| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹8.3 LAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹8.3 L | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE QUALIFIED BIDDER |
| 2 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY REJECTED |
| 3 | Rejected-Technical MORWA SHUKLA MODE WARD NO 2 P O SINGRAULI DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | - | - | Rejected-Technical TECHNICALLY REJECTED |
| Sl No | Description | Qty | Unit | Larsen and Toubro Limited L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: 1. Preparation and Initial Dismantling: a) Clean the working area of both H-frames from grounded shovels (Parallel activity). b) Dismantle two (02) track frames from the grounded machine by opening or cutting bolts etc. . 2. Components Dismantling from Grounded H-Frames: Remove key components, including lower roller mounting supports, upper rollers, and track guards. Additionally, remove broken bolts from the track guards, carriers and track rollers of both H-frames etc. 3. Dismantling of the Existing Track Frame: Remove one (01) track frame from the working machine by opening or cutting bolts etc. . 4. Component Replacement and Assembly: a) Dismantle components such as the chain, sprocket, final drive assembly, idlers, lower & upper rollers, and track guards etc. b) Reassemble these components into another serviceable track frame etc. . 5. Final Installation: Install the assembled track frame into the machine, perform a final check of its functionality, and re-torque the frame bolts as needed etc. Note: The maximum deployment of manpower for the above job will be as 1. Highly Skilled (Supervisor) for 52 nos. manshifts, 2. Skiled Manpower (Fitter) for 312 nos. manshifts 3. Skilled Manpower (Welder) for 104 nos. manshifts 4. Semi-skilled for 312 nos. manshifts. | ||||
| 1.10 | Labour charges for items (1) to (5) mentioned under the scope of work for Dismantling & Replacement of Track Frame on PC2000-8, Sl. No.20625 Shovel at Khadia Project, including contractor's profit. | 1 | Job | 5,93,944 ₹5.9 L |
| 2.00Hiring Charges for above job. | ||||
| 2.10 | Welding Machine - 02 Nos. for max. period of 26 days for 01 Job. | 1 | Job | 2,600 ₹2,600 |
| 2.20 | Gas cutting sets with access. - 02 Nos. for max. period of 26 days for 01 Job. | 1 | Job | 2,340 ₹2,340 |
| 2.30 | Grinders - 02 Nos. for max. period of 26 days for 01 Job. | 1 | Job | 2,340 ₹2,340 |
| 2.40 | Grinding wheels - Max. 04 Nos. for 01 Job. | 4 | Nos. | 50 ₹200 |
| 2.50 | Hydraulic Jack (300T) – 02 Nos. for max. period of 26 days for 01 Job. | 1 | Job | 5,200 ₹5,200 |
| 2.60 | Transportation Charges- 01 No. Jeep for max. period of 26 days. | 26 | Days | 500 ₹13,000 |
| 2.70 | Special Tool for Jacking Fixture for Track Frame. | 2 | Nos. | 20,000 ₹40,000 |
Updated dates
Tender Value
₹8.9 L
EMD Value
₹11,200
Closing Date
20 Mar 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Dismantling and Replacement of Track Frame on PC2000-8, Sl. No. 20625 Shovel at Khadia Project.
2026_NCL_355332_1
KHD/G.M. (Excv)/E-Tender/25-26/1275
Open Tender
Excavation Department Work
26 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹11,200
18 May 2026
3 Mar 2026
21 Mar 2026
3 Mar 2026
20 Mar 2026
5 Mar 2026
3 Mar 2026 - 11 Mar 2026
Scope of Work/Technical Specifications etc: 1. Preparation and Initial Dismantling: a) Clean the working area of both H-frames from grounded shovels (Parallel activity). b) Dismantle two (02) track frames from the grounded machine by opening or cutting bolts etc. . 2. Components Dismantling from Grounded H-Frames: Remove key components, including lower roller mounting supports, upper rollers, and track guards. Additionally, remove broken bolts from the track guards, carriers and track rollers of both H-frames etc. 3. Dismantling of the Existing Track Frame: Remove one (01) track frame from the working machine by opening or cutting bolts etc. . 4. Component Replacement and Assembly: a) Dismantle components such as the chain, sprocket, final drive assembly, idlers, lower & upper rollers, and track guards etc. b) Reassemble these components into another serviceable track frame etc. . 5. Final Installation: Install the assembled track frame into the machine, perform a final check of its functionality, and re-torque the frame bolts as needed etc. Note: The maximum deployment of manpower for the above job will be as 1. Highly Skilled (Supervisor) for 52 nos. manshifts, 2. Skiled Manpower (Fitter) for 312 nos. manshifts 3. Skilled Manpower (Welder) for 104 nos. manshifts 4. Semi-skilled for 312 nos. manshifts.
Labour charges for items (1) to (5) mentioned under the scope of work for Dismantling & Replacement of Track Frame on PC2000-8, Sl. No.20625 Shovel at Khadia Project, including contractor's profit.
Hiring Charges for above job.
Welding Machine - 02 Nos. for max. period of 26 days for 01 Job.
Gas cutting sets with access. - 02 Nos. for max. period of 26 days for 01 Job.
Grinders - 02 Nos. for max. period of 26 days for 01 Job.
Grinding wheels - Max. 04 Nos. for 01 Job.
Hydraulic Jack (300T) – 02 Nos. for max. period of 26 days for 01 Job.
Transportation Charges- 01 No. Jeep for max. period of 26 days.
Special Tool for Jacking Fixture for Track Frame.
Misc. tools & tackles like spanners, hammers, crow bars, heavy duty sockets, extensions, torque wrench ,safety PPE kit, markin clothes,cotton waste and hand washing soap etc. for 01 Job.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
ITB.pdf
Tender Documents • 0.38 MB
COC_ATC.pdf
Tender Documents • 1.48 MB
Annexures.pdf
Tender Documents • 0.81 MB
BOQ_368181.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid