh Network. (vii) The contractor shall keep sufficient No of smart meter (Minimum 2% including accessories at each station through out the defect liability and guarantee period of 10 (Ten) Years) in reserve for immediate replacement in case of any faulty meters to ensure zero downtime. (viii) The contractor carryout comprehensive survey and submit his report through respective GE for the communication technologies being proposed for the all areas and shall take an approval from the Department. The decision of the Accepting Officer with respect to the communicaton technology shall be final and binding.
Note for Ser No 2 and 3 Contd . . . (ix) It shall be possible to run the meter in both prepaid and postpaid mode with appropriate MDM/ Billing software configuration. (x) Guarantee of meters shall be 10 yeares from date of completion of phase-1. The amount of security deposit for smart meter guarantee shall be 2.5% of the amount of smart meter at contract rates and shall be retained by the department from contractors dues. The amount shall be released after sucessful expiry of the guarantee period provided always that the contractor shall first have been paid the Final Bill and have rendered "No Demand Certificate (IAFA-451)". The contractor may however, furnish a fixed deposit receipt in lieu, from a scheudle bank pledged in favour of Garrison Engineer (AF ) Bamrauli (Nodal Officer) for the period of Guarantee in which case the amount if any, deducted from the dues/final bill shall be refunded. (xi) The cost of meter shall include DCU/ repeater cost in case of RF communication meters. (xii) The OEM shall need to share the Authentication / Encryption keys of the meters along with relevant protocol details with the department. (xiii) The department would need complete support of the OEM to be able to integrate the meter with any software of the department. (xiv) A training to handle the smart meter to MES tradesmen shall also be given by professionals. (xv) The rate quoted shall also include any other materials which are necessary for smooth functioning of smart prepaid meter system and not mentioned here in this item.
Supply, Configuration and Integration of the Web based AMI Software for single phase 220 Volt and three phase 415 Volt smart prepaid meter with following modules:- (The AMI software and associated infrastructure should be capable of handling atleast 9000 (approx) Nos of meters in the present phase of work of different makes having valid BIS licence with BIS:16444-2015 (Reaffirmed 2020) with expansion capacity upto 15000 Nos of meters (during further phases of smart meters work without any additional infrastructure and cost implication.) :-- (i) Meter Data Management Module :- The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the biling system. The meter data management system would capture and provide the following data :- (a) Data Collection / Headend Module The headend module would be responsible to communicate with the Meter / DCU as the case may be and carry out two way communication as defined in IS-16444-2015 (Reaffirmed 2020). (ii) Meter Data Management Module (a) 15 min instantenous data from all the meters for minimum seven parameters- Cumulative Energy, Power, Current, Voltage, Power Factor and Frequency. (b) Abstract Download for Monthly and quarterly billing survey data for cumulative energy and max demand and tampering features. (iii) Billing Module : Postpaid /Prepaid Billing Module The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required.
Ser No 4 Contd . . . (iv) Occupation and Vacation Module : Provision to enter admin controls for transfers/vacations. MES (GE and BSO ) would have administrator control on the system. The system would support occupation/ vacation based on the unit categories. The system would support automatic data capture on occupation and vacation events. (v) Customer Portal : The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis.
Ser No 4 Contd . . . (vi) Energy Accounting Module :- The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is available with. (vii) Communication Module :- The system would provide communication of energy data and bills via print, email and sms methods. It would allow setting up format from web front end. (viii) Meter Master Data :- The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export :- The system would support export of metering and billing data in excel format. (x) Customer Care Module :- the software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module :- The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (xii) Activities Communication :- The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email.
Ser No 4 Contd . . . (xiii) Software :- (a) The software would be hosted on GCC Server. (b) GE shall provide Public Fund account details and contractor shall be responsible for necessary arrangement Payment Gateway integration (c) The software would be scalable and expandable for meters and system of different make complying with IS :16444-2015 (Reaffirmed 2020). The software would be able to consumer web services of the future projects if required. (d) The software would enable the features of refund calculation in case of quarter vacation. (e) Demonstration of integration of smart meters with software : The software sample approval would be based on integration demontstration by contractor of at least four makes of the meters with different configuration (2 RF at least and 2 cellular at least) with HES and MDM system before placeing final order. (f) The software would support other charges such as water charges, license fee, furniture charges and other allied charges. (g) The software would allow supporting both prepaid and postpaid billing plans. Separate groups can be created for the same. (h) The AMI software and associated infrastructure should be capable of handling atleast 9000 (approx) Nos of meters in the present phase of work of different makes having valid BIS licence with BIS:16444 -2015 (Reaffirmed 2020) with expansion capacity upto 15000 Nos of meters (during further phases of smart meters work) without any additional infrastructure and cost implication. (xiv) Cyber Audit :- Audit of Software for Smart Meters will be done by CERT-India Empanelled firm/CERT Auditor of Armed Forces. The cost of Audit shall be borne by the contractor.
Ser No 4 Contd . . . (xv) Cyber Security :- The following guidelines/strategies shall be taken care of by the AMISP/Contractor for making the entire AMI system including the service provider immune to Cyber Attacks : a) All the hardware, OD and application software shall be hardened. b) Application, scanning and hardware scanning tools shall be provided to identify vulnerability and security threats. c) Data shall be encrypted at system/device/technology level. d) While procuring cyber security items testing must be done and the system must be secure by design. e) Residual information risk shall be calculated by Contractor and same shall be submitted for perusal of Cyber Audit Teams. f) Penetration and vulnerability assesment test from Certified auditors during Field Acceptance Test (FAT) site acceptance test (SAT) and during Operation and Maintenance period.
Supply and fixing All in one Desktop PC with i5 latest generation processor, 16GB RAM, 512 GB SSD Plus 1 TB SSD additional, Windows 11 PC with 19" monitor 1-CD/DVD Combo Drive R/W Type, WIFI, 4 USB port including Video card, Cordless key board & Mouse, licensed Operating system (Windows 11), MS Office License, Licensed Anti Virus / Anti Malware Software with 5 years warranty complete all as specified and directed. Note : Internet connection shall be provided by the department. Make : Dell/Acer/HP/Sony.
Supply and Fixing of laser-jet printer with single function black & white with WiFi connection with printing speed of min 18 pages per minute with resolution 600 x 600 x 2DPI , High speed USB 2.0, 100 sheet out put bin, 150 sheet input tray complete all as secified and directed. Make : HP Model : P1108 or equivalent as directed.
Supply & Fixing UPS for desktop with following specifications complete all as specified and directed by Engr-in-Charge: - (a) Capacity of 600 VA with Output voltage 230V AC +10 % of frequency 50HZ +1%. (b) Minimum 30 mins backup with full battery condition. (c) Output waveform of Pseudo Sine. (d) Off mode battery charging with high voltage protection (e) Battery warranty of at-least 2 years
Supply and install polycarbonate meter box as per IS: 14772 with IP-55, weather proof and temperature proof, fire returdant suitable for single phase smart prepaid meter viewing glass, concealed hinge and earth bolt plugged including cable glands for incoming and outgoing cables and locking arrangement for top cover of the box complete all as specified and as directed by Garrison Engineer.
Supply and install polycarbonate meter box as per IS: 14772 with IP-55, weather proof and temperature proof, fire returdant suitable for Three phase smart prepaid meter viewing glass, concealed hinge and earth bolt plugged including cable glands for incoming and outgoing cables and locking arrangement for top cover of the box complete all as specified and as directed by Garrison Engineer.
Supply and fixing Sub main wiring complete with two runs of 6 Sqmm single core PVC insulated FRLS cable 1100 volts grade, multistranded copper conductor cable with one run of 6 Sqmm single core PVC insulated FRLS cable 1100 volts grade, multistranded copper conductor cable as earth continuity conductor, drawn through in and including new PVC concealed conduit in walls/Floors all as specified and directed by Garrison Engineer.
Supply and fixing Sub main wiring complete with Four runs of 6 Sqmm single core PVC insulated FRLS cable 1100 volts grade,multistranded copper conductor cable with one run of 6 Sqmm single core PVC insulated FRLS cable 1100 volts grade,multistranded copper conductor cable as earth continuity conductor ,drawn through in and including new PVC concealed conduit in walls/Floors all as specified and directed by Garrison Engineer.
Taking down carefully, unserviceable Submain wiring any type/Size.
Taking down carefully, unserviceable MCB DBs / TPN any type/Size.
S&F MCB DB SPN 8 Way double door, IP 43, IK-09, 230 volts AC 50Hz complete all as specified and directed.
S&F MCB DB SPN 12 Way double door ,IP 43,IK-09 ,230 volts AC 50Hz complete all as specified and directed
S&F MCB SPN 230 volts 40 to 63 Amps rating C series complete all as specified
S&F MCB SP 6 to 32 Amps 240 volts 10 KA AC 50Hz C curve complete all as specified
S&F MCB FP ,415 volts ,40 to 100 amps rating C series suitable to fix in TPN DB all as directed by Engr-in-charge
S&F MCB TP ,415 volts ,40 to 100 amps rating C series suitable to fix in TP DB all as directed by Engr-in-charge
S&F MCB TPN ,415 volts, 32 amps rating C series suitable to fix in TP DB all as directed by Engr-in-charge
S&F factory made Powder coated Distribution Box (MCB DB) TPN 4 Way E type IP-43 Protection made made out of 1.6mm thick CRCA sheet ,fabricated ,metal double door fixed to wall and suitable for universal mounting and including 200 amps rated copper bus bar ,neutral bar,standard DIN rail ,earth bar and cables ties for cable managment ,top and bottom removable glands plated withn knockouts and suitable for TPN MCB 63 Amps as incommer all as specified and directed.
S&F factory made Powder coated Distribution Box (MCB DB) TPN 6 Way E type IP-43 Protection made made out of 1.6mm thick CRCA sheet ,fabricated ,metal double door fixed to wall and suitable for universal mounting and including 200 amps rated copper bus bar ,neutral bar,standard DIN rail ,earth bar and cables ties for cable managment ,top and bottom removable glands plated withn knockouts and suitable for TPN MCB 63 Amps as incommer all as specified and directed
Supply, install, testing & commissioning of indoor type, wall mounted (with anchor bolts & nuts) compartmentalized type Meter Cabinet for provision and fixing arrangements of 4 nos. energy meters of overall dimension 1200mm (Width) x 750mm (Height) x 200mm (Depth) made out of 2.0 mm thick CRCA Sheet with front door having cut out duly covered with transparent polycarbonate / glass panel for viewing KWh meter / Timer and other door shall be opaque. All doors should have gasket and locking arrangement to meet ingress protection level IP-43. The cabinet shall be painted both internally and externally with powder coated paint (RAL 7032 : SIEMENS GREY) after necessary surface treatment. The cabinet shall be fabricated as per the drawing and comprising of following accessories :- a) Four pole MCCB, 63 Amps with breaking capacity 16 KA having fixed thermal and fixed magnetic release and spreader link at both incoming and outgoing side.- 01 No. b) Copper Bus Bar of size 25mm x 3mm duly mounted on FRP insulators and necessary drilling for 1 incoming & minimum 6 outgoing connections and duly covered with heat shrinkable PVC sleeves of standard colour code - 4 Nos. c) MCB SPN 32 Amps, 10 KA - 4 Nos ( To be connected with 4 Nos Meters) d) MCB SP 06 Amps, 10 KA -2 No ( For common lighting & Bldg Security Lights) e) Analog time switch 16 Amp-01 No f) LED indicating Lamps, 22mm with 3 Amps SP MCB-03 Nos. g) 3 Way Bakelite strip type cable connector 30 Amps rating - 06 Nos h) Dial type DIN rail mounting, Analog Time Switch 16 Amps / 230 Volts AC 50Hz, with battery back up, 24 Hrs programmable type with 1 NO & 1 NC output contact.- 01 No. (for security light). j) Internal wiring with 1100V grade FRLS PVC insulated multi flexible copper wire of sizes duly crimped with copper lugs of suitable size & type all as mentioned below :- i) MCCB to Bus Bar - 10.0 Sqmm copper ii) Bus Bar to Cable Connector via KWh meter and MCB - 6.0 Sqmm iii) Bus Bar to LED Lamp via MCB - 1.5 Sqmm
Phase -II
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling for two years after completion of Phase - I. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Phase-III
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for First Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Second Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Third Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Fourth Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Fifth Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Sixth Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Seventh Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Comprehensive operation of AMI System (Smart Meters system installed, configured, integrated with softwares and commissioned in Phase-I) and making the system functional at all time by providing a well trained team of staffs at each GE location seperately (ref Schedule A Note No 8 for bifurcation of Area /Locality/ GE) and management all expenditure including periodic charges of telecom operator, GCC hosting charges & charges of audit of smart meteres and AMI system by CERT-IN empaneled firm/CERT Auditor of Armed forces as per Govt policies for smart meter biling, for Eight Year after completion of Phase - II. Penalty for non rectifying / replacing of meter within a day / non working of AMI system will be levied on contractor @ Rs 100 per meter per day till rectification / replacement of meter / AMI system and same shall be recovered from contractors due. Note : Charges shall also be inclusive of following in scope of this item :-- (a) Software AMC: This would include necessary up-gradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. (b) Recurring sim charges for DCU and Meter as required (c) Ensuring adequate database backup, up-gradations in the operating system, anti-virus updates, data base upgrade etc. (d) Reports development: The additional reports as needed for the success of the project would be developed. (e) Software hosting on GCC. Software + B2B installation on any alternate standby server in case of breakdown of GCC server. (f) The communication network monitoring and support. (g) Configuration of the repaired/ replaced hardware (meter/dcu/repeater) in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required. (k) During this period any defective work including defective meters noticed shall be rectified/ replaced free of cost by the contractor (Being Defect Liability period of 2 (two) Years of Phase -I). (l) Any additional meters added and configured in the system during these period shall also be run by the contractor under this item without any extra cost to department. (m) One customer care executive for each Station shall be available from 9.00 AM to 5.00 PM on all days including sunday and holiday. The activities of executive shall include following :- (a) Support to BSO for billing, occupation / vacation, payment entry etc. (b) Resolution of customer queries and Trouble shooting (c) Liaison with remote support team, users and administrators as a back end support for AMI system. (d) Registering and management of Complaint received from all users and administrators.
Deduct Schedule of Credit of Rs. 1,77,920.00 as brought out from Sr Page No. 47 of tender
M K ENGINEERS CO. (BID ID -3139950)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB