| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹37.7 CrAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹39.4 Cr+₹1.8 Cr (4.65%)Rejected-Finance | l2 | Rejected-Finance l2 | |
| 3 | l3₹39.6 Cr+₹1.9 Cr (5.10%)Rejected-Finance | l3 | Rejected-Finance l3 | |
| 4 | l4₹40.8 Cr+₹3.1 Cr (8.32%)Rejected-Finance | l4 | Rejected-Finance l4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
₹52.3 Cr
EMD Value
₹62.3 L
Closing Date
27 Jan 2024, 10:30 amClosed
EE Hamirpur
Executive Engineer HPPWD Hamirpur
SH Civil works including WS SI and rain water harvesting tank
2024_PWD_83930_1
C/O Indoor Multipurpose Sports Kharidi
Open Tender
Civil Works - Buildings
Percentage
547 days
Hamirpur
Please refer Tender documents.
14 documents required · 14 mandatory
₹5,000
₹62.3 L
11 Mar 2024
12 Jan 2024
27 Jan 2024
12 Jan 2024
27 Jan 2024
12 Jan 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and as directed by the Engineer -in-Charge at site and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) for the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour (if required) including entire carriage of material with in all leads and lifts and as per drawings and technical specifications and the direction of Engineer-in-Charge including other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic metre | 222.9 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etcetera in layers not exceeding 20cm (Twenty centimetre) in depth, consolidating each deposited layer by ramming and watering, upto all leads and lifts including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per cubic metre | 180.5 | ₹180.32 |
| 3 | Disposal of excavated soil including building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge for all leads including all lifts involved as per direction of Engineer in Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per cubic metre | 376.6 | ₹376.22 |
| 4 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto all leads and lift also including ramming and watering of the earth in layers not exceeding 20 cm (Twenty centimetre) in trenches, plinth, sides of foundation etcetra complete including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per cubic metre | 371.85 | - |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 2,065.65 | - |
| 6 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm (fifteen centimetre) deep and disposal of rubbish upto all leads and lifts including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per square metre | 20.3 | - |
| 7Felling trees of the girth (measured at a height of 1 m ( one metre) above ground level including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | |||||
| 7.01 | Beyond 30 cm ( thirty centimetre) girth upto and including 60 cm ( sixty centimetre) girth | - | Each | 318.95 | - |
| 7.02 | Beyond 60 cm ( sixty centimetre) girth upto and including 120 cm ( one hundred twenty centimetre) girth | - | Each | 1,415.95 | - |
| 7.03 | Beyond 120 cm ( one hundred twenty centimetre) girth upto and including 240 cm ( two hundred forty centimetre) girth | - | Each | 6,558.15 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_124653.xls
BOQ • 0.79 MB
137158527.pdf
Tender Documents • 0.56 MB
137158529.html
Tender Documents • 0.03 MB
Indoor.pdf
Tender Documents • 7.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .