| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC VILL DEVARI KALA KARCHHANA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹4.2 Cr | L1 | Accepted-AOC Accept |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
4 Mar 2021, 2:00 pmClosed
se, iwc,prayagraj
se, iwc,prayagraj
STONE BOULDER PITCHING ON THE SLOPE OF BUXI BUNDH IN BETWEEN KM. 0.450 TO 1.700 AT RIGHT BANK OF GANGA RIVER IN PRAYAGRAJ
2021_UPIDC_560306_1
05/SE/2020-21
Open Tender
Civil Works
Item Wise
270 days
buxi bundh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹8.8 L
Yes
22 Mar 2021
27 Feb 2021
4 Mar 2021
27 Feb 2021
4 Mar 2021
27 Feb 2021
Amount
Earth work excavation in foundation of toe , pannel wall and slope of bundh in all type of soil including all leads-lifts, labour and T & P etc. complete required for proper completion of work.
Making and laying wire crate of size 2.50 m.×1.50 m.×1.00 m made of double knotted net mesh size 200mmx200mm of 8 SWG G.I wire and closely packed with hammer dressed Stone Boulder upto 25 to 50 kg.,Including cost of all materials, lead,lift, delift,labour and T&P etc. all complete .
Laying Cement .Concrete 1:3:6 grade M-10 in foundation with cement, coarse sand (f.M>2.00) and graded Shankargarh stone ballast 20 mm to 40 mm size with mechanical mixing, compaction, including cost of all materials, labour , T & P, taxes and octroi etc, required for proper completion of work. as per direction of Engineer- in- charge
R.R. Stone Masonary with Shankargarh Stone boulder in 1:4 CM with cement and coarse sand (f.M>2.00) with machanical mixing including cost of all materials, labour , T & P, taxes and etc, required for proper completion of work. as per direction of Engineer- in- charge.
Supplying and laying Geo Textile sheet below pitching made of 200 GSM woven multifilament polypropylene yarn .
Supplying and laying 25 to 50 kg. stone boulder pitching 450/250 mm thick on river side &city side slope of buxi bundh including cost of all materials, labour , T & P, taxes and etc, required for proper completion of work. as per direction of Engineer- in- charge
Laying Cement .Concrete 1:1.5:3 (M-20) on top of chute drain and toe & pannel wall with cement, coarse sand (f.M>2.00) and graded B. K. grit 4.75 mm to 20 mm size with machanical mixing, compaction including cost of all materials, labour and T & P, taxes etc, required for proper completion of work.
Earth work in making of embankment of buxi bundh filling by executed earth from slope of Buxi bundh with all leads, lifts and manual compaction, labour and T.&P. etc. Requierd for proper completion of work as per direction of Engineer in charge.
Disposal of executed earth/malwa including cost of all lead, labour and T & P, etc, required for proper completion of work.
Earth work in making of embankment of buxi bundh filling good quality earth from approved barrow area with all leads, lifts and manual compaction, labour and T.&P. etc. Required for proper completion of work as per direction of Engineer in charge.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .