| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC E 78 VRUNDAVAN COTTAGE INDUSTRIAL PARK NR RAMOL TOLL PLAZA RAMOL ROAD RAMOL AHMEDABAD GUJARAT 382449 UDYAM GJ 01 0094364 24EAMPM2395J1Z8 R M | AHMADABAD | GUJARAT | 382449 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | R S ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Strengthening the headgear structure as per the structure stability test report recommendations to comply with DGMS violations through fabrication work using different sizes of MS material for safe and smooth winding operations at Pit No. 1, Pit No. 5, and Pit No. 9 under Madhaipur Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||
| 1.01 | PIT No 1
Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis (required 6 mm plate=
8 m²) ( weight= 8 m² x @53.27 kg/m²= 426.16)( Material Cost) | 426.16 | Kgs | 175 ₹74,578 Lowest |
| 1.02 | PIT No 1
Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis( Labour Cost) | 42 | Semi-Skilled Manshift | 200 ₹8,400 Lowest |
| 1.03 | PIT No 1
Fabrication and fitting of ISA 75x75x6mm to existing ISA 75x75x6mm into Head Gear Structire to make 'T' shape as per structure stability analysis.(required ISA 75x75x6mm= 176
m) ( weight= 176 m x @6.8
kg/m= 1196.8 )( Material Cost) | 1,196.8 | Kgs | 175 ₹2,09,440 Lowest |
| 1.04 | PIT No 1
Fabrication and fitting of ISA 75x75x6mm to existing ISA 75x75x6mm into Head Gear Structire to make 'T' shape as per structure stability analysis.( Labour Cost) | 48 | Semi-Skilled Manshift | 200 ₹9,600 Lowest |
| 1.05 | Pit No. 5
Fabrication and fitting of 6 mm thick plate to existing ISMC 150 into Head gear structure to make it tube and hollow section as per structure stability analysis. (required 6 mm plate=
8 m²) ( weight= 5.2 m² x @53.27 kg/m²= 277)( Material Cost) | 277 | Kgs | 175 ₹48,475 Lowest |
| 1.06 | Pit No. 5
Fabrication and fitting of 6 mm thick plate to existing ISMC 150 into Head gear structure to make it tube and hollow section as per structure stability analysis.( Labour Cost) | 32 | Semi-Skilled Manshift | 200 ₹6,400 Lowest |
| 1.07 | Pit No. 5
Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis. (required 6 mm plate=
14 m²) ( weight= 14 m² x @53.27 kg/m²=745.78),( Material Cost) | 745.78 | Kgs | 175 ₹1,30,511.5 Lowest |
| 1.08 | Pit No. 5
Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis.( Labour Cost) | 50 | Semi-Skilled Manshift | 200 ₹10,000 Lowest |
| 1.09 | Pit No. 9
Fabrication and fitting of ISA 75x75x6mm to existing ISA
75x75x6mm into Head Gear Structire to make 'T' shape as
per structure stability analysis (required ISA 75x75x6mm= 176
m) ( weight= 50 m x @6.8 kg/m= 340 ),( Material Cost) | 340 | Kgs | 175 ₹59,500 Lowest |
Tender Value
₹16.5 L
EMD Value
₹20,700
Closing Date
12 Jul 2025, 5:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Strengthening headgear structures at Pit No. 1, 5 and 9 under Madhaipur Colliery as per stability test report to comply with DGMS norms, via fabrication using various MS materials for safe and smooth winding operations, Pandaveswar Area
2025_ECL_338563_1
GM-PND/EandM/25-26/68/303 dated 26/06/2025
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Madhaipur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,700
13 Aug 2025
28 Jun 2025
14 Jul 2025
28 Jun 2025
12 Jul 2025
28 Jun 2025
28 Jun 2025 - 1 Jul 2025
Amount
Strengthening the headgear structure as per the structure stability test report recommendations to comply with DGMS violations through fabrication work using different sizes of MS material for safe and smooth winding operations at Pit No. 1, Pit No. 5, and Pit No. 9 under Madhaipur Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
PIT No 1 Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis (required 6 mm plate= 8 m²) ( weight= 8 m² x @53.27 kg/m²= 426.16)( Material Cost)
PIT No 1 Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis( Labour Cost)
PIT No 1 Fabrication and fitting of ISA 75x75x6mm to existing ISA 75x75x6mm into Head Gear Structire to make 'T' shape as per structure stability analysis.(required ISA 75x75x6mm= 176 m) ( weight= 176 m x @6.8 kg/m= 1196.8 )( Material Cost)
PIT No 1 Fabrication and fitting of ISA 75x75x6mm to existing ISA 75x75x6mm into Head Gear Structire to make 'T' shape as per structure stability analysis.( Labour Cost)
Pit No. 5 Fabrication and fitting of 6 mm thick plate to existing ISMC 150 into Head gear structure to make it tube and hollow section as per structure stability analysis. (required 6 mm plate= 8 m²) ( weight= 5.2 m² x @53.27 kg/m²= 277)( Material Cost)
Pit No. 5 Fabrication and fitting of 6 mm thick plate to existing ISMC 150 into Head gear structure to make it tube and hollow section as per structure stability analysis.( Labour Cost)
Pit No. 5 Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis. (required 6 mm plate= 14 m²) ( weight= 14 m² x @53.27 kg/m²=745.78),( Material Cost)
Pit No. 5 Fabrication and fitting of 6 mm thick plate to existing ISMC 200 into Head gear structure to make it tube and hollow section as per structure stability analysis.( Labour Cost)
Pit No. 9 Fabrication and fitting of ISA 75x75x6mm to existing ISA 75x75x6mm into Head Gear Structire to make 'T' shape as per structure stability analysis (required ISA 75x75x6mm= 176 m) ( weight= 50 m x @6.8 kg/m= 340 ),( Material Cost)
Pit No. 9 Fabrication and fitting of ISA 75x75x6mm to existing ISA 75x75x6mm into Head Gear Structire to make 'T' shape as per structure stability analysis( Labour Cost)
Pit No. 9 Fabrication and fitting of 8 mm thick plate to existing ISMB 200 into Head gear structure(Double side Plate fitting because of beam) as per structure stability analysis (required 8 mm plate= 6 m²) ( weight= 8 m² x @53.27 kg/m²=745.78),( Material Cost)
Pit No. 9 Fabrication and fitting of 8 mm thick plate to existing ISMB 200 into Head gear structure(Double side Plate fitting because of beam) as per structure stability analysis( Labour Cost)
DA Cylinder
Oxygen Cylinder
Skilled Labour
Welding Electrode Ferrospeed
Welder(Skilled Rate)
Welder Helper along with welder for safety and Handling of Cylinders from ground
Skilled Fitter for measurement and design of MS plate and MS angle of different size
Contingency material @15% considering the way stage factor
Transportation cost
Structural stability test of head gear structure from NABL certified firm and test report for all three Pits (To Arrange satisfactory Compliance Report from DGMS)
Profit @10%
CMPF @12.72% (On Labour Cost)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .