PR & CC
The NIT is towards PILE FOUNDATION FOR 4x180 KL UG tanks for Hexane product at Visakh New
20000282-HD-11770
20000282-HD-11770
Open Tender
Two Bid
Saraikela Kharsawan, Jharkhand
₹0
Exempted
25 Mar 2021
4 Mar 2021
25 Mar 2021
25 Mar 2021
4 Mar 2021 - 16 Mar 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCAVATION OF EARTH | EXCAVATION OF EARTH — EXCAVATION FOR DEPTHS UP TO AND INCLUDING 1.5 M: STAKING OUT, MARKING THE OUTLINE FOR EXCAVATION, EXCAVATION IN ANY TYPE OF SOIL INCLUDING SOFT ROCK (EXCEPT HARD ROCK) FOR GENERAL SITE GRADING AND UG TANK FOUNDATIONS ETC. EITHER BY MACHINERY OR MANUALLY UP TO VARIOUS DEPTHS BELOW NGL INCLUDING REMOVAL OF STUMPS AND ROOTS TO FULL EXTENT, REMOVAL OF ALL VEGETATION INCLUDING BUSHES AND GRASS, DEWATERING, TAKING SPOT LEVELS AT 5 M C/C IN GRID PATTERN, LEVELING, DRESSING AND ROLLING THE EXCAVATED SURFACE, BACKFILLING IN LAYERS OF 300 MM, LOADING, TRANSPORTATION OF SURPLUS EARTH TO AN UNOBJECTIONABLE PLACE INSIDE THE SITE PREMISES, SPREADING, LEVELING, COMPACTION ETC AS PER INSTRUCTIONS OF THE ENGINEER IN CHARGE. THE JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATIONS, JOB PROCEDURES ETC COMPLETE AND AS DIRECTED BY ENGINEER-IN-CHARGE. (NOTE: THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SLOPE, STEPS ETC., REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES AND WORKING SPACE ETC). | - | Cubic Meters |
| 2 | EXCAVATION OF EARTH | EXCAVATION OF EARTH — EXCAVATION FOR DEPTHS ABOVE 1.5 M AND UP TO 3.0 M: STAKING OUT, MARKING THE OUTLINE FOR EXCAVATION, EXCAVATION IN ANY TYPE OF SOIL INCLUDING SOFT ROCK (EXCEPT HARD ROCK) FOR GENERAL SITE GRADING AND UG TANK FOUNDATIONS ETC. EITHER BY MACHINERY OR MANUALLY UP TO VARIOUS DEPTHS BELOW NGL INCLUDING REMOVAL OF STUMPS AND ROOTS TO FULL EXTENT, REMOVAL OF ALL VEGETATION INCLUDING BUSHES AND GRASS, DEWATERING, TAKING SPOT LEVELS AT 5 M C/C IN GRID PATTERN, LEVELING, DRESSING AND ROLLING THE EXCAVATED SURFACE, BACKFILLING IN LAYERS OF 300 MM, LOADING, TRANSPORTATION OF SURPLUS EARTH TO AN UNOBJECTIONABLE PLACE INSIDE THE SITE PREMISES, SPREADING, LEVELING, COMPACTION ETC AS PER INSTRUCTIONS OF THE ENGINEER IN CHARGE. THE JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATIONS, JOB PROCEDURES ETC COMPLETE AND AS DIRECTED BY ENGINEER-IN-CHARGE. (NOTE: THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SLOPE, STEPS ETC., REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES AND WORKING SPACE ETC). | - | Cubic Meters |
| 3 | EXCAVATION OF EARTH | EXCAVATION OF EARTH — EXCAVATION FOR DEPTHS ABOVE 3.0 M AND UP TO 7.0 M: STAKING OUT, MARKING THE OUTLINE FOR EXCAVATION, EXCAVATION IN ANY TYPE OF SOIL INCLUDING SOFT ROCK (EXCEPT HARD ROCK) FOR GENERAL SITE GRADING AND UG TANK FOUNDATIONS ETC. EITHER BY MACHINERY OR MANUALLY UP TO VARIOUS DEPTHS BELOW NGL INCLUDING REMOVAL OF STUMPS AND ROOTS TO FULL EXTENT, REMOVAL OF ALL VEGETATION INCLUDING BUSHES AND GRASS, DEWATERING, TAKING SPOT LEVELS AT 5 M C/C IN GRID PATTERN, LEVELING, DRESSING AND ROLLING THE EXCAVATED SURFACE, BACKFILLING IN LAYERS OF 300 MM, LOADING, TRANSPORTATION OF SURPLUS EARTH TO AN UNOBJECTIONABLE PLACE INSIDE THE SITE PREMISES, SPREADING, LEVELING, COMPACTION ETC AS PER INSTRUCTIONS OF THE ENGINEER IN CHARGE. THE JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATIONS, JOB PROCEDURES ETC COMPLETE AND AS DIRECTED BY ENGINEER-IN-CHARGE. (NOTE: THE CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS RATE, THE PROVISION FOR EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, SLOPE, STEPS ETC., REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES AND WORKING SPACE ETC). | - | Cubic Meters |
| 4 | SPLY&FIXG OF | SPLY&FIXG OF — SHORING AND STRUTTING: DESIGN, PROVIDING, FIXING AND MAINTAINING NECESSARY SHEATHING, SHORING AND BRACING ETC., IN STEEL OR WOOD, AS MAY BE REQUIRED TO SUPPORT THE SIDES OF THE EXCAVATION, TO PROTECT WORKMEN IN THE TRENCH AND TO PREVENT ANY TRENCH MOVEMENT WHICH MIGHT ANY WAY INJURE OR DELAY THE WORK, CHANGE THE REQUIRED WIDTH OF THE TRENCH, MAKE UNSAFE CONDITION FOR ADJACENT PAVEMENTS, UTILITIES, BUILDINGS OR OTHER STRUCTURES ABOVE OR BELOW GROUND. SHEATHING, SHORING AND BRACING SHALL BE WITHDRAWN AND REMOVED AS THE BACKFILLING IS BEING DONE, EXCEPT WHEN THE ENGINEER MAY AGREE THAT SUCH SHEATHING, SHORING AND BRACING BE LEFT IN PLACE, AT THE CONTRACTOR'S REQUEST. NO PAYMENT TOWARDS MATERIAL COST WOULD BE PAID BY HPCL. IN ANY CASE, THE CONTRACTOR SHALL CUT OFF ANY SUCH SHEATHING AT LEAST 600 MM BELOW THE SURFACE AND SHALL REMOVE THE CUT OFF MATERIAL FROM THE TRENCH. ALL SHEATHING, SHORING AND BRACING WHICH IS LEFT IN PLACE UNDER THE FOREGOING PROVISIONS SHALL BE REMOVED IN A MANNER SO AS TO NOT ENDANGER THE COMPLETED WORK OR OTHER STRUCTURES, UTILITIES OR PROPERTY, WHETHER PUBLIC OR PRIVATE. THE JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATIONS, JOB PROCEDURES ETC COMPLETE AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Square Meters |
| 5 | SPLY AND LAYG OF RUBBLE | SPLY AND LAYG OF RUBBLE — RUBBLE SOLING: PROVIDING AND LAYING 230 MM THICKNESS LAYERS OF SPECIFIED THICKNESS DRY TRAP RUBBLE STONE (63/80/110 MM GRADED) SOLING INCLUDING HAND PACKING, FILLING THE INTERSTICES WITH CHIPS, SPALLS AND BINDING WITH GRIT AND SELECTED MURRUM, WATERING, COMPACTION BY HAND RAMMING AND ROLLING WITH 1 MT HAND ROLLER ETC AND JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION/CODAL PROVISIONS/SOUND ENGINEERING PRACTICES AND AS DIRECTED BY ENGINEER-IN-CHARGE COMPLETE. | - | Cubic Meters |
| 6 | SPLY AND FILLING OF SAND | SPLY AND FILLING OF SAND — SAND FILLING: SUPPLY AND FILLING BEST QUALITY RIVER SAND/MACHINE SAND CONFORMING TO IS:383 GRADE-III UNDER UG TANKS FOUNDATIONS OR AS DIRECTED BY HPCL OIC, ARRANGED FROM BORROW AREA/PIT OUTSIDE PREMISES INCLUDING ALL EXCAVATION, TRANSPORTATION, LABOR ETC. AT THE BORROW PIT LOCATION, FILLING IN HPCL PREMISES IN LOOSE LAYERS NOT EXCEEDING 300 MM AND COMPACTING WITH HAND/MACHINE TOOLS TO ACHIEVE SATISFACTORY COMPACTION INCLUDING DRESSING UP THE SURFACE, BREAKING CLODS, REMOVAL OF SLUSH AND WATER, REMOVAL OF SURPLUS EARTH AFTER FORMATION, WATERING AND RE-HANDLING AT SITE. THE INITIAL FILLING SHOULD START ONLY AFTER STRIPPING THE AREA FROM BUSHES, GRASS AND OTHER VEGETATION. NO SEPARATE PAYMENT WILL BE MADE FOR CLEARING BUSHES, VEGETATION AND OTHER MATERIALS. THE MEASUREMENT FOR PAYMENT SHALL BE FOR THEORETICAL VOLUME ONLY BASED ON INITIAL AND FINAL LEVELS JOINTLY RECORDED. | - | Cubic Meters |
| 7 | SPLY AND LAYG OF PCC | SPLY AND LAYG OF PCC — PLAIN CEMENT CONCRETE 1:2:4: PROVIDING AND LAYING PLAIN CEMENT CONCRETE OF NOMINAL VOLUMETRIC MIX 1:2:4 (1 CEMENT; 2 SAND: 4 CRUSHED STONE AGGREGATES) WITH 20 MM AND DOWN SIZE GRADED AGGREGATES FOR BED BLOCK FOR FOUNDATIONS AND ANY OTHER WORK AS PER HPCL REQUIREMENT INCLUDING ANY REQUIRED SHUTTERING, MACHINE MIXING, TAMPING, RAMMING, CURING, ETC. ALL COMPLETE AS PER SPECIFICATIONS, DRAWINGS, JOB PROCEDURES ETC. AND INSTRUCTIONS OF HPCL ENGINEER-IN-CHARGE. SAND SHALL BE NATURAL RIVER SAND OR CRUSHED STONE SAND OR MACHINE MADE SAND MEETING THE REQUIREMENTS OF TECHNICAL SPECIFICATIONS OF THE TENDER. | - | Cubic Meters |
| 8 | SPLY AND CASTING OF RCC | SPLY AND CASTING OF RCC — AS PER DETAILED SCOPE OF JOB ATTACHED. | - | Cubic Meters |
| 9 | DISMANTLING OF RCC WORK | DISMANTLING OF RCC WORK — DISMANTLING OF REINFORCED CEMENT CONCRETE: DISMANTLING OF RCC WORK FOR BACK CHIPPING OF PILES AND FOR OTHER CONCRETE OF ANY GRADE TO A DEPTH SUITABLE TO SITE CONDITIONS/AS ADVISED BY ENGINEER-IN-CHARGE, BELOW THE SURFACE AT THE MARKED LOCATION, WITH CHISELING/PNEUMATIC HAMMER IN SLABS, BEAMS, INCLUDING DISPOSING OFF CONCRETE LUMPS AND DEBRIS OUTSIDE THE PREMISES. VENDOR WILL BE PERMITTED TO USE PNEUMATIC TOOLS AND ALL APPLICABLE TACKLES. BLASTING WILL NOT BE PERMITTED. PROVIDING DIESEL OPERATED AIR COMPRESSOR ALONG WITH ALL THE CONSUMABLES OPERATORS WILL BE IN CONTACTORS SCOPE. WHILE BREAKING THE CONCRETE, CONTRACTOR TO ENSURE THAT THERE IS NO DAMAGE TO THE SURROUNDING EQUIPMENT. JOINT MEASUREMENT OF THE BLOCK OR STRUCTURE TO BE TAKEN PRIOR TO DISMANTLING. JOB INCLUDES EXCAVATION TO EXPOSE THE CONCRETE (WHICH WILL BE PAID SEPARATELY), BREAKING THE RCC INTO SMALL PIECES AND DEBRIS/SOILS AND OTHER DISMANTLED/EXCAVATED MATERIALS TO BE LOADED AND TRANSPORTED FROM WORK AREA ON A REGULAR BASIS AND UNLOADED/STACKED AT A DESIGNATED/UNOBJECTIONABLE AREA WITHIN PLANT PREMISES, AS ADVISED BY HPCL OIC. CHIPPING OF CONCRETE OF CAST-IN-SITU PILES ALREADY CAST TO THE CORRECT LINES AND LEVELS FROM THE TOP OF THE PILES TO THE CUT-OFF LEVEL AS INDICATED IN THE APPROVED DESIGN DRAWINGS AND EXPOSING THE REINFORCING RODS AND DISPOSAL OF THE DEBRIS TO AN UNOBJECTIONABLE PLACE INSIDE THE TERMINAL PREMISES IS COVERED UNDER THIS ITEM. THE ITEM INCLUDES NECESSARY LABOR, SCAFFOLDING (IF REQUIRED), ALL TOOLS AND TACKLES TO REMOVE THE SAME AS REQUIRED AT SITE ALL COMPLETE. THE EXPOSED AND RETRIEVED STEEL BARS SHALL BE CUT TO LENGTH OF 2-4 M AND HANDED OVER UNDER ACKNOWLEDGMENT TO HPCL AND STACKED AT DESIGNATED DUMPING AREA WITHIN PLANT PREMISES. | - | Cubic Meters |
| 10 | SOCKETING OF PILE | SOCKETING OF PILE — SOCKETING OF PILE: SOCKETING OF BORED CAST IN SITU PILES OF M-30 GRADE INTO THE ROCK AS PER DESIGN (UP TO 3-D) INCLUDING ALL NECESSARY TOOLS, TACKLES AND LABOR. JOB SHALL BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATIONS/PROVISIONS OF RELEVANT IS OR OTHER CODES/SOUND ENGINEERING PRACTICES AND AS ADVISED BY HPCL ENGINEER-IN-CHARGE COMPLETE. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000282-HD-11770.pdf
TENDER_DOCUMENT • 37.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .