Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance PLOT NO 5 SATHYAM GARDEN UYIRIYAL POONGA ROAD GORIMEDU SALEM 636 008 | SALEM | SALEM | TAMIL NADU | 636008 | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹25.1 L (11.3%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹2.5 Cr+₹25.1 L (11.3%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 Cr+₹30.0 L (13.5%)Admitted-Finance | ₹2.5 Cr+₹30.0 L (13.5%) | L3 | Admitted-Finance |
| 4 | L4₹3.5 Cr+₹1.3 Cr (57.4%)Admitted-Finance | ₹3.5 Cr+₹1.3 Cr (57.4%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | RAJ ENGINEERING CONTRACTOR L1 | M s Kumaresan and co L2 | M/s.Vetriconstructions L3 | Arun and Co L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard gravelly soil | 5,625 | m3 | - | - | - | - |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in SDR not requring blasting | 750 | m3 | - | - | - | - |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in MR and DMR not requring blasting | 750 | m3 | - | - | - | - |
| 4.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard rock requring blasting | 375 | m3 | - | - | - | - |
| 5.00 | Laying of PCC 1:4: 8 mix using 20mm HBG machine crushed metal for foundation matt concrete without form work including cost of all labour,materials ,lead ,lift ,curing etc.complete | 116 | m3 | - | - | - | - |
| 6.00 | RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for plinth and other works with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement.( FOOTING ) | 723 | m3 | - | - | - | - |
| 7.00 | RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for Plinth with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site.(COLUMN ) | 209 | m3 | - | - | - | - |
| 8.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site. | 42 | MT | - | - | - | - |
| 9.00 | supply of template set to suit VC and WC columns foundation bolts fixing etc including cost of all labour lead and lift etc complete | 2,130 | Kgs | - | - | - | - |
| 10.00 | Labour charges for setting of template set for AH tower foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete | 20 | Nos | - | - | - | - |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
18 Dec 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru.vi.ka Industrial Estate, Guindy, Chennai -32.
Providing foundation concrete, erection of AH tower,WC,VC with BH,WB,C and F booms, gravel filling at Nallur 230/110 KV SS (P.VelLur)
2019_EB_147788_1
TP1-068/2019-20
Open Tender
Civil Works
Works
120 days
NALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.7 L
Yes
19 Feb 2020
19 Nov 2019
19 Dec 2019
19 Nov 2019
18 Dec 2019
19 Nov 2019
Amount
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard gravelly soil
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in SDR not requring blasting
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in MR and DMR not requring blasting
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard rock requring blasting
Laying of PCC 1:4: 8 mix using 20mm HBG machine crushed metal for foundation matt concrete without form work including cost of all labour,materials ,lead ,lift ,curing etc.complete
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for plinth and other works with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement.( FOOTING )
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for Plinth with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site.(COLUMN )
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site.
supply of template set to suit VC and WC columns foundation bolts fixing etc including cost of all labour lead and lift etc complete
Labour charges for setting of template set for AH tower foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete
Labour charges for setting of template set for VC and WC columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete
Erection of Tower sorting out of Tower parts and erection and final checking including cost of all materials lead lift etc complete.
Transporting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete
Re-Filling in foundation and basement with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Plastering with CM 1:3, mix 12mm thick for plinth including all cost labour materials lead lift etc complete and as directed by the Engineer-in-charge at site.
Colour washing 2 Coats over a base coat of primer using Exterior weather coat using Asian APEX or Equivalent of approved Brand, quality and colour for outer surfaces including cost of all labours to work at all levels cost of materials brushes, scaffolding charges etc. complete complying with standard specification and and as directed by the Engineer-in-charge at site.
Fabrication and supply of foundation bolts with average depth of 2.00m including providing L angle at bottom and threading at top and galvanizing the top of bolt including cost of 20mm dia rod, 3 nos nuts all materials, labour lead lift etc complete
Fabrication and supply of tower parts including cost of all materials, labour lead lift etc complete
Providing Anchor /Grip rod for foundation in the rock surface with drilling of 40 mm dia holes and fixing of 25 mm dia RTS rod 1.5m length inside the holes and 1m length out side the holes with L shape bending including cost of all materials labour lead lift etc complete.
Supplying and fixing of 65 mm GI pipe "B " Class of approved ISI make for road crossing to protect the Water line including all specials and cost of all material, lead, lift, etc., complete as per standard specification and as directed by the Engineer-in-charge at site.
Providing and laying PVC high density of 40 MM DIA PVC PIPE including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete and as directed by the Engineer-in-charge at site.
Providing and laying PVC high density of 25MM DIA PVC PIPE including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete and as directed by the Engineer-in-charge at site.
Providing and fixing wheel valve of 40 MM DIA of Gun metal made including cost of all materials, labour, lead and lift etc., complete and as directed by the Engineer-in-charge at site.
Providing and fixing wheel valve of 25MM DIA of Gun metal made including cost of all materials, labour, lead and lift etc., complete and as directed by the Engineer-in-charge at site.
Chromium coated metal tap of 12 mm size Long body
Providing pipe type earthing using 40 mm dia G I pipe 3m length drilling with 6mm dia holes staggered at 230mm interval ,top falttened and providing 17.5m dia hole 2nos.fabrication of earth strip including cost of pipe,GI 7/3.55 E.wire 3.00 m length all labour, lead, lift etc. complete.
Supplying and fixing readymade earth collars of size 60 cm inner dia with 30 cm height and shell thickness of 50 mm with cover slab including cost of all materials, transport to site, labour, lead, lift, etc., complete as per standard specification.
Supplying and fixing of SINTEX pvc water tank of 1000 litres capasity with necessary specials and fittings including cost of all materials , lead lift etc complete
Supplying and Filling in yard area , consolidation as per specification & with power roller including all labour lead and lift etc complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M s Kumaresan and co
M/s.Vetriconstructions
Arun and Co
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_177923.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .