Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.9 CrAccepted-AOC G 8 PANDURANG BHAVAN BORADE PETROL PUMP CHOWK MALKAPUR KARAD SATARA DISTRICT | PUNE | MAHARASHTRA | 412206 | L1 | Accepted-AOC L1 Contractor | |
| 2 | L2₹58.5 Cr+₹8.6 Cr (17.3%)Rejected-AOC CTS NO 495 A 45 PLOT NO 46 SHIVSAMPADA MUTHA COLONY SADAR BAZAR SATARA | SATARA | SATARA | MAHARASHTRA | 415001 | L2 | Rejected-AOC L2 Contractor |
Tender Value
₹47.6 Cr
EMD Value
₹23.8 L
Closing Date
16 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, PMGSY, Pune Region, Pune
Superintending Engineer, Block No. 306, 3rd Floor, New Administrative Building, Opp. Council Hall, Camp, Pune - 411 001
Package No. Rd-SAN-A284, Twelve Road Works in Talula- Walwa and Shirala, Dist- Sangli
2024_MMGSY_1060425_4
12/2024-25
Open Tender
Civil Works - Roads
Percentage
730 days
Sangli
As Per NIT and SBD
8 documents required · 8 mandatory
₹29,500
₹23.8 L
Superintending Engineer (PMGSY), Pune Region Pune
9 Oct 2024
29 Jul 2024
19 Aug 2024
29 Jul 2024
16 Aug 2024
29 Jul 2024
5 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1)Proposed Improvement & Ten Year Maintenance of Kameri Chougule-Maliwasti To Shivpuri Road. CH 0/000 to 3/850 (LR-129 ,VR-395) in Taluka : Walwa, District : Sangli -Clearing and Grubbing Road Land-By mechenical means-In area of non-thorny jungle- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including all lifts, leads and including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201, As per directed by Engineer Incharge. | 1.54 | Hectar | 27,857.35 | ₹42,900.32 |
| - | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. | 4 | Each | 575.6 | ₹2,302.4 |
| - | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with all lifts and leads as per Technical Specification Clause 301.4, As per directed by Engineer Incharge. | 2,010 | Square Meter | 16.6 | ₹33,366 |
| - | Construction of Embankment with Material Obtained from borrow pits- Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5, As per directed by Engineer Incharge. | 3,884.31 | Cubic Meter | 562.15 | ₹21,83,564.87 |
| - | Construction of Subgrade and Earthen Shoulders-Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 including all lifts and leads as per Technical Specification Clause 303.1., As per directed by Engineer Incharge. | 11,515.13 | Cubic Meter | 664.8 | ₹76,55,258.42 |
| - | Excavation in Soil using Hydraulic Excavator and Tippers with disposal - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location including all lifts and leads as per Technical Specification Clause 302.3, As per directed by Engineer Incharge. | 9,568.91 | Cubic Meter | 77.7 | ₹7,43,504.31 |
| - | Construction of Embankment with Material Obtained from Roadway Cutting- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5, As per directed by Engineer Incharge. | 4,901.98 | CubiC Meter | 88.1 | ₹4,31,864.56 |
| - | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 As per directed by Engineer Incharge. | 2,423.07 | CubiC Meter | 114.15 | ₹2,76,593.44 |
| - | Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 As per directed by Engineer Incharge. | 605.77 | CubiC Meter | 488.95 | ₹2,96,191.24 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.As per directed by Engineer Incharge. | 82.46 | CubiC Meter | 2,515.05 | ₹2,07,391.02 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1851067.xls
BOQ • 0.70 MB
149193004.pdf
Tender Documents • 0.40 MB
149193006.html
Tender Documents • 0.06 MB
SBDandOther.rar
Tender Documents • 11.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .