| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-Finance | ₹14.4 L | L1 | Accepted-Finance OK |
| 2 | L2₹15.9 LAccepted-Finance | ₹15.9 L | L2 | Accepted-Finance OK |
| 3 | L3₹19.1 LAccepted-Finance | ₹19.1 L | L3 | Accepted-Finance OK |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Vivek Electricals L3 | M/S RAJ ASSOCIATES L1 | C B S ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00fo|qr uxjh; forj.k [k.M&cqyUn'kgj ds vUrxZr iw.kZ tek ;kstuk en esa lM+d pkSM+hdj.k ,oa lqn`<hdj.k esa ck/kd fofHkUu 33@11 ds0oh0 fo|qr midsUnzksa ds dk;Z{ks= esa 33 dsoh] 11 dsoh ,oa ,y0Vh0 fo|qr ykbZuksa o iksyks dks LFkkukUrfjr djus dk dk;ZA | ||||||
| 2.00Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. | ||||||
| 3.00 | S.T Pole 11 Mtr. Long | 78 | Nos. | 605 ₹47,190 | 600 ₹46,800 | 600 ₹46,800 |
| 4.00 | S.T Pole 9 Mtr. Long | 9 | Nos. | 304 ₹2,736 | 300 ₹2,700 | 302 ₹2,718 |
| 5.00 | Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Rabit conductor, Dog conductor, ABC, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Pin Insulator. Disc Insulator, 33kv & 11kv X Arme etc. | 240 | Qtl. | 304 ₹72,960 | 300 ₹72,000 | 302 ₹72,480 |
| 6.00 | Erection of Single pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 69 | Nos. | 2,499 ₹1.7 L | 3,000 ₹2.1 L | 2,505 ₹1.7 L |
| 7.00 | Erection of Double pole/Section Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 7 | Nos. | 6,015 ₹42,105 | 6,000 ₹42,000 | 6,010 ₹42,070 |
| 8.00 | Erection of Four pole/Section Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 1 | Nos. | 10,050 ₹10,050 | 10,000 ₹10,000 | 10,020 ₹10,020 |
| 9.00 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 69 | Nos. | 610 ₹42,090 | 600 ₹41,400 | 605 ₹41,745 |
| 10.00 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 7 | Nos. | 1,399 ₹9,793 | 1,400 ₹9,800 | 1,407 ₹9,849 |
Updated dates
Tender Value
₹14.4 L
EMD Value
₹14,350
Closing Date
24 Apr 2026, 1:00 pmClosed
SE EDC-I BSR
SE EDC-I HYDEL COLONY BULANDSHAHR
Work of shifting 33 KV, 11 KV and LT electric lines and poles in road widening under full Deposit Scheme.
2026_PVVNL_1135585_1
T-87/EDC-I/B/2025-26
Open Tender
Electrical Works
90 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹3,540
SE EDC-I
₹14,350
5 May 2026
11 Apr 2026
24 Apr 2026
11 Apr 2026
24 Apr 2026
11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | fo|qr uxjh; forj.k [k.M&cqyUn'kgj ds vUrxZr iw.kZ tek ;kstuk en esa lM+d pkSM+hdj.k ,oa lqn`<hdj.k esa ck/kd fofHkUu 33@11 ds0oh0 fo|qr midsUnzksa ds dk;Z{ks= esa 33 dsoh] 11 dsoh ,oa ,y0Vh0 fo|qr ykbZuksa o iksyks dks LFkkukUrfjr djus dk dk;ZA | - | - | - | - |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. | - | - | - | - |
| 3 | S.T Pole 11 Mtr. Long | 78 | Nos. | - | - |
| 4 | S.T Pole 9 Mtr. Long | 9 | Nos. | - | - |
| 5 | Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Rabit conductor, Dog conductor, ABC, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Pin Insulator. Disc Insulator, 33kv & 11kv X Arme etc. | 240 | Qtl. | - | - |
| 6 | Erection of Single pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 69 | Nos. | - | - |
| 7 | Erection of Double pole/Section Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 7 | Nos. | - | - |
| 8 | Erection of Four pole/Section Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 1 | Nos. | - | - |
| 9 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 69 | Nos. | - | - |
| 10 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. | 7 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
T87PDF.pdf
Tender Documents • 1.18 MB
BOQ_2120260.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid