| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.6 LAdmitted-Finance PLOT NO D 2 COAL DEPOT FOSBERY ROAD SEWRI E MUMBAI 400 015 | MUMBAI | MUMBAI | MAHARASHTRA | 400015 | L1 | Admitted-Finance | |
| 2 | L2₹45.6 L+₹2.0 L (4.53%)Admitted-Finance SHOP NO 12 KHOPKAR APARTMENT KUMBHARAWADA URAN DISTT RAIGAD 400 702 | URAN | RAIGAD | MAHARASHTRA | 400702 | L2 | Admitted-Finance | |
| 3 | L3₹47.5 L+₹3.9 L (8.97%)Admitted-Finance SHOP NO 106 1ST FLOOR ASHOKA SHOPPING CENTRE LT ROAD MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | L3 | Admitted-Finance | |
| 4 | L4₹47.9 L+₹4.3 L (9.92%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹49.1 L+₹5.5 L (12.6%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENJOY L2 | DARSHAN CONSTRUCTION Co. L5 | pk Enterprises L3 | somnath engineering corporation L7 | BRITE INDUSTRIES L4 | K A ELECTRIC CO L1 | BALAJI TRADERS L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for making operational of screw compressors chiller unit Make Blue star/Voltas complete all as per manufacturer's instruction by authorised dealers /workshop for improved performance and designed parameter including the following complete all as specified and as directed by Engr-in-charge.
(i) Replacement of compressor oil by authorised company person.
(i) Replacement of defective sensors,(Temperature & Pressure sensors), loading coils, MCS keypad including testing of the compressor and finding the faulty parts and replacement of the parts of the compressor and make it operational to the satisfication of the Engr-in-charge.
(ii) Complete testing of each part of AC plant cleaning each part of unit carrying out preventive work like oiling, greasing, replacing defective parts with vaccum test and pressure test at specified pressure to detect leak and again same tests after leak repair to ensure leakage in the complete system.
Note: (a) New spare parts of compressors as required shall be measured and paid seperately as supply only and cost of labour and T&P shall be deemed to include in the quoted rate of this item.
(b) Unit rate quoted shall include for the necessary electrical check i.e checking of panel wiring to run the compressor smoothly and transporting to authorised workshop.
(c) Before opening of compressor the freon gas to be taken in empty cylinder by the help ice or as directed by Engr-in-charge.
(d) Unit rate quoted shall also be included for testing the whole system for any leakage using nitrogen gas by vaccumising the system and filling the system with pressurise nitrogen to test the leakage including nitrogen gas as required and top up repaired compressor and whole system with refrigerant gas R-134 and compressor oil after confirmation of no leakage.
(e) Unit rate quoted shall also be inclusive of charging of compressor oil and refrigerant of sufficient quantity or as directed by Engr-in-charge.
(f) Items required for smooth functioning of unit other than the item mentioned in the schedule is included in the quoted rate of the item.
(g) Gas R-134 and compressor oil will be supplied by the department. | 4 | Each Job | 48,000 ₹1,92,000 | 49,663 ₹1,98,652 | 48,500 ₹1,94,000 | 52,286 ₹2,09,144 | 47,551 ₹1,90,204 Lowest | 58,550 ₹2,34,200 | 51,200 ₹2,04,800 |
| 2.00Supply only following parts of Screw compressor complete all as specified and as directed by Engr-in-Charge. | ||||||||||
| 3.00 | Screw surface grinding | 4 | Each | 12,000 ₹48,000 | 11,337 ₹45,348 | 10,333 ₹41,332 | 14,557 ₹58,228 | 9,773 ₹39,092 Lowest | 12,657 ₹50,628 | 12,000 ₹48,000 |
| 4.00 | Chemical for compressor cleaning | 4 | Each Job | 9,000 ₹36,000 | 9,733 ₹38,932 | 9,513 ₹38,052 | 9,913 ₹39,652 | 9,581 ₹38,324 | 7,910 ₹31,640 Lowest | 9,810 ₹39,240 |
| 5.00 | Oil filter | 4 | Each | 14,000 ₹56,000 | 13,713 ₹54,852 | 12,443 ₹49,772 | 18,569 ₹74,276 | 11,777 ₹47,108 Lowest | 14,413 ₹57,652 | 15,200 ₹60,800 |
| 6.00 | Gasket Set | 4 | Each Set | 16,500 ₹66,000 | 17,777 ₹71,108 | 15,237 ₹60,948 | 22,500 ₹90,000 | 15,831 ₹63,324 | 13,431 ₹53,724 Lowest | 19,633 ₹78,532 |
| 7.00 | Piston Ring and `O' Ring | 4 | Each Set | 7,000 ₹28,000 | 7,237 ₹28,948 | 7,121 ₹28,484 | 7,608 ₹30,432 | 7,070 ₹28,280 | 5,075 ₹20,300 Lowest | 7,410 ₹29,640 |
| 8.00 | Guide Ring | 4 | Each | 6,000 ₹24,000 | 6,347 ₹25,388 | 6,217 ₹24,868 | 6,633 ₹26,532 | 6,160 ₹24,640 | 4,633 ₹18,532 Lowest | 6,531 ₹26,124 |
| 9.00 | Suction Filter | 4 | Each | 17,000 ₹68,000 | 16,731 ₹66,924 | 15,331 ₹61,324 Lowest | 20,731 ₹82,924 | 15,773 ₹63,092 | 15,731 ₹62,924 | 18,232 ₹72,928 |
| 10.00 | Slide Valve Key | 4 | Each | 1,800 ₹7,200 | 1,737 ₹6,948 | 1,510 ₹6,040 | 1,931 ₹7,724 | 1,563 ₹6,252 | 1,431 ₹5,724 Lowest | 1,877 ₹7,508 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
30 Jun 2026, 6:00 pmClosed
CWE Karanja
CWE Karanja Naval Station Karanja, Uran, Navi Mumbai - 400 704
REPAIR MAINTENANCE OF AC PLANT INFRASTRUCTURE REPLACEMENT OF DEFECTIVE CONDENSER TUBES CHILLER TUBES HOT WATER GENERATOR SYSTEM ALONGWITH OTHER ACCESSORIES AT NAVAL STATION KARANJA
2026_MES_769213_1
84541-K/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Station Karanja
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE NW Karanja
₹1 L
7 Jul 2026
2 Jun 2026
4 Jul 2026
2 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for making operational of screw compressors chiller unit Make Blue star/Voltas complete all as per manufacturer's instruction by authorised dealers /workshop for improved performance and designed parameter including the following complete all as specified and as directed by Engr-in-charge.
(i) Replacement of compressor oil by authorised company person.
(i) Replacement of defective sensors,(Temperature & Pressure sensors), loading coils, MCS keypad including testing of the compressor and finding the faulty parts and replacement of the parts of the compressor and make it operational to the satisfication of the Engr-in-charge.
(ii) Complete testing of each part of AC plant cleaning each part of unit carrying out preventive work like oiling, greasing, replacing defective parts with vaccum test and pressure test at specified pressure to detect leak and again same tests after leak repair to ensure leakage in the complete system.
Note: (a) New spare parts of compressors as required shall be measured and paid seperately as supply only and cost of labour and T&P shall be deemed to include in the quoted rate of this item.
(b) Unit rate quoted shall include for the necessary electrical check i.e checking of panel wiring to run the compressor smoothly and transporting to authorised workshop.
(c) Before opening of compressor the freon gas to be taken in empty cylinder by the help ice or as directed by Engr-in-charge.
(d) Unit rate quoted shall also be included for testing the whole system for any leakage using nitrogen gas by vaccumising the system and filling the system with pressurise nitrogen to test the leakage including nitrogen gas as required and top up repaired compressor and whole system with refrigerant gas R-134 and compressor oil after confirmation of no leakage.
(e) Unit rate quoted shall also be inclusive of charging of compressor oil and refrigerant of sufficient quantity or as directed by Engr-in-charge.
(f) Items required for smooth functioning of unit other than the item mentioned in the schedule is included in the quoted rate of the item.
(g) Gas R-134 and compressor oil will be supplied by the department. | 4 | Each Job | - | - |
| 2 | Supply only following parts of Screw compressor complete all as specified and as directed by Engr-in-Charge. | - | - | - | - |
| 3 | Screw surface grinding | 4 | Each | - | - |
| 4 | Chemical for compressor cleaning | 4 | Each Job | - | - |
| 5 | Oil filter | 4 | Each | - | - |
| 6 | Gasket Set | 4 | Each Set | - | - |
| 7 | Piston Ring and `O' Ring | 4 | Each Set | - | - |
| 8 | Guide Ring | 4 | Each | - | - |
| 9 | Suction Filter | 4 | Each | - | - |
| 10 | Slide Valve Key | 4 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
SOC.pdf
Additional Documents • 0.26 MB
BOQ_861433.xls
BOQ • 0.43 MB
Tenderpage.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .