Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.5 LAdmitted-Finance | -38.21% | ₹18.5 L | L1 | Admitted-Finance |
| 2 | L2₹18.6 L+₹6,599.56 (0.36%)Admitted-Finance | -37.99% | ₹18.6 L+₹6,599.56 (0.36%) | L2 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
20 Jul 2026, 4:00 pmClosed
EXEN CRD SMC
EXEN CRD SMC
Imp/ upgradation of various links of Mansoor Colony at Bemina Phase-I
2026_HAUDD_315372_10
ENIT/22/CRD/SMC/DT.09-07-2026
Open Tender
Civil Works
Percentage
20 days
BEMINA
REFER TENDER DOCS
2 documents required · 2 mandatory
₹1,100
MUNICIPAL ACCOUNT
₹60,000
29 Jul 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 20 | No. | 20 | ₹400 |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 615 | Sqm | 24.12 | ₹14,833.8 |
| 3 | Providing and laying stone soling duly hand packed in trenches including proper ramming, watering etc. complete. | 87.21 | Cum | 900 | ₹78,489 |
| 4 | P/L, in position cement concrete of specified grade including curing but excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all inclusive leads, lifts, loading, un-loading, head load (if any) cost and carriage of material involved complete. | 145.35 | Cum | 5,500 | ₹7,99,425 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 40 mm nominal size) with all leads, lifts, loading, unloading, head load (if any) costs and carriages complete. | 290.7 | Cum | 7,000 | ₹20,34,900 |
| 6 | Centering & Shuttering including strutting propping etc. and removal form work for foundation, footings bases of columns blocks etc. complete. | 216 | Sqm | 286.35 | ₹61,851.6 |
| 7 | Providing, laying and fixing of Wooden/ glass 3 to 5 mm thick straps/ beeding of required size including cutting, propping, placing in position complete. | 136 | No. | 72.8 | ₹9,900.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1022674.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .